Combined Notice of Filings #2, 14000-14002 [2022-05168]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 14000 Federal Register / Vol. 87, No. 48 / Friday, March 11, 2022 / Notices Description: Notice of Change in Status of EDF Trading North America, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5245. Comment Date: 5 pm ET 3/24/22. Docket Numbers: ER11–2375–002. Applicants: Consolidated Edison Company of New York, Inc. Description: Notice of Non-Material Change in Status of Consolidated Edison Company of New York, Inc. Filed Date: 3/3/22. Accession Number: 20220303–5247. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER11–2753–008; ER12–1316–007. Applicants: Silver State Solar Power North, LLC, Cedar Point Wind, LLC. Description: Notice of Non-Material Change in Status of Cedar Point Wind, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5246. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER14–2140–012; ER14–2141–012; ER14–2465–014; ER14–2466–014; ER14–2939–011; ER15–632–013; ER15–634–013; ER15– 1952–010; ER15–2728–013. Applicants: Maricopa West Solar PV, LLC, Pavant Solar LLC, Cottonwood Solar, LLC, CID Solar, LLC, Imperial Valley Solar Company (IVSC) 2, LLC, RE Camelot LLC, RE Columbia Two LLC, Selmer Farm, LLC, Mulberry Farm, LLC. Description: Notice of Non-Material Change in Status of CID Solar, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5244. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER17–1742–000; ER20–2510–000; ER13–2490–003; ER19–2671–000; ER19–2672–000; ER20–2512–000; ER20–2515–000; ER19–2595–000; ER19–2670–000; ER20–2663–000; ER17–311–000; ER20– 1073–000; ER21–2408–000; ER21–2409– 000; ER21–2407–000; ER21–2406–000; ER21–2638–000; ER17–1742–004; ER20–2510–002; ER13–2490–008; ER19–2671–003; ER19–2672–003; ER20–2512–002; ER20–2515–002; ER19–2595–003; ER19–2670–003; ER20–2663–002; ER17–311–004; ER20– 1073–002; ER21–2408–001; ER21–2409– 001; ER21–2407–001; ER21–2406–001; ER21–2638–001. Applicants: SR Perry, LLC, Lancaster Solar LLC, SR Georgia Portfolio II Lessee, LLC, SR Snipesville II, LLC, SR Lumpkin, LLC, SR Terrell, LLC, SR South Loving LLC, SR Snipesville, LLC, SR Meridian III, LLC, SR Hazlehurst III, LLC, SR Georgia Portfolio I MT, LLC, SR Baxley, LLC, SR Arlington II MT, LLC, SR Arlington II, LLC, Simon Solar, LLC, VerDate Sep<11>2014 17:10 Mar 10, 2022 Jkt 256001 Odom Solar LLC, Hattiesburg Farm, LLC. Description: Notice of Change in Status of Hattiesburg Farm, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5242. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER18–140–008; ER11–3406–008; ER11–3407–008; ER12–1865–009; ER12–1923–007; ER12–1925–007; ER20–3036–001; ER20–3037–001. Applicants: Vopak Industrial Infrastructure Americas St. Charles, LLC, Vopak Industrial Infrastructure Americas Plaquemine, LLC, Patton Wind Farm, LLC, Big Savage, LLC, Mustang Hills, LLC, Howard Wind LLC, Highland North LLC, Lackawanna Energy Center LLC. Description: Notice of Change in Status of Lackawanna Energy Center LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5249. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER21–1915–001. Applicants: Big Sky Wind, LLC. Description: Notice of Change in Status of Big Sky Wind, LLC. Filed Date: 3/3/22. Accession Number: 20220303–5243. Comment Date: 5 p.m. ET 3/24/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–05167 Filed 3–10–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP22–678–000. Applicants: Hummel Generation, LLC, Hummel Generation, LLC v. UGI Sunbury, LLC. Description: Complaint of Hummel Generation, LLC v. UGI Sunbury, LLC. Filed Date: 3/4/22. Accession Number: 20220304–5238. Comment Date: 5 p.m. ET 3/16/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–05166 Filed 3–10–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1849–027; ER10–1852–062; ER12–895–026; ER12– 1228–028; ER13–712–029; ER14–2707– 023; ER15–1925–021; ER15–2676–020; ER16–1672–018; ER16–2190–017; ER16–2191–017; ER16–2275–016; ER16–2276–016; ER16–2453–018; ER17–2152–014; ER18–882–013; ER18– E:\FR\FM\11MRN1.SGM 11MRN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 48 / Friday, March 11, 2022 / Notices 1863–011; ER18–2003–012; ER18–2118– 013; ER18–2182–012; ER20–1907–005; ER20–2064–006; ER21–2149–004; ER21–2296–003. Applicants: Ensign Wind Energy, LLC, Minco Wind Energy II, LLC, High Majestic Wind I, LLC, Minco Wind I, LLC, Minco IV & V Interconnection, LLC, Armadillo Flats Wind Project, LLC, Lorenzo Wind, LLC, Coolidge Solar I, LLC, Elk City Renewables II, LLC, Cottonwood Wind Project, LLC, Brady Interconnection, LLC, Kingman Wind Energy II, LLC, Kingman Wind Energy I, LLC, Brady Wind II, LLC, Brady Wind, LLC, Chaves County Solar, LLC, Cedar Bluff Wind, LLC, Breckinridge Wind Project, LLC, Mammoth Plains Wind Project, LLC, Cimarron Wind Energy, LLC, High Majestic Wind II, LLC, Minco Wind Interconnection Services, LLC, Florida Power & Light Company, Elk City Wind, LLC. Description: Notice of Change in Status of Elk City Wind, LLC (Part 1 of 2), et al. Filed Date: 3/3/22. Accession Number: 20220303–5255. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–1910–023; ER10–1911–023. Applicants: Duquesne Power, LLC, Duquesne Light Company. Description: Notice of Change in Status of Duquesne Light Company, et al. Filed Date: 3/3/22. Accession Number: 20220303–5256. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER11–2376–001; ER11–2376–002. Applicants: Orange and Rockland Utilities, Inc. Description: Notice of Non-Material Change in Status of Orange and Rockland Utilities, Inc. Filed Date: 3/3/22. Accession Number: 20220303–5251. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER17–1607–004; ER17–1608–004; ER20–27–004. Applicants: Wright Solar Park LLC, Sunray Energy 3 LLC, Sunray Energy 2, LLC. Description: Notice of Non-Material Change in Status of Sunray Energy 2, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5252. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER21–2652–004. Applicants: Caddo Wind, LLC. Description: Notice of Non-Material Change in Status of Caddo Wind, LLC. Filed Date: 3/4/22. Accession Number: 20220304–5288. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER21–2699–004; ER18–2066–007; ER11–4462–064; VerDate Sep<11>2014 17:10 Mar 10, 2022 Jkt 256001 ER17–838–039; ER10–1951–042; ER16– 2241–016; ER20–792–006; ER16–2297– 016; ER14–2710–023; ER15–58–021; ER20–1991–006; ER18–1981–012; ER16–1440–017; ER19–1128–006; ER16–2240–017; ER14–2709–023; ER15–30–021; ER14–2708–024; ER18– 2314–008; ER20–2603–006; ER20–780– 006; ER20–2597–006; ER13–2474–022; ER20–2237–006; ER19–2495–008; ER18–2032–012; ER20–637–006; ER19– 2513–008. Applicants: Wilton Wind Energy II, LLC, Wilton Wind Energy I, LLC, Wildcat Ranch Wind Project, LLC, Wessington Springs Wind, LLC, Weatherford Wind, LLC, Steele Flats Wind Project, LLC, Soldier Creek Wind, LLC, Sooner Wind, LLC, Skeleton Creek Wind, LLC, Sholes Wind Energy, LLC, Seiling Wind, LLC, Seiling Wind Interconnection Services, LLC, Seiling Wind II, LLC, Rush Springs Wind Energy, LLC, Rush Springs Energy Storage, LLC, Roswell Solar, LLC, Pratt Wind, LLC, Ponderosa Wind, LLC, Palo Duro Wind Interconnection Services, LLC, Palo Duro Wind Energy, LLC, Osborn Wind Energy, LLC, Oklahoma Wind, LLC, Ninnescah Wind Energy, LLC, Gexa Energy L.L.C., NextEra Energy Marketing, LLC, NEPM II, LLC, Minco Wind IV, LLC, Minco Wind Energy III, LLC. Description: Notice of Change in Status of Elk City Wind, LLC (Part 2 of 2), et al. Filed Date: 3/3/22. Accession Number: 20220303–5257. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER22–921–001. Applicants: Public Service Company of Colorado. Description: Tariff Amendment: 2022–03–07 PSC–CORE–SISA–670– Admin Update to be effective 1/29/ 2022. Filed Date: 3/7/22. Accession Number: 20220307–5133. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1065–001. Applicants: Rabbitbrush Solar, LLC. Description: Tariff Amendment: Amendment to MBR Petition and Request for Expedited Action to be effective 2/17/2022. Filed Date: 3/7/22. Accession Number: 20220307–5170. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1199–000. Applicants: New York State Electric & Gas Corporation. Description: New York State Electric & Gas Company submits a Request for Limited One-Time Prospective Waiver of Tariff Provisions with Expedited Consideration. Filed Date: 3/3/22. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 14001 Accession Number: 20220303–5231. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER22–1203–000. Applicants: Dominion Energy South Carolina, Inc. Description: Compliance filing: Order 676–J Compliance filing to be effective 12/31/9998. Filed Date: 3/7/22. Accession Number: 20220307–5074. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1207–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: Joint 205 SGIA among NYISO, NMPC, KCE NY 6 for Battery Storage Project SA2673 to be effective 2/18/2022. Filed Date: 3/7/22. Accession Number: 20220307–5118. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1208–000; ER21–1294–000; ER22–671–000. Applicants: SunZia Transmission, LLC, Pattern Energy Group LP, SunZia Transmission, LLC, SunZia Transmission, LLC. Description: SunZia Transmission, LLC et al. Request for Negotiated Rate Authorization and Filing of a PostSelection Open Solicitation Report. Filed Date: 3/1/22. Accession Number: 20220301–5387. Comment Date: 5 p.m. ET 3/22/22. Docket Numbers: ER22–1209–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Louise Solar (Texana Solar) 1st A&R Generation Interconnection Agreement to be effective 2/22/2022. Filed Date: 3/7/22. Accession Number: 20220307–5135. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1210–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: RS 411 Black Hills PSA 3rd Amended to be effective 5/1/2022. Filed Date: 3/7/22. Accession Number: 20220307–5143. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1211–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, SA No. 6376; Queue Nos. AC2–100 and AD1–131 to be effective 2/ 4/2022. Filed Date: 3/7/22. Accession Number: 20220307–5157. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1212–000. Applicants: Tucson Electric Power Company. E:\FR\FM\11MRN1.SGM 11MRN1 lotter on DSK11XQN23PROD with NOTICES1 14002 Federal Register / Vol. 87, No. 48 / Friday, March 11, 2022 / Notices Description: Compliance filing: Revisions to Market-Based Rate Tariff Reflecting EIM Participation to be effective 5/3/2022. Filed Date: 3/7/22. Accession Number: 20220307–5173. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1213–000. Applicants: UNS Electric, Inc. Description: Compliance filing: Revisions to Market-Based Rate Tariff Reflecting EIM Participation to be effective 5/3/2022. Filed Date: 3/7/22. Accession Number: 20220307–5174. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1214–000. Applicants: UniSource Energy Development Company. Description: Compliance filing: Revisions to Market-Based Rate Tariff Reflecting EIM Participation to be effective 5/3/2022. Filed Date: 3/7/22. Accession Number: 20220307–5176. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1215–000. Applicants: Public Service Company of Colorado. Description: Tariff Amendment: 2022–03–07 PSC–CORE–SISA–670– Admin–Cancel to be effective 3/8/2022. Filed Date: 3/7/22. Accession Number: 20220307–5183. Comment Date: 5 p.m. ET 3/28/22. Docket Numbers: ER22–1216–000. Applicants: Public Service Company of New Mexico. Description: § 205(d) Rate Filing: 4th Revised NTUA/NOA Agreements to be effective 3/1/2022. Filed Date: 3/7/22. Accession Number: 20220307–5187. Comment Date: 5 p.m. ET 3/28/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 17:10 Mar 10, 2022 Jkt 256001 Dated: March 7, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–05168 Filed 3–10–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2079–111] Placer County Water Agency; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types of Application: Non-capacity amendment of license. b. Project No.: 2079–111. c. Date Filed: January 27, 2022. d. Applicants: Placer County Water Agency. e. Name of Projects: Middle Fork American River. f. Location: Placer and El Dorado Counties, California on the Middle Fork of the American River, the Rubicon River, and Duncan Creek and North and South Fork Long Canyon creeks. g. Filed Pursuant to: 18 CFR 4.200. h. Applicant Contact: General Manager, Placer County Water Agency, P.O. Box 6750, Auburn, CA 95604, (530) 823–4860. i. FERC Contact: David Rudisail, (202) 502–6376, david.rudisail@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P– 2079–111. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Request: Placer County Water Agency proposes to install two pneumatic crest gates within the existing spillway, two micro-hydro units that will charge a battery pack for operation of the gates, and downstream fish passage structures. The modifications are necessary to comply with requirements of the project license issued June 8, 2020. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 87, Number 48 (Friday, March 11, 2022)]
[Notices]
[Pages 14000-14002]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-05168]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1849-027; ER10-1852-062; ER12-895-026; ER12-
1228-028; ER13-712-029; ER14-2707-023; ER15-1925-021; ER15-2676-020; 
ER16-1672-018; ER16-2190-017; ER16-2191-017; ER16-2275-016; ER16-2276-
016; ER16-2453-018; ER17-2152-014; ER18-882-013; ER18-

[[Page 14001]]

1863-011; ER18-2003-012; ER18-2118-013; ER18-2182-012; ER20-1907-005; 
ER20-2064-006; ER21-2149-004; ER21-2296-003.
    Applicants: Ensign Wind Energy, LLC, Minco Wind Energy II, LLC, 
High Majestic Wind I, LLC, Minco Wind I, LLC, Minco IV & V 
Interconnection, LLC, Armadillo Flats Wind Project, LLC, Lorenzo Wind, 
LLC, Coolidge Solar I, LLC, Elk City Renewables II, LLC, Cottonwood 
Wind Project, LLC, Brady Interconnection, LLC, Kingman Wind Energy II, 
LLC, Kingman Wind Energy I, LLC, Brady Wind II, LLC, Brady Wind, LLC, 
Chaves County Solar, LLC, Cedar Bluff Wind, LLC, Breckinridge Wind 
Project, LLC, Mammoth Plains Wind Project, LLC, Cimarron Wind Energy, 
LLC, High Majestic Wind II, LLC, Minco Wind Interconnection Services, 
LLC, Florida Power & Light Company, Elk City Wind, LLC.
    Description: Notice of Change in Status of Elk City Wind, LLC (Part 
1 of 2), et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5255.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-1910-023; ER10-1911-023.
    Applicants: Duquesne Power, LLC, Duquesne Light Company.
    Description: Notice of Change in Status of Duquesne Light Company, 
et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5256.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER11-2376-001; ER11-2376-002.
    Applicants: Orange and Rockland Utilities, Inc.
    Description: Notice of Non-Material Change in Status of Orange and 
Rockland Utilities, Inc.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5251.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER17-1607-004; ER17-1608-004; ER20-27-004.
    Applicants: Wright Solar Park LLC, Sunray Energy 3 LLC, Sunray 
Energy 2, LLC.
    Description: Notice of Non-Material Change in Status of Sunray 
Energy 2, LLC, et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5252.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER21-2652-004.
    Applicants: Caddo Wind, LLC.
    Description: Notice of Non-Material Change in Status of Caddo Wind, 
LLC.
    Filed Date: 3/4/22.
    Accession Number: 20220304-5288.
    Comment Date: 5 p.m. ET 3/25/22.

    Docket Numbers: ER21-2699-004; ER18-2066-007; ER11-4462-064; ER17-
838-039; ER10-1951-042; ER16-2241-016; ER20-792-006; ER16-2297-016; 
ER14-2710-023; ER15-58-021; ER20-1991-006; ER18-1981-012; ER16-1440-
017; ER19-1128-006; ER16-2240-017; ER14-2709-023; ER15-30-021; ER14-
2708-024; ER18-2314-008; ER20-2603-006; ER20-780-006; ER20-2597-006; 
ER13-2474-022; ER20-2237-006; ER19-2495-008; ER18-2032-012; ER20-637-
006; ER19-2513-008.
    Applicants: Wilton Wind Energy II, LLC, Wilton Wind Energy I, LLC, 
Wildcat Ranch Wind Project, LLC, Wessington Springs Wind, LLC, 
Weatherford Wind, LLC, Steele Flats Wind Project, LLC, Soldier Creek 
Wind, LLC, Sooner Wind, LLC, Skeleton Creek Wind, LLC, Sholes Wind 
Energy, LLC, Seiling Wind, LLC, Seiling Wind Interconnection Services, 
LLC, Seiling Wind II, LLC, Rush Springs Wind Energy, LLC, Rush Springs 
Energy Storage, LLC, Roswell Solar, LLC, Pratt Wind, LLC, Ponderosa 
Wind, LLC, Palo Duro Wind Interconnection Services, LLC, Palo Duro Wind 
Energy, LLC, Osborn Wind Energy, LLC, Oklahoma Wind, LLC, Ninnescah 
Wind Energy, LLC, Gexa Energy L.L.C., NextEra Energy Marketing, LLC, 
NEPM II, LLC, Minco Wind IV, LLC, Minco Wind Energy III, LLC.
    Description: Notice of Change in Status of Elk City Wind, LLC (Part 
2 of 2), et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5257.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER22-921-001.
    Applicants: Public Service Company of Colorado.
    Description: Tariff Amendment: 2022-03-07 PSC-CORE-SISA-670-Admin 
Update to be effective 1/29/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5133.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1065-001.
    Applicants: Rabbitbrush Solar, LLC.
    Description: Tariff Amendment: Amendment to MBR Petition and 
Request for Expedited Action to be effective 2/17/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5170.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1199-000.
    Applicants: New York State Electric & Gas Corporation.
    Description: New York State Electric & Gas Company submits a 
Request for Limited One-Time Prospective Waiver of Tariff Provisions 
with Expedited Consideration.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5231.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER22-1203-000.
    Applicants: Dominion Energy South Carolina, Inc.
    Description: Compliance filing: Order 676-J Compliance filing to be 
effective 12/31/9998.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5074.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1207-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: New York Independent System 
Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: Joint 205 
SGIA among NYISO, NMPC, KCE NY 6 for Battery Storage Project SA2673 to 
be effective 2/18/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5118.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1208-000; ER21-1294-000; ER22-671-000.
    Applicants: SunZia Transmission, LLC, Pattern Energy Group LP, 
SunZia Transmission, LLC, SunZia Transmission, LLC.
    Description: SunZia Transmission, LLC et al. Request for Negotiated 
Rate Authorization and Filing of a Post-Selection Open Solicitation 
Report.
    Filed Date: 3/1/22.
    Accession Number: 20220301-5387.
    Comment Date: 5 p.m. ET 3/22/22.

    Docket Numbers: ER22-1209-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Louise Solar (Texana 
Solar) 1st A&R Generation Interconnection Agreement to be effective 2/
22/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5135.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1210-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: RS 411 Black Hills PSA 3rd 
Amended to be effective 5/1/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5143.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1211-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA, SA No. 6376; 
Queue Nos. AC2-100 and AD1-131 to be effective 2/4/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5157.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1212-000.
    Applicants: Tucson Electric Power Company.

[[Page 14002]]

    Description: Compliance filing: Revisions to Market-Based Rate 
Tariff Reflecting EIM Participation to be effective 5/3/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5173.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1213-000.
    Applicants: UNS Electric, Inc.
    Description: Compliance filing: Revisions to Market-Based Rate 
Tariff Reflecting EIM Participation to be effective 5/3/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5174.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1214-000.
    Applicants: UniSource Energy Development Company.
    Description: Compliance filing: Revisions to Market-Based Rate 
Tariff Reflecting EIM Participation to be effective 5/3/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5176.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1215-000.
    Applicants: Public Service Company of Colorado.
    Description: Tariff Amendment: 2022-03-07 PSC-CORE-SISA-670-Admin-
Cancel to be effective 3/8/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5183.
    Comment Date: 5 p.m. ET 3/28/22.

    Docket Numbers: ER22-1216-000.
    Applicants: Public Service Company of New Mexico.
    Description: Sec.  205(d) Rate Filing: 4th Revised NTUA/NOA 
Agreements to be effective 3/1/2022.
    Filed Date: 3/7/22.
    Accession Number: 20220307-5187.
    Comment Date: 5 p.m. ET 3/28/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-05168 Filed 3-10-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.