Combined Notice of Filings, 12446-12447 [2022-04518]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
12446
Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for surrender of license and
removal of project works for the Lower
Klamath Hydroelectric Project No.
14803 and has prepared a draft
environmental impact statement (EIS).1
The project is located on the Klamath
River in Klamath County, Oregon, and
in Siskiyou County, California. The
project occupies approximately 400
acres of federal lands. These federal
lands are administered by the U.S.
Department of the Interior, Bureau of
Land Management (BLM).
The draft EIS contains staff
evaluations of the applicant’s proposal
and the alternatives for surrender of the
Lower Klamath Project. The draft EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian Tribes,
the public, the applicants, and
Commission staff.
In this notice, we acknowledge the
number of pages in this draft EIS
exceeds the final EIS page limits set
forth in CEQ’s Final Rule for proposals
of unusual scope or complexity. Noting
the scope and complexity of this
proposal, the Director, Office of Energy
Projects, as our senior agency official,
has authorized this page limit
exceedance for both the draft and final
EIS.
The Commission provides all
interested persons with an opportunity
to view and/or print the draft EIS via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
in a Presidential proclamation issued on
March 13, 2020. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
1 On July 16, 2020, the Council on Environmental
Quality (CEQ) issued a final rule, Update to the
Regulations Implementing the Procedural
Provisions of the National Environmental Policy Act
(Final Rule, 85 FR 43,304), which was effective as
of September 14, 2020. Accordingly, this EIS was
prepared pursuant to the Final Rule.
VerDate Sep<11>2014
17:05 Mar 03, 2022
Jkt 256001
For assistance, contact FERC Online
Support.
All comments must be filed by April
18, 2022.
Due to concerns with large gatherings
related to COVID–19, we do not intend
to conduct public meetings for the
purpose of receiving comments on the
draft EIS. Instead, we are soliciting only
written comments.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
eFiling.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://ferconline.
ferc.gov/QuickComment.aspx. You must
include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include the docket numbers P–
14803–001 and P–2082–063.
Anyone may intervene in this
proceeding based on this draft EIS (18
CFR 380.10). You must file your request
to intervene as specified above.2 You do
not need intervenor status to have your
comments considered.
For further information, please
contact Diana Shannon at (202) 502–
6136 or at diana.shannon@ferc.gov.
Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04537 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–584–000.
2 Interventions may also be filed electronically via
the internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
Service Agreement—Seminole to be
effective 4/1/2022.
Filed Date: 2/24/22.
Accession Number: 20220224–5080.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22–585–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: Update
Non-Conforming List—Seminole to be
effective 4/1/2022.
Filed Date: 2/24/22.
Accession Number: 20220224–5082.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22–586–000.
Applicants: Empire Pipeline, Inc.
Description: Compliance filing:
Refund Report Jan–Dec 2021 (Per
Settlement in RP18–940) to be effective
N/A.
Filed Date: 2/24/22.
Accession Number: 20220224–5123.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22–587–000.
Applicants: Tres Palacios Gas Storage
LLC.
Description: Compliance filing: Tres
Palacios Gas Storage Docket No. CP12–
36 Updated Market Power Analysis to
be effective N/A.
Filed Date: 2/24/22.
Accession Number: 20220224–5156.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22–588–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: ANR
Fuel Filing 2022 to be effective 4/1/
2022.
Filed Date: 2/24/22.
Accession Number: 20220224–5160.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22–589–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Annual
LMCRA—Spring 2022 to be effective 4/
1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5019.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–590–000.
Applicants: KPC Pipeline, LLC.
Description: § 4(d) Rate Filing: Fuel
Reimbursement Adjustment to be
effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5021.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–591–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Atlanta Gas 8438
releases eff 3–1–2022) to be effective 3/
1/2022.
E:\FR\FM\04MRN1.SGM
04MRN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices
Filed Date: 2/25/22.
Accession Number: 20220225–5022.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–592–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: EPCR
Semi-Annual Adjustment—Spring 2022
to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5023.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–593–000.
Applicants: Millennium Pipeline
Company, LLC.
Description: Compliance filing:
Annual Report on Operational
Transactions 2022 to be effective N/A.
Filed Date: 2/25/22.
Accession Number: 20220225–5027.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–594–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Annual
Fuel Retention Percentage Adjustment—
2022 Rate to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5028.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–595–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: SemiAnnual Fuel and Loss Retention
Adjustment—Spring 2022 to be effective
4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5031.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–596–000.
Applicants: MoGas Pipeline LLC.
Description: Compliance filing:
MoGas NAESB Compliance Filing to be
effective 6/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5032.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–597–000.
Applicants: Northwest Pipeline LLC.
Description: § 4(d) Rate Filing: 2022
Summer Fuel Filing to be effective 4/1/
2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5048.
Comment Date: 5 p.m. ET 3/9/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
VerDate Sep<11>2014
17:05 Mar 03, 2022
Jkt 256001
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–04518 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13806–012]
5440 Hydor, Inc.; Ampersand Brooklyn
Dam Hydro, LLC; Notice of Transfer of
Exemption
1. On January 24, 2022, 5440 Hydro,
Inc., exemptee for the 600-Kilowatt
Brooklyn Dam Hydroelectric Project No.
13806, filed a letter notifying the
Commission that the project was
transferred from 5440 Hydro, Inc. to
Ampersand Brooklyn Dam Hydro, LLC.
The exemption from licensing was
originally issued on August 14, 2015.1
The project is located on the Upper
Ammonoosuc River, Coos County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. Ampersand Brooklyn Dam Hydro,
LLC is now the exemptee of the
Brooklyn Dam Hydroelectric Project No.
13806. All correspondence must be
forwarded to: Mr. Amit Pinjani, Asset
Manager, Ampersand Brooklyn Dam
Hydro, LLC, 717 Atlantic Avenue, Suite
1A, Boston, MA 02111, Email: amit@
ampersandenergy.com.
Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04538 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
1 5440
PO 00000
Hydro, Inc., 152 FERC ¶ 62,113 (2015).
Frm 00025
Fmt 4703
Sfmt 4703
12447
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6440–010]
Lakeport Hydroelectric One, LLC;
Notice Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 6440–010.
c. Date Filed: August 30, 2021.
d. Applicant: Lakeport Hydroelectric
One, LLC (Lakeport).
e. Name of Project: Lakeport
Hydroelectric Project (project).
f. Location: On the Winnipesaukee
River in Belknap County, New
Hampshire. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Ms. Jody Smet,
Lakeport Hydroelectric One, LLC c/o
Eagle Creek Renewable Energy, LLC,
7315 Wisconsin Avenue, Suite 1100W,
Bethesda, MD 20814; Phone at (240)
482–2700, or email at jody.smet@
eaglecreekre.com..
i. FERC Contact: Erin Kimsey at (202)
502–8621, or erin.kimsey@ferc.gov.
j. Deadline for Filing Scoping
Comments: March 26, 2022.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://ferconline.
ferc.gov/FERCOnline.aspx. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
All filings must clearly identify the
project name and docket number on the
first page: Lakeport Project (P–6440–
010).
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Pages 12446-12447]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04518]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22-584-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: New Service Agreement--
Seminole to be effective 4/1/2022.
Filed Date: 2/24/22.
Accession Number: 20220224-5080.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22-585-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: Update Non-Conforming List--
Seminole to be effective 4/1/2022.
Filed Date: 2/24/22.
Accession Number: 20220224-5082.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22-586-000.
Applicants: Empire Pipeline, Inc.
Description: Compliance filing: Refund Report Jan-Dec 2021 (Per
Settlement in RP18-940) to be effective N/A.
Filed Date: 2/24/22.
Accession Number: 20220224-5123.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22-587-000.
Applicants: Tres Palacios Gas Storage LLC.
Description: Compliance filing: Tres Palacios Gas Storage Docket
No. CP12-36 Updated Market Power Analysis to be effective N/A.
Filed Date: 2/24/22.
Accession Number: 20220224-5156.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22-588-000.
Applicants: ANR Pipeline Company.
Description: Sec. 4(d) Rate Filing: ANR Fuel Filing 2022 to be
effective 4/1/2022.
Filed Date: 2/24/22.
Accession Number: 20220224-5160.
Comment Date: 5 p.m. ET 3/8/22.
Docket Numbers: RP22-589-000.
Applicants: Viking Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Annual LMCRA--Spring 2022 to
be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5019.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-590-000.
Applicants: KPC Pipeline, LLC.
Description: Sec. 4(d) Rate Filing: Fuel Reimbursement Adjustment
to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5021.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-591-000.
Applicants: Gulf South Pipeline Company, LLC.
Description: Sec. 4(d) Rate Filing: Cap Rel Neg Rate Agmts
(Atlanta Gas 8438 releases eff 3-1-2022) to be effective 3/1/2022.
[[Page 12447]]
Filed Date: 2/25/22.
Accession Number: 20220225-5022.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-592-000.
Applicants: Guardian Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: EPCR Semi-Annual Adjustment--
Spring 2022 to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5023.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-593-000.
Applicants: Millennium Pipeline Company, LLC.
Description: Compliance filing: Annual Report on Operational
Transactions 2022 to be effective N/A.
Filed Date: 2/25/22.
Accession Number: 20220225-5027.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-594-000.
Applicants: Midwestern Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Annual Fuel Retention
Percentage Adjustment--2022 Rate to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5028.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-595-000.
Applicants: Viking Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Semi-Annual Fuel and Loss
Retention Adjustment--Spring 2022 to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5031.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-596-000.
Applicants: MoGas Pipeline LLC.
Description: Compliance filing: MoGas NAESB Compliance Filing to be
effective 6/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5032.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22-597-000.
Applicants: Northwest Pipeline LLC.
Description: Sec. 4(d) Rate Filing: 2022 Summer Fuel Filing to be
effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225-5048.
Comment Date: 5 p.m. ET 3/9/22.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 25, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-04518 Filed 3-3-22; 8:45 am]
BILLING CODE 6717-01-P