Environmental Impact Statements; Notice of Availability, 12450 [2022-04605]
Download as PDF
12450
Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices
CP21–197). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04535 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
Dated: February 28, 2022.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FRL OP–OFA–006]
Environmental Impact Statements;
Notice of Availability
[FR Doc. 2022–04605 Filed 3–3–22; 8:45 am]
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed February 18, 2022 10 a.m. EST
Through February 28, 2022 10 a.m.
EST
Pursuant to 40 CFR 1506.9.
lotter on DSK11XQN23PROD with NOTICES1
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20220021, Draft, USFS, AK,
Mendenhall Glacier Visitor Facility
Improvements, Comment Period
Ends: 04/18/2022, Contact: Monique
Nelson 907–209–4090.
EIS No. 20220022, Draft, USFS, OR,
Ellis Integrated Vegetation Project,
VerDate Sep<11>2014
17:05 Mar 03, 2022
Jkt 256001
Comment Period Ends: 04/18/2022,
Contact: Leslie Taylor 541–427–5324.
EIS No. 20220023, Final, USAF, TX,
T–7A Recapitalization at Joint Base
San Antonio, Texas, Review Period
Ends: 04/04/2022, Contact: Nolan
Swick 210–925–3392.
EIS No. 20220024, Draft, BIA, NV,
Chuckwalla Solar Projects, Comment
Period Ends: 04/18/2022, Contact:
Chip Lewis 602–379–6750.
EIS No. 20220025, Draft, FERC, OR,
Lower Klamath Project, Comment
Period Ends: 04/18/2022, Contact:
Office of External Affairs 866–208–
3372.
EIS No. 20220026, Final, FERC, UT,
Delta Lateral Project, Review Period
Ends: 04/04/2022, Contact: Office of
External Affairs 866–208–3372.
EIS No. 20220027, Draft, RUS, WI,
Badger State Solar Project, Comment
Period Ends: 04/18/2022, Contact:
Peter Steinour 202–961–6140.
EIS No. 20220028, Final Supplement,
FHWA, NH, Newington-Dover,
General Sullivan Bridge Spaulding
Turnpike Improvements Project,
Contact: Jamison Sikora 603–410–
4870.
Under 23 U.S.C. 139(n)(2), FHWA has
issued a single document that consists
of a final supplemental environmental
impact statement and supplemental
record of decision. Therefore, the 30-day
wait/review period under NEPA does
not apply to this action.
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–XXXX, OMB 3060–0207, OMB
3060–0856; FR ID 74140]
Information Collections Being
Submitted for Review and Approval to
Office of Management and Budget
Federal Communications
Commission.
ACTION: Notice and request for
comments.
AGENCY:
As part of its continuing effort
to reduce paperwork burdens, as
required by the Paperwork Reduction
Act (PRA) of 1995, the Federal
Communications Commission (FCC or
the Commission) invites the general
public and other Federal Agencies to
take this opportunity to comment on the
following information collection.
SUMMARY:
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Pursuant to the Small Business
Paperwork Relief Act of 2002, the FCC
seeks specific comment on how it might
‘‘further reduce the information
collection burden for small business
concerns with fewer than 25
employees.’’ The Commission may not
conduct or sponsor a collection of
information unless it displays a
currently valid Office of Management
and Budget (OMB) control number. No
person shall be subject to any penalty
for failing to comply with a collection
of information subject to the PRA that
does not display a valid OMB control
number.
DATES: Written comments and
recommendations for the proposed
information collection should be
submitted on or before April 4, 2022.
ADDRESSES: Comments should be sent to
www.reginfo.gov/public/do/PRAMain.
Find this particular information
collection by selecting ‘‘Currently under
30-day Review—Open for Public
Comments’’ or by using the search
function. Your comment must be
submitted into www.reginfo.gov per the
above instructions for it to be
considered. In addition to submitting in
www.reginfo.gov also send a copy of
your comment on the proposed
information collection to Nicole Ongele,
FCC, via email to PRA@fcc.gov and to
Nicole.Ongele@fcc.gov. Include in the
comments the OMB control number as
shown in the SUPPLEMENTARY
INFORMATION below.
FOR FURTHER INFORMATION CONTACT: For
additional information or copies of the
information collection, contact Nicole
Ongele at (202) 418–2991. To view a
copy of this information collection
request (ICR) submitted to OMB: (1) Go
to the web page https://www.reginfo.gov/
public/do/PRAMain, (2) look for the
section of the web page called
‘‘Currently Under Review,’’ (3) click on
the downward-pointing arrow in the
‘‘Select Agency’’ box below the
‘‘Currently Under Review’’ heading, (4)
select ‘‘Federal Communications
Commission’’ from the list of agencies
presented in the ‘‘Select Agency’’ box,
(5) click the ‘‘Submit’’ button to the
right of the ‘‘Select Agency’’ box, (6)
when the list of FCC ICRs currently
under review appears, look for the Title
of this ICR and then click on the ICR
Reference Number. A copy of the FCC
submission to OMB will be displayed.
SUPPLEMENTARY INFORMATION: As part of
its continuing effort to reduce
paperwork burdens, as required by the
Paperwork Reduction Act (PRA) of 1995
(44 U.S.C. 3501–3520), the FCC invited
the general public and other Federal
Agencies to take this opportunity to
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Page 12450]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04605]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL OP-OFA-006]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EIS)
Filed February 18, 2022 10 a.m. EST Through February 28, 2022 10 a.m.
EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20220021, Draft, USFS, AK, Mendenhall Glacier Visitor Facility
Improvements, Comment Period Ends: 04/18/2022, Contact: Monique Nelson
907-209-4090.
EIS No. 20220022, Draft, USFS, OR, Ellis Integrated Vegetation Project,
Comment Period Ends: 04/18/2022, Contact: Leslie Taylor 541-427-5324.
EIS No. 20220023, Final, USAF, TX, T-7A Recapitalization at Joint Base
San Antonio, Texas, Review Period Ends: 04/04/2022, Contact: Nolan
Swick 210-925-3392.
EIS No. 20220024, Draft, BIA, NV, Chuckwalla Solar Projects, Comment
Period Ends: 04/18/2022, Contact: Chip Lewis 602-379-6750.
EIS No. 20220025, Draft, FERC, OR, Lower Klamath Project, Comment
Period Ends: 04/18/2022, Contact: Office of External Affairs 866-208-
3372.
EIS No. 20220026, Final, FERC, UT, Delta Lateral Project, Review Period
Ends: 04/04/2022, Contact: Office of External Affairs 866-208-3372.
EIS No. 20220027, Draft, RUS, WI, Badger State Solar Project, Comment
Period Ends: 04/18/2022, Contact: Peter Steinour 202-961-6140.
EIS No. 20220028, Final Supplement, FHWA, NH, Newington-Dover, General
Sullivan Bridge Spaulding Turnpike Improvements Project, Contact:
Jamison Sikora 603-410-4870.
Under 23 U.S.C. 139(n)(2), FHWA has issued a single document that
consists of a final supplemental environmental impact statement and
supplemental record of decision. Therefore, the 30-day wait/review
period under NEPA does not apply to this action.
Dated: February 28, 2022.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2022-04605 Filed 3-3-22; 8:45 am]
BILLING CODE 6560-50-P