Environmental Impact Statements; Notice of Availability, 12450 [2022-04605]

Download as PDF 12450 Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices CP21–197). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: February 25, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–04535 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY Dated: February 28, 2022. Cindy S. Barger, Director, NEPA Compliance Division, Office of Federal Activities. [FRL OP–OFA–006] Environmental Impact Statements; Notice of Availability [FR Doc. 2022–04605 Filed 3–3–22; 8:45 am] Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed February 18, 2022 10 a.m. EST Through February 28, 2022 10 a.m. EST Pursuant to 40 CFR 1506.9. lotter on DSK11XQN23PROD with NOTICES1 Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20220021, Draft, USFS, AK, Mendenhall Glacier Visitor Facility Improvements, Comment Period Ends: 04/18/2022, Contact: Monique Nelson 907–209–4090. EIS No. 20220022, Draft, USFS, OR, Ellis Integrated Vegetation Project, VerDate Sep<11>2014 17:05 Mar 03, 2022 Jkt 256001 Comment Period Ends: 04/18/2022, Contact: Leslie Taylor 541–427–5324. EIS No. 20220023, Final, USAF, TX, T–7A Recapitalization at Joint Base San Antonio, Texas, Review Period Ends: 04/04/2022, Contact: Nolan Swick 210–925–3392. EIS No. 20220024, Draft, BIA, NV, Chuckwalla Solar Projects, Comment Period Ends: 04/18/2022, Contact: Chip Lewis 602–379–6750. EIS No. 20220025, Draft, FERC, OR, Lower Klamath Project, Comment Period Ends: 04/18/2022, Contact: Office of External Affairs 866–208– 3372. EIS No. 20220026, Final, FERC, UT, Delta Lateral Project, Review Period Ends: 04/04/2022, Contact: Office of External Affairs 866–208–3372. EIS No. 20220027, Draft, RUS, WI, Badger State Solar Project, Comment Period Ends: 04/18/2022, Contact: Peter Steinour 202–961–6140. EIS No. 20220028, Final Supplement, FHWA, NH, Newington-Dover, General Sullivan Bridge Spaulding Turnpike Improvements Project, Contact: Jamison Sikora 603–410– 4870. Under 23 U.S.C. 139(n)(2), FHWA has issued a single document that consists of a final supplemental environmental impact statement and supplemental record of decision. Therefore, the 30-day wait/review period under NEPA does not apply to this action. BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–XXXX, OMB 3060–0207, OMB 3060–0856; FR ID 74140] Information Collections Being Submitted for Review and Approval to Office of Management and Budget Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, as required by the Paperwork Reduction Act (PRA) of 1995, the Federal Communications Commission (FCC or the Commission) invites the general public and other Federal Agencies to take this opportunity to comment on the following information collection. SUMMARY: PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Pursuant to the Small Business Paperwork Relief Act of 2002, the FCC seeks specific comment on how it might ‘‘further reduce the information collection burden for small business concerns with fewer than 25 employees.’’ The Commission may not conduct or sponsor a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid OMB control number. DATES: Written comments and recommendations for the proposed information collection should be submitted on or before April 4, 2022. ADDRESSES: Comments should be sent to www.reginfo.gov/public/do/PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. Your comment must be submitted into www.reginfo.gov per the above instructions for it to be considered. In addition to submitting in www.reginfo.gov also send a copy of your comment on the proposed information collection to Nicole Ongele, FCC, via email to PRA@fcc.gov and to Nicole.Ongele@fcc.gov. Include in the comments the OMB control number as shown in the SUPPLEMENTARY INFORMATION below. FOR FURTHER INFORMATION CONTACT: For additional information or copies of the information collection, contact Nicole Ongele at (202) 418–2991. To view a copy of this information collection request (ICR) submitted to OMB: (1) Go to the web page https://www.reginfo.gov/ public/do/PRAMain, (2) look for the section of the web page called ‘‘Currently Under Review,’’ (3) click on the downward-pointing arrow in the ‘‘Select Agency’’ box below the ‘‘Currently Under Review’’ heading, (4) select ‘‘Federal Communications Commission’’ from the list of agencies presented in the ‘‘Select Agency’’ box, (5) click the ‘‘Submit’’ button to the right of the ‘‘Select Agency’’ box, (6) when the list of FCC ICRs currently under review appears, look for the Title of this ICR and then click on the ICR Reference Number. A copy of the FCC submission to OMB will be displayed. SUPPLEMENTARY INFORMATION: As part of its continuing effort to reduce paperwork burdens, as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501–3520), the FCC invited the general public and other Federal Agencies to take this opportunity to E:\FR\FM\04MRN1.SGM 04MRN1

Agencies

[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Page 12450]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04605]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL OP-OFA-006]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EIS)
Filed February 18, 2022 10 a.m. EST Through February 28, 2022 10 a.m. 
EST
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20220021, Draft, USFS, AK, Mendenhall Glacier Visitor Facility 
Improvements, Comment Period Ends: 04/18/2022, Contact: Monique Nelson 
907-209-4090.
EIS No. 20220022, Draft, USFS, OR, Ellis Integrated Vegetation Project, 
Comment Period Ends: 04/18/2022, Contact: Leslie Taylor 541-427-5324.
EIS No. 20220023, Final, USAF, TX, T-7A Recapitalization at Joint Base 
San Antonio, Texas, Review Period Ends: 04/04/2022, Contact: Nolan 
Swick 210-925-3392.
EIS No. 20220024, Draft, BIA, NV, Chuckwalla Solar Projects, Comment 
Period Ends: 04/18/2022, Contact: Chip Lewis 602-379-6750.
EIS No. 20220025, Draft, FERC, OR, Lower Klamath Project, Comment 
Period Ends: 04/18/2022, Contact: Office of External Affairs 866-208-
3372.
EIS No. 20220026, Final, FERC, UT, Delta Lateral Project, Review Period 
Ends: 04/04/2022, Contact: Office of External Affairs 866-208-3372.
EIS No. 20220027, Draft, RUS, WI, Badger State Solar Project, Comment 
Period Ends: 04/18/2022, Contact: Peter Steinour 202-961-6140.
EIS No. 20220028, Final Supplement, FHWA, NH, Newington-Dover, General 
Sullivan Bridge Spaulding Turnpike Improvements Project, Contact: 
Jamison Sikora 603-410-4870.

    Under 23 U.S.C. 139(n)(2), FHWA has issued a single document that 
consists of a final supplemental environmental impact statement and 
supplemental record of decision. Therefore, the 30-day wait/review 
period under NEPA does not apply to this action.

    Dated: February 28, 2022.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2022-04605 Filed 3-3-22; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.