Combined Notice of Filings, 12446-12447 [2022-04518]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 12446 Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for surrender of license and removal of project works for the Lower Klamath Hydroelectric Project No. 14803 and has prepared a draft environmental impact statement (EIS).1 The project is located on the Klamath River in Klamath County, Oregon, and in Siskiyou County, California. The project occupies approximately 400 acres of federal lands. These federal lands are administered by the U.S. Department of the Interior, Bureau of Land Management (BLM). The draft EIS contains staff evaluations of the applicant’s proposal and the alternatives for surrender of the Lower Klamath Project. The draft EIS documents the views of governmental agencies, non-governmental organizations, affected Indian Tribes, the public, the applicants, and Commission staff. In this notice, we acknowledge the number of pages in this draft EIS exceeds the final EIS page limits set forth in CEQ’s Final Rule for proposals of unusual scope or complexity. Noting the scope and complexity of this proposal, the Director, Office of Energy Projects, as our senior agency official, has authorized this page limit exceedance for both the draft and final EIS. The Commission provides all interested persons with an opportunity to view and/or print the draft EIS via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), in a Presidential proclamation issued on March 13, 2020. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. 1 On July 16, 2020, the Council on Environmental Quality (CEQ) issued a final rule, Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act (Final Rule, 85 FR 43,304), which was effective as of September 14, 2020. Accordingly, this EIS was prepared pursuant to the Final Rule. VerDate Sep<11>2014 17:05 Mar 03, 2022 Jkt 256001 For assistance, contact FERC Online Support. All comments must be filed by April 18, 2022. Due to concerns with large gatherings related to COVID–19, we do not intend to conduct public meetings for the purpose of receiving comments on the draft EIS. Instead, we are soliciting only written comments. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/ eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline. ferc.gov/QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket numbers P– 14803–001 and P–2082–063. Anyone may intervene in this proceeding based on this draft EIS (18 CFR 380.10). You must file your request to intervene as specified above.2 You do not need intervenor status to have your comments considered. For further information, please contact Diana Shannon at (202) 502– 6136 or at diana.shannon@ferc.gov. Dated: February 25, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–04537 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP22–584–000. 2 Interventions may also be filed electronically via the internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: New Service Agreement—Seminole to be effective 4/1/2022. Filed Date: 2/24/22. Accession Number: 20220224–5080. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–585–000. Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: Update Non-Conforming List—Seminole to be effective 4/1/2022. Filed Date: 2/24/22. Accession Number: 20220224–5082. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–586–000. Applicants: Empire Pipeline, Inc. Description: Compliance filing: Refund Report Jan–Dec 2021 (Per Settlement in RP18–940) to be effective N/A. Filed Date: 2/24/22. Accession Number: 20220224–5123. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–587–000. Applicants: Tres Palacios Gas Storage LLC. Description: Compliance filing: Tres Palacios Gas Storage Docket No. CP12– 36 Updated Market Power Analysis to be effective N/A. Filed Date: 2/24/22. Accession Number: 20220224–5156. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–588–000. Applicants: ANR Pipeline Company. Description: § 4(d) Rate Filing: ANR Fuel Filing 2022 to be effective 4/1/ 2022. Filed Date: 2/24/22. Accession Number: 20220224–5160. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–589–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Annual LMCRA—Spring 2022 to be effective 4/ 1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5019. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–590–000. Applicants: KPC Pipeline, LLC. Description: § 4(d) Rate Filing: Fuel Reimbursement Adjustment to be effective 4/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5021. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–591–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 releases eff 3–1–2022) to be effective 3/ 1/2022. E:\FR\FM\04MRN1.SGM 04MRN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices Filed Date: 2/25/22. Accession Number: 20220225–5022. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–592–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: EPCR Semi-Annual Adjustment—Spring 2022 to be effective 4/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5023. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–593–000. Applicants: Millennium Pipeline Company, LLC. Description: Compliance filing: Annual Report on Operational Transactions 2022 to be effective N/A. Filed Date: 2/25/22. Accession Number: 20220225–5027. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–594–000. Applicants: Midwestern Gas Transmission Company. Description: § 4(d) Rate Filing: Annual Fuel Retention Percentage Adjustment— 2022 Rate to be effective 4/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5028. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–595–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: SemiAnnual Fuel and Loss Retention Adjustment—Spring 2022 to be effective 4/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5031. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–596–000. Applicants: MoGas Pipeline LLC. Description: Compliance filing: MoGas NAESB Compliance Filing to be effective 6/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5032. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–597–000. Applicants: Northwest Pipeline LLC. Description: § 4(d) Rate Filing: 2022 Summer Fuel Filing to be effective 4/1/ 2022. Filed Date: 2/25/22. Accession Number: 20220225–5048. Comment Date: 5 p.m. ET 3/9/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// VerDate Sep<11>2014 17:05 Mar 03, 2022 Jkt 256001 elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 25, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–04518 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13806–012] 5440 Hydor, Inc.; Ampersand Brooklyn Dam Hydro, LLC; Notice of Transfer of Exemption 1. On January 24, 2022, 5440 Hydro, Inc., exemptee for the 600-Kilowatt Brooklyn Dam Hydroelectric Project No. 13806, filed a letter notifying the Commission that the project was transferred from 5440 Hydro, Inc. to Ampersand Brooklyn Dam Hydro, LLC. The exemption from licensing was originally issued on August 14, 2015.1 The project is located on the Upper Ammonoosuc River, Coos County, New Hampshire. The transfer of an exemption does not require Commission approval. 2. Ampersand Brooklyn Dam Hydro, LLC is now the exemptee of the Brooklyn Dam Hydroelectric Project No. 13806. All correspondence must be forwarded to: Mr. Amit Pinjani, Asset Manager, Ampersand Brooklyn Dam Hydro, LLC, 717 Atlantic Avenue, Suite 1A, Boston, MA 02111, Email: amit@ ampersandenergy.com. Dated: February 25, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–04538 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P 1 5440 PO 00000 Hydro, Inc., 152 FERC ¶ 62,113 (2015). Frm 00025 Fmt 4703 Sfmt 4703 12447 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6440–010] Lakeport Hydroelectric One, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 6440–010. c. Date Filed: August 30, 2021. d. Applicant: Lakeport Hydroelectric One, LLC (Lakeport). e. Name of Project: Lakeport Hydroelectric Project (project). f. Location: On the Winnipesaukee River in Belknap County, New Hampshire. The project does not occupy any federal land. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). h. Applicant Contact: Ms. Jody Smet, Lakeport Hydroelectric One, LLC c/o Eagle Creek Renewable Energy, LLC, 7315 Wisconsin Avenue, Suite 1100W, Bethesda, MD 20814; Phone at (240) 482–2700, or email at jody.smet@ eaglecreekre.com.. i. FERC Contact: Erin Kimsey at (202) 502–8621, or erin.kimsey@ferc.gov. j. Deadline for Filing Scoping Comments: March 26, 2022. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://ferconline. ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. All filings must clearly identify the project name and docket number on the first page: Lakeport Project (P–6440– 010). E:\FR\FM\04MRN1.SGM 04MRN1

Agencies

[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Pages 12446-12447]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04518]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP22-584-000.
    Applicants: Florida Gas Transmission Company, LLC.
    Description: Sec.  4(d) Rate Filing: New Service Agreement--
Seminole to be effective 4/1/2022.
    Filed Date: 2/24/22.
    Accession Number: 20220224-5080.
    Comment Date: 5 p.m. ET 3/8/22.

    Docket Numbers: RP22-585-000.
    Applicants: Florida Gas Transmission Company, LLC.
    Description: Sec.  4(d) Rate Filing: Update Non-Conforming List--
Seminole to be effective 4/1/2022.
    Filed Date: 2/24/22.
    Accession Number: 20220224-5082.
    Comment Date: 5 p.m. ET 3/8/22.

    Docket Numbers: RP22-586-000.
    Applicants: Empire Pipeline, Inc.
    Description: Compliance filing: Refund Report Jan-Dec 2021 (Per 
Settlement in RP18-940) to be effective N/A.
    Filed Date: 2/24/22.
    Accession Number: 20220224-5123.
    Comment Date: 5 p.m. ET 3/8/22.

    Docket Numbers: RP22-587-000.
    Applicants: Tres Palacios Gas Storage LLC.
    Description: Compliance filing: Tres Palacios Gas Storage Docket 
No. CP12-36 Updated Market Power Analysis to be effective N/A.
    Filed Date: 2/24/22.
    Accession Number: 20220224-5156.
    Comment Date: 5 p.m. ET 3/8/22.

    Docket Numbers: RP22-588-000.
    Applicants: ANR Pipeline Company.
    Description: Sec.  4(d) Rate Filing: ANR Fuel Filing 2022 to be 
effective 4/1/2022.
    Filed Date: 2/24/22.
    Accession Number: 20220224-5160.
    Comment Date: 5 p.m. ET 3/8/22.

    Docket Numbers: RP22-589-000.
    Applicants: Viking Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: Annual LMCRA--Spring 2022 to 
be effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5019.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-590-000.
    Applicants: KPC Pipeline, LLC.
    Description: Sec.  4(d) Rate Filing: Fuel Reimbursement Adjustment 
to be effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5021.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-591-000.
    Applicants: Gulf South Pipeline Company, LLC.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts 
(Atlanta Gas 8438 releases eff 3-1-2022) to be effective 3/1/2022.

[[Page 12447]]

    Filed Date: 2/25/22.
    Accession Number: 20220225-5022.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-592-000.
    Applicants: Guardian Pipeline, L.L.C.
    Description: Sec.  4(d) Rate Filing: EPCR Semi-Annual Adjustment--
Spring 2022 to be effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5023.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-593-000.
    Applicants: Millennium Pipeline Company, LLC.
    Description: Compliance filing: Annual Report on Operational 
Transactions 2022 to be effective N/A.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5027.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-594-000.
    Applicants: Midwestern Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: Annual Fuel Retention 
Percentage Adjustment--2022 Rate to be effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5028.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-595-000.
    Applicants: Viking Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: Semi-Annual Fuel and Loss 
Retention Adjustment--Spring 2022 to be effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5031.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-596-000.
    Applicants: MoGas Pipeline LLC.
    Description: Compliance filing: MoGas NAESB Compliance Filing to be 
effective 6/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5032.
    Comment Date: 5 p.m. ET 3/9/22.

    Docket Numbers: RP22-597-000.
    Applicants: Northwest Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: 2022 Summer Fuel Filing to be 
effective 4/1/2022.
    Filed Date: 2/25/22.
    Accession Number: 20220225-5048.
    Comment Date: 5 p.m. ET 3/9/22.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 25, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-04518 Filed 3-3-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.