Combined Notice of Filings #1, 13725-13727 [2022-05055]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 47 / Thursday, March 10, 2022 / Notices AEP West Virginia Transmission Company, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Electric Power Service Corporation submits tariff filing per 35.13(a)(2)(iii: AEP revisions to PJM OATT Atts. H–14 and H–20 re: AEPLiberty Util. Transaction to be effective 12/31/9998. Filed Date: 3/4/22. Accession Number: 20220304–5077. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1196–000. Applicants: Kentucky Power Company, AEP Kentucky Transmission Company, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Kentucky Power Company submits tariff filing per 35.13(a)(2)(iii: KY Power and AEP KY Transmission submit OATT Atts. H–35 & H–36 to be effective 12/31/ 9998. Filed Date: 3/4/22. Accession Number: 20220304–5085. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1196–001. Applicants: Kentucky Power Company, AEP Kentucky Transmission Company, Inc., PJM Interconnection, L.L.C. Description: Tariff Amendment: Kentucky Power Company submits tariff filing per 35.17(b): Amendment to KY Power & AEP KY Transmission Atts. H–35 & H–36 to be effective 12/31/9998. Filed Date: 3/4/22. Accession Number: 20220304–5118. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1197–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: SCE Second Amended LGIA-Catalina Solar TOT455—SA No. 114 to be effective 3/5/2022. Filed Date: 3/4/22. Accession Number: 20220304–5099. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1198–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA No. 5448; Queue No. AF2– 139 to be effective 2/2/2022. Filed Date: 3/4/22. Accession Number: 20220304–5112. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1200–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to OATT and OA to implement intelligent reserve deployment construct to be effective 6/1/2022. Filed Date: 3/4/22. VerDate Sep<11>2014 16:20 Mar 09, 2022 Jkt 256001 Accession Number: 20220304–5134. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1201–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Niagara Mohawk Power Corporation submits tariff filing per 35.13(a)(2)(iii: NMPC 205: Smart Path Connect Cost Recovery and Incentive Rate Treatment to be effective 5/4/2022. Filed Date: 3/4/22. Accession Number: 20220304–5146. Comment Date: 5 p.m. ET 3/25/22. Docket Numbers: ER22–1202–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Amendment: Termination of Noosa Energy Storage E&P Agreement (SA 2100 EP–30) to be effective 5/4/2022. Filed Date: 3/4/22. Accession Number: 20220304–5177. Comment Date: 5 p.m. ET 3/25/22. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH22–7–000. Applicants: CONSTELLATION ENERGY CORPORATION. Description: Constellation Energy Corporation submits FERC–65A Notice of Change in Fact to Waiver Notification of. Filed Date: 3/3/22. Accession Number: 20220303–5225. Comment Date: 5 p.m. ET 3/24/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 4, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–05054 Filed 3–9–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 13725 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER06–1409–007; ER06–1407–007; ER06–1408–007; ER08–579–009; ER08–578–008; ER19– 902–002; ER06–1413–007. Applicants: Noble Clinton Windpark I, LLC, Valcour Wind Energy, LLC, Noble Chateaugay Windpark, LLC, Noble Wethersfield Windpark, LLC, Noble Ellenberg Windpark, LLC, Noble Bliss Windpark, LLC, Noble Altona Windpark, LLC. Description: Notice of Change in Status of Valcour Altona Windpark, LLC, et. al. Filed Date: 3/2/22. Accession Number: 20220302–5300. Comment Date: 5 p.m. ET 3/23/22. Docket Numbers: ER10–1484–024; ER12–2381–010; ER13–1069–013. Applicants: MP2 Energy LLC, MP2 Energy NE LLC, Shell Energy North America (US), L.P. Description: Notice of Change in Status of Shell Energy North America (US), L.P., et al. Filed Date: 3/3/22. Accession Number: 20220303–5230. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–1625–009. Applicants: Tenaska Georgia Partners, L.P. Description: Notice of Change in Status of Tenaska Georgia Partners, L.P. Filed Date: 3/3/22. Accession Number: 20220303–5222. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–1890–020; ER10–1899–017; ER11–2160–020; ER10–1918–024; ER10–1907–023; ER11–2642–021; ER10–1930–015; ER10–1931–016; ER10–1935–017; ER10–1932–017; ER13–2147–004; ER10–1950–024; ER13–2112–015; ER16–90–013; ER17–2340–010; ER15– 2477–013; ER15–2101–011; ER20–2019– 005; ER19–2389–007; ER15–2601–009; ER18–1952–011; ER19–2398–009; ER21–254–005; ER11–3635–017; ER21– 1953–003; ER18–2246–013; ER19–1392– 008; ER20–2064–005; ER12–1228–027; ER10–1962–019; ER21–2225–003; ER20–2690–005; ER16–2275–015; ER16–2276–015; ER18–1771–013; ER12–2225–016; ER14–2138–013; ER12–2226–016; ER21–2117–003; ER16–1354–012; ER10–1966–017; ER18–2003–011; ER14–2707–022; ER14–1630–013; ER16–1872–014; ER15–1375–014; ER18–2182–011; E:\FR\FM\10MRN1.SGM 10MRN1 khammond on DSKJM1Z7X2PROD with NOTICES 13726 Federal Register / Vol. 87, No. 47 / Thursday, March 10, 2022 / Notices ER12–895–025; ER20–1907–004; ER21– 2149–003; ER21–2699–003;ER18–2066– 006; ER20–2695–005; ER18–1535–008; ER14–21–011. Applicants: Mountain View Solar, LLC, Montauk Energy Storage Center, LLC, Mohave County Wind Farm LLC, Minco Wind IV, LLC, Minco Wind Energy III, LLC, Minco Wind Energy II, LLC, Minco Wind I, LLC, Minco Wind Interconnection Services, LLC, Minco IV & V Interconnection, LLC, McCoy Solar, LLC, Marshall Solar, LLC, Mantua Creek Solar, LLC, Mammoth Plains Wind Project, LLC, Lorenzo Wind, LLC, Logan Wind Energy LLC, Live Oak Solar, LLC, Little Blue Wind Project, LLC, Limon Wind, LLC, Limon Wind III, LLC,Limon Wind II, LLC, Langdon Renewables, LLC, Kingman Wind Energy II, LLC, Kingman Wind Energy I, LLC, Jordan Creek Wind Farm LLC, Irish Creek Wind, LLC, High Winds, LLC, High Majestic Wind II, LLC, High Majestic Wind I, LLC, High Lonesome Mesa Wind, LLC, Heartland Divide Wind Project, LLC, Heartland Divide Wind II, LLC, Hatch Solar Energy Center I, LLC, Harmony Florida Solar, LLC, Hancock County Wind, LLC, Gulf Power Company, Green Mountain Storage, LLC, Grazing Yak Solar, LLC, Gray County Wind, LLC, Golden West Power Partners, LLC, Golden Hills Wind, LLC, Golden Hills North Wind, LLC, Golden Hills Interconnection, LLC, Genesis Solar, LLC, Garden Wind, LLC, Frontier Utilities New York LLC, FPL Energy Wyman, LLC, FPL Energy Wyman IV, LLC, FPL Energy Vansycle, L.L.C., FPL Energy Stateline II, Inc., FPL Energy South Dakota Wind, LLC, FPL Energy North Dakota Wind, LLC, FPL Energy North Dakota Wind II, LLC, FPL Energy Montezuma Wind, LLC, FPL Energy Illinois Wind, LLC, FPL Energy Green Power Wind, LLC. Description: Notice of Change in Status of NextEra Companies, et al. (Part 2 of 4). Filed Date: 3/2/22. Accession Number: 20220302–5299. Comment Date: 5 p.m. ET 3/23/22. Docket Numbers: ER10–2042–040; ER10–1942–032; ER17–696–020; ER10– 1941–015; ER19–1127–005; ER10–1938– 035; ER10–1934–034; ER10–1893–034; ER10–3051–039; ER10–2985–038; ER10–3049–039; ER10–1888–015; ER10–1885–015; ER10–1884–015; ER10–1883–015; ER10–1878–015; ER20–1699–003; ER10–1876–016; ER10–1875–015; ER10–1873–015; ER11–4369–019; ER16–2218–020; ER12–1987–013; ER10–1947–016; ER12–2645–008; ER10–1863–010; ER10–1862–034; ER12–2261–014; ER10–1865–015. VerDate Sep<11>2014 16:20 Mar 09, 2022 Jkt 256001 Applicants: South Point Energy Center, LLC, Russell City Energy Company, LLC, Power Contract Financing, L.L.C., Pine Bluff Energy, LLC, Pastoria Energy Facility L.L.C., Otay Mesa Energy Center, LLC, O.L.S. Energy-Agnews, Inc., North American Power Business, LLC, North American Power and Gas, LLC, Metcalf Energy Center, LLC, Los Medanos Energy Center LLC, Los Esteros Critical Energy Facility, LLC, Johanna Energy Center, LLC, Goose Haven Energy Center, LLC, Gilroy Energy Center, LLC, Geysers Power Company, LLC, Delta Energy Center, LLC, Creed Energy Center, LLC, Champion Energy Services, LLC, Champion Energy Marketing LLC, Champion Energy, LLC, CES Marketing X, LLC, CES Marketing IX, LLC, Calpine Power America—CA, LLC, Calpine King City Cogen, LLC, Calpine Gilroy Cogen, L.P., Calpine Energy Solutions, LLC, Calpine Construction Finance Co., L.P., Calpine Energy Services, L.P. Description: Notice of Change in Status of Calpine Energy Services, L.P., et al. Filed Date: 3/3/22. Accession Number: 20220303–5195. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–2401–009; ER20–2746–002. Applicants: Riverstart Solar Park LLC, Blue Canyon Windpower II LLC. Description: Notice of Change in Status of Blue Canyon Windpower II LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5223. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–2460–020; ER10–2461–021; ER12–682–021; ER13– 17–019. Applicants: Niagara Wind Power, LLC, Erie Wind, LLC, Canandaigua Power Partners II, LLC, Canandaigua Power Partners, LLC. Description: Notice of Non-Material Change in Status of Canandaigua Power Partners, LLC, et. al. Filed Date: 3/3/22. Accession Number: 20220303–5226. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–2881–000; ER10–2881–039; ER10–2882–000; ER10–2883–000; ER10–2884–000; ER16–2509–000; ER17–2400–000; ER17–2401–000; ER17–2403–000; ER17–2404–000; ER10–2882–039; ER10–2883–037; ER10–2884–037; ER16–2509–008; ER17–2400–009; ER17–2401–009; ER17–2404–009; ER17–2403–009. Applicants: SP Sandhills Solar, LLC, SP Pawpaw Solar, LLC, SP Decatur Parkway Solar, LLC, SP Butler Solar, LLC, Rutherford Farm, LLC, Georgia PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Power Company, Mississippi Power Company, Southern Power Company, Alabama Power Company. Description: Notice of Change in Status of Alabama Power Company, et al. Filed Date: 3/3/22. Accession Number: 20220303–5217. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER10–3050–009; ER10–3053–009. Applicants: Whitewater Hill Wind Partners, LLC, Cabazon Wind Partners, LLC. Description: Notice of Non-Material Change in Status of Cabazon Wind Partners, LLC, et al. Filed Date: 3/3/22. Accession Number: 20220303–5220. Comment Date: 5 p.m. ET 3/24/22. Docket Numbers: ER11–4462–060; ER18–772–008; ER16–2443–010; ER17– 1774–007; ER10–1970–023; ER17–838– 035; ER11–4677–020; ER10–1972–023; ER10–1973–017; ER10–1951–038; ER16–2241–015; ER21–1880–002; ER10–1975–028; ER12–2444–019; ER10–1974–028; ER20–1988–005; ER20–1985–004; ER20–2648–005; ER21–183–003; ER20–792–005; ER10– 2641–040; ER20–1220–005; ER20–1879– 006; ER16–2506–015; ER20–2012–004; ER16–2297–015; ER14–2710–022; ER15–58–020; ER11–2365–008; ER19– 11–007; ER20–1219–004; ER18–2224– 014; ER12–676–016; ER13–2461–018; ER17–196–008; ER18–807–009; ER21– 2100–003; ER20–1991–005; ER18–1981– 011; ER21–2641–002; ER19–2266–006; ER21–1532–002; ER11–2192–019; ER16–1913–009; ER16–1440–016; ER20–1417–005; ER22–96–002; ER19– 1128–005; ER16–2240–016; ER21–2048– 003. Applicants: Sac County Wind, LLC, Rush Springs Wind Energy, LLC, Rush Springs Energy Storage, LLC, Route 66 Solar Energy Center, LLC, Roundhouse Renewable Energy, LLC, Roswell Solar, LLC, River Bend Solar, LLC, Red Mesa Wind, LLC, Quitman II Solar, LLC, Quitman Solar, LLC, Quinebaug Solar, LLC, Pratt Wind, LLC, Ponderosa Wind, LLC, Point Beach Solar, LLC, Pinal Central Energy Center, LLC, Pima Energy Storage System, LLC, Pheasant Run Wind, LLC, Perrin Ranch Wind, LLC, Pegasus Wind, LLC, Peetz Table Wind, LLC, Peetz Logan Interconnect, LLC, Paradise Solar Urban Renewal, L.L.C., Palo Duro Wind Interconnection Services, LLC, Palo Duro Wind Energy, LLC, Osborn Wind Energy, LLC, Orbit Bloom Energy, LLC, Oliver Wind III, LLC, Oliver Wind I, LLC, Oliver Wind II, LLC, Oleander Power Project, Limited Partnership, Oklahoma Wind, LLC, Nutmeg Solar, LLC, Northern Divide E:\FR\FM\10MRN1.SGM 10MRN1 Federal Register / Vol. 87, No. 47 / Thursday, March 10, 2022 / Notices Wind, LLC, Northern Colorado Wind Energy Center, LLC, Northern Colorado Wind Energy Center II, LLC, Northeast Energy Associates, L.P., North Sky River Energy, LLC, North Jersey Energy Associates, L.P., Niyol Wind, LLC, Ninnescah Wind Energy, LLC, Gexa Energy L.L.C., NextEra Energy Seabrook, LLC, NextEra Energy Point Beach, LLC, NextEra Energy Montezuma II Wind, LLC, NextEra Energy Marketing, LLC, NextEra Energy Duane Arnold, LLC, NextEra Energy Bluff Point, LLC, NextEra Blythe Solar Energy Center, LLC, New Mexico Wind, LLC, NEPM II, LLC. Description: Notice of Change in Status of NextEra Companies, et al. (Part 3 of 4). Filed Date: 3/2/22. Accession Number: 20220302–5301. Comment Date: 5 p.m. ET 3/23/22. khammond on DSKJM1Z7X2PROD with NOTICES Docket Numbers: ER16–1913–010; ER10–1852–059; ER10–1951–039; ER11–4462–061; ER17–838–036. Applicants: NextEra Energy Marketing, LLC, River Bend Solar, LLC, NEPM II, LLC, Gexa Energy L.L.C., Florida Power & Light Company. Description: Notice of Change in Status of Florida Power & Light Company, et al. Filed Date: 3/3/22. Accession Number: 20220303–5228. Comment Date: 5 p.m. ET 3/24/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 4, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–05055 Filed 3–9–22; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:20 Mar 09, 2022 Jkt 256001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–42–000] Northern Natural Gas Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed; Ogden to Ventura ALine Abandonment and Capacity Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts of the Ogden to Ventura A-Line Abandonment and Capacity Replacement Project involving abandonment of pipeline facilities by Northern Natural Gas Company (Northern) in Boone, Hancock, and Webster Counties, Iowa, and construction and operation of facilities in Wright County, Iowa. The Commission will use this environmental document in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on April 6, 2022. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 13727 Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written comments during the preparation of the environmental document. If you submitted comments on this project to the Commission before the opening of this docket on January 21, 2022, you will need to file those comments in Docket No. CP22–42–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. Northern provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ which addresses typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas Questions or Landowner Topics link. Public Participation There are three methods you can use to submit your comments to the Commission. Please carefully follow E:\FR\FM\10MRN1.SGM 10MRN1

Agencies

[Federal Register Volume 87, Number 47 (Thursday, March 10, 2022)]
[Notices]
[Pages 13725-13727]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-05055]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER06-1409-007; ER06-1407-007; ER06-1408-007; ER08-
579-009; ER08-578-008; ER19-902-002; ER06-1413-007.
    Applicants: Noble Clinton Windpark I, LLC, Valcour Wind Energy, 
LLC, Noble Chateaugay Windpark, LLC, Noble Wethersfield Windpark, LLC, 
Noble Ellenberg Windpark, LLC, Noble Bliss Windpark, LLC, Noble Altona 
Windpark, LLC.
    Description: Notice of Change in Status of Valcour Altona Windpark, 
LLC, et. al.
    Filed Date: 3/2/22.
    Accession Number: 20220302-5300.
    Comment Date: 5 p.m. ET 3/23/22.

    Docket Numbers: ER10-1484-024; ER12-2381-010; ER13-1069-013.
    Applicants: MP2 Energy LLC, MP2 Energy NE LLC, Shell Energy North 
America (US), L.P.
    Description: Notice of Change in Status of Shell Energy North 
America (US), L.P., et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5230.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-1625-009.
    Applicants: Tenaska Georgia Partners, L.P.
    Description: Notice of Change in Status of Tenaska Georgia 
Partners, L.P.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5222.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-1890-020; ER10-1899-017; ER11-2160-020; ER10-
1918-024; ER10-1907-023; ER11-2642-021; ER10-1930-015; ER10-1931-016; 
ER10-1935-017; ER10-1932-017; ER13-2147-004; ER10-1950-024; ER13-2112-
015; ER16-90-013; ER17-2340-010; ER15-2477-013; ER15-2101-011; ER20-
2019-005; ER19-2389-007; ER15-2601-009; ER18-1952-011; ER19-2398-009; 
ER21-254-005; ER11-3635-017; ER21-1953-003; ER18-2246-013; ER19-1392-
008; ER20-2064-005; ER12-1228-027; ER10-1962-019; ER21-2225-003; ER20-
2690-005; ER16-2275-015; ER16-2276-015; ER18-1771-013; ER12-2225-016; 
ER14-2138-013; ER12-2226-016; ER21-2117-003; ER16-1354-012; ER10-1966-
017; ER18-2003-011; ER14-2707-022; ER14-1630-013; ER16-1872-014; ER15-
1375-014; ER18-2182-011;

[[Page 13726]]

ER12-895-025; ER20-1907-004; ER21-2149-003; ER21-2699-003;ER18-2066-
006; ER20-2695-005; ER18-1535-008; ER14-21-011.
    Applicants: Mountain View Solar, LLC, Montauk Energy Storage 
Center, LLC, Mohave County Wind Farm LLC, Minco Wind IV, LLC, Minco 
Wind Energy III, LLC, Minco Wind Energy II, LLC, Minco Wind I, LLC, 
Minco Wind Interconnection Services, LLC, Minco IV & V Interconnection, 
LLC, McCoy Solar, LLC, Marshall Solar, LLC, Mantua Creek Solar, LLC, 
Mammoth Plains Wind Project, LLC, Lorenzo Wind, LLC, Logan Wind Energy 
LLC, Live Oak Solar, LLC, Little Blue Wind Project, LLC, Limon Wind, 
LLC, Limon Wind III, LLC,Limon Wind II, LLC, Langdon Renewables, LLC, 
Kingman Wind Energy II, LLC, Kingman Wind Energy I, LLC, Jordan Creek 
Wind Farm LLC, Irish Creek Wind, LLC, High Winds, LLC, High Majestic 
Wind II, LLC, High Majestic Wind I, LLC, High Lonesome Mesa Wind, LLC, 
Heartland Divide Wind Project, LLC, Heartland Divide Wind II, LLC, 
Hatch Solar Energy Center I, LLC, Harmony Florida Solar, LLC, Hancock 
County Wind, LLC, Gulf Power Company, Green Mountain Storage, LLC, 
Grazing Yak Solar, LLC, Gray County Wind, LLC, Golden West Power 
Partners, LLC, Golden Hills Wind, LLC, Golden Hills North Wind, LLC, 
Golden Hills Interconnection, LLC, Genesis Solar, LLC, Garden Wind, 
LLC, Frontier Utilities New York LLC, FPL Energy Wyman, LLC, FPL Energy 
Wyman IV, LLC, FPL Energy Vansycle, L.L.C., FPL Energy Stateline II, 
Inc., FPL Energy South Dakota Wind, LLC, FPL Energy North Dakota Wind, 
LLC, FPL Energy North Dakota Wind II, LLC, FPL Energy Montezuma Wind, 
LLC, FPL Energy Illinois Wind, LLC, FPL Energy Green Power Wind, LLC.
    Description: Notice of Change in Status of NextEra Companies, et 
al. (Part 2 of 4).
    Filed Date: 3/2/22.
    Accession Number: 20220302-5299.
    Comment Date: 5 p.m. ET 3/23/22.

    Docket Numbers: ER10-2042-040; ER10-1942-032; ER17-696-020; ER10-
1941-015; ER19-1127-005; ER10-1938-035; ER10-1934-034; ER10-1893-034; 
ER10-3051-039; ER10-2985-038; ER10-3049-039; ER10-1888-015; ER10-1885-
015; ER10-1884-015; ER10-1883-015; ER10-1878-015; ER20-1699-003; ER10-
1876-016; ER10-1875-015; ER10-1873-015; ER11-4369-019; ER16-2218-020; 
ER12-1987-013; ER10-1947-016; ER12-2645-008; ER10-1863-010; ER10-1862-
034; ER12-2261-014; ER10-1865-015.
    Applicants: South Point Energy Center, LLC, Russell City Energy 
Company, LLC, Power Contract Financing, L.L.C., Pine Bluff Energy, LLC, 
Pastoria Energy Facility L.L.C., Otay Mesa Energy Center, LLC, O.L.S. 
Energy-Agnews, Inc., North American Power Business, LLC, North American 
Power and Gas, LLC, Metcalf Energy Center, LLC, Los Medanos Energy 
Center LLC, Los Esteros Critical Energy Facility, LLC, Johanna Energy 
Center, LLC, Goose Haven Energy Center, LLC, Gilroy Energy Center, LLC, 
Geysers Power Company, LLC, Delta Energy Center, LLC, Creed Energy 
Center, LLC, Champion Energy Services, LLC, Champion Energy Marketing 
LLC, Champion Energy, LLC, CES Marketing X, LLC, CES Marketing IX, LLC, 
Calpine Power America--CA, LLC, Calpine King City Cogen, LLC, Calpine 
Gilroy Cogen, L.P., Calpine Energy Solutions, LLC, Calpine Construction 
Finance Co., L.P., Calpine Energy Services, L.P.
    Description: Notice of Change in Status of Calpine Energy Services, 
L.P., et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5195.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-2401-009; ER20-2746-002.
    Applicants: Riverstart Solar Park LLC, Blue Canyon Windpower II 
LLC.
    Description: Notice of Change in Status of Blue Canyon Windpower II 
LLC, et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5223.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-2460-020; ER10-2461-021; ER12-682-021; ER13-
17-019.
    Applicants: Niagara Wind Power, LLC, Erie Wind, LLC, Canandaigua 
Power Partners II, LLC, Canandaigua Power Partners, LLC.
    Description: Notice of Non-Material Change in Status of Canandaigua 
Power Partners, LLC, et. al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5226.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-2881-000; ER10-2881-039; ER10-2882-000; ER10-
2883-000; ER10-2884-000; ER16-2509-000; ER17-2400-000; ER17-2401-000; 
ER17-2403-000; ER17-2404-000; ER10-2882-039; ER10-2883-037; ER10-2884-
037; ER16-2509-008; ER17-2400-009; ER17-2401-009; ER17-2404-009; ER17-
2403-009.
    Applicants: SP Sandhills Solar, LLC, SP Pawpaw Solar, LLC, SP 
Decatur Parkway Solar, LLC, SP Butler Solar, LLC, Rutherford Farm, LLC, 
Georgia Power Company, Mississippi Power Company, Southern Power 
Company, Alabama Power Company.
    Description: Notice of Change in Status of Alabama Power Company, 
et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5217.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER10-3050-009; ER10-3053-009.
    Applicants: Whitewater Hill Wind Partners, LLC, Cabazon Wind 
Partners, LLC.
    Description: Notice of Non-Material Change in Status of Cabazon 
Wind Partners, LLC, et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5220.
    Comment Date: 5 p.m. ET 3/24/22.

    Docket Numbers: ER11-4462-060; ER18-772-008; ER16-2443-010; ER17-
1774-007; ER10-1970-023; ER17-838-035; ER11-4677-020; ER10-1972-023; 
ER10-1973-017; ER10-1951-038; ER16-2241-015; ER21-1880-002; ER10-1975-
028; ER12-2444-019; ER10-1974-028; ER20-1988-005; ER20-1985-004; ER20-
2648-005; ER21-183-003; ER20-792-005; ER10-2641-040; ER20-1220-005; 
ER20-1879-006; ER16-2506-015; ER20-2012-004; ER16-2297-015; ER14-2710-
022; ER15-58-020; ER11-2365-008; ER19-11-007; ER20-1219-004; ER18-2224-
014; ER12-676-016; ER13-2461-018; ER17-196-008; ER18-807-009; ER21-
2100-003; ER20-1991-005; ER18-1981-011; ER21-2641-002; ER19-2266-006; 
ER21-1532-002; ER11-2192-019; ER16-1913-009; ER16-1440-016; ER20-1417-
005; ER22-96-002; ER19-1128-005; ER16-2240-016; ER21-2048-003.
    Applicants: Sac County Wind, LLC, Rush Springs Wind Energy, LLC, 
Rush Springs Energy Storage, LLC, Route 66 Solar Energy Center, LLC, 
Roundhouse Renewable Energy, LLC, Roswell Solar, LLC, River Bend Solar, 
LLC, Red Mesa Wind, LLC, Quitman II Solar, LLC, Quitman Solar, LLC, 
Quinebaug Solar, LLC, Pratt Wind, LLC, Ponderosa Wind, LLC, Point Beach 
Solar, LLC, Pinal Central Energy Center, LLC, Pima Energy Storage 
System, LLC, Pheasant Run Wind, LLC, Perrin Ranch Wind, LLC, Pegasus 
Wind, LLC, Peetz Table Wind, LLC, Peetz Logan Interconnect, LLC, 
Paradise Solar Urban Renewal, L.L.C., Palo Duro Wind Interconnection 
Services, LLC, Palo Duro Wind Energy, LLC, Osborn Wind Energy, LLC, 
Orbit Bloom Energy, LLC, Oliver Wind III, LLC, Oliver Wind I, LLC, 
Oliver Wind II, LLC, Oleander Power Project, Limited Partnership, 
Oklahoma Wind, LLC, Nutmeg Solar, LLC, Northern Divide

[[Page 13727]]

Wind, LLC, Northern Colorado Wind Energy Center, LLC, Northern Colorado 
Wind Energy Center II, LLC, Northeast Energy Associates, L.P., North 
Sky River Energy, LLC, North Jersey Energy Associates, L.P., Niyol 
Wind, LLC, Ninnescah Wind Energy, LLC, Gexa Energy L.L.C., NextEra 
Energy Seabrook, LLC, NextEra Energy Point Beach, LLC, NextEra Energy 
Montezuma II Wind, LLC, NextEra Energy Marketing, LLC, NextEra Energy 
Duane Arnold, LLC, NextEra Energy Bluff Point, LLC, NextEra Blythe 
Solar Energy Center, LLC, New Mexico Wind, LLC, NEPM II, LLC.
    Description: Notice of Change in Status of NextEra Companies, et 
al. (Part 3 of 4).
    Filed Date: 3/2/22.
    Accession Number: 20220302-5301.
    Comment Date: 5 p.m. ET 3/23/22.

    Docket Numbers: ER16-1913-010; ER10-1852-059; ER10-1951-039; ER11-
4462-061; ER17-838-036.
    Applicants: NextEra Energy Marketing, LLC, River Bend Solar, LLC, 
NEPM II, LLC, Gexa Energy L.L.C., Florida Power & Light Company.
    Description: Notice of Change in Status of Florida Power & Light 
Company, et al.
    Filed Date: 3/3/22.
    Accession Number: 20220303-5228.
    Comment Date: 5 p.m. ET 3/24/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number. Any person desiring to intervene or protest in any 
of the above proceedings must file in accordance with Rules 211 and 214 
of the Commission's Regulations (18 CFR 385.211 and 385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
may be considered, but intervention is necessary to become a party to 
the proceeding. eFiling is encouraged. More detailed information 
relating to filing requirements, interventions, protests, service, and 
qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 
208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: March 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-05055 Filed 3-9-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.