Combined Notice of Filings #1, 10779-10780 [2022-04047]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 38 / Friday, February 25, 2022 / Notices
information collection request when
requesting documents or submitting
comments. Please note that comments
submitted by fax or email and those
submitted after the comment period will
not be accepted. Written requests for
information or comments submitted by
postal mail or delivery should be
addressed to the PRA Coordinator of the
Strategic Collections and Clearance
Governance and Strategy Division, U.S.
Department of Education, 400 Maryland
Ave. SW, LBJ, Room 6W208D,
Washington, DC 20202–8240.
FOR FURTHER INFORMATION CONTACT: For
specific questions related to collection
activities, please contact Corinne Sauri,
(202) 245–6412.
SUPPLEMENTARY INFORMATION: The
Department of Education (ED), in
accordance with the Paperwork
Reduction Act of 1995 (PRA) (44 U.S.C.
3506(c)(2)(A)), provides the general
public and Federal agencies with an
opportunity to comment on proposed,
revised, and continuing collections of
information. This helps the Department
assess the impact of its information
collection requirements and minimize
the public’s reporting burden. It also
helps the public understand the
Department’s information collection
requirements and provide the requested
data in the desired format. ED is
soliciting comments on the proposed
information collection request (ICR) that
is described below. The Department of
Education is especially interested in
public comment addressing the
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Carl D. Perkins
Career and Technical Education Act
State Plan.
OMB Control Number: 1830–0029.
Type of Review: Revision of a
currently approved collection.
Respondents/Affected Public: State,
Local, and Tribal Governments.
Total Estimated Number of Annual
Responses: 54.
Total Estimated Number of Annual
Burden Hours: 972.
Abstract: This information collection
solicits from all eligible States and
VerDate Sep<11>2014
16:44 Feb 24, 2022
Jkt 256001
outlying areas the State plans required
under Title I of the Carl D. Perkins
Career and Technical Education Act of
2006, as amended by the Strengthening
Career and Technical Education for the
21st Century (Perkins V.).
This request is to revise the
information collection to gather State
Plans and annual revision under Perkins
V.
Dated: February 22, 2022.
Kate Mullan,
PRA Coordinator, Strategic Collections and
Clearance, Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2022–04033 Filed 2–24–22; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–564–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing: AVC
Storage Loss Retainage Factor Update—
2022 to be effective 4/1/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5052.
Comment Date: 5 p.m. ET 3/2/22.
Docket Numbers: RP22–565–000.
Applicants: Rover Pipeline LLC.
Description: Compliance filing: Flow
Through of Cash-Out Penalty Revenues
filed on 2–18–22 to be effective N/A.
Filed Date: 2/18/22.
Accession Number: 20220218–5058.
Comment Date: 5 p.m. ET 3/2/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22–566–000.
Applicants: Empire Pipeline, Inc.
Description: § 4(d) Rate Filing: Empire
Fuel Tracker Per GT&C 23.3 to be
effective 4/1/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5077.
Comment Date: 5 p.m. ET 3/2/22.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
10779
Docket Numbers: RP22–567–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing (GTC 41) 2022 to be
effective 4/1/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5094.
Comment Date: 5 p.m. ET 3/2/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 18, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–04049 Filed 2–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–77–002.
Applicants: BlackRock, Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of BlackRock, Inc.
Filed Date: 2/18/22.
Accession Number: 20220218–5095.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: EC19–57–001.
Applicants: The Vanguard Group,
Inc., Vanguard Global Advisors, LLC,
Vanguard Asset Management, Ltd.,
Vanguard Investments Australia Ltd.,
Vanguard Fiduciary Trust Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of The Vanguard
Group, Inc., et al.
Filed Date: 2/16/22.
Accession Number: 20220216–5229.
Comment Date: 5 p.m. ET 3/9/22.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
E:\FR\FM\25FEN1.SGM
25FEN1
lotter on DSK11XQN23PROD with NOTICES1
10780
Federal Register / Vol. 87, No. 38 / Friday, February 25, 2022 / Notices
Docket Numbers: EL19–58–011.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing Docket Nos. EL19–
58, ER19–1486 to be effective 11/12/
2020.
Filed Date: 2/18/22.
Accession Number: 20220218–5124.
Comment Date: 5 p.m. ET 3/10/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3125–015.
Applicants: AL Sandersville, LLC.
Description: Supplement to August
20, 2021 Notice of Non-Material Change
in Status of AL Sandersville, LLC.
Filed Date: 2/18/22.
Accession Number: 20220218–5156.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER19–105–007.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing to Commission’s
1/20/22 Order in ER19–105 to be
effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5032.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20–1087–002.
Applicants: New England Electric
Transmission Corporation.
Description: Compliance filing: 2nd
Amended Order No. 864 Compliance
Filing of New England Electric
Transmission to be effective 1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218–5125.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20–1088–002.
Applicants: New England Hydro
Transmission Electric Company.
Description: Compliance filing: 2nd
Amended Order No. 864 Compliance
Filing—NEHTEC Massachusetts Phase II
Agmt to be effective 1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218–5135.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20–1089–002.
Applicants: New England Hydro
Transmission Corporation.
Description: Compliance filing: 2nd
Amended Order No. 864 Compliance
Filing—NEHTC New Hampshire Phase
II Agmt to be effective 1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218–5138.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER21–1694–002.
Applicants: ISO New England Inc.,
Green Mountain Power Corporation.
Description: Compliance filing: ISO
New England Inc. submits tariff filing
per 35: GMP; Compliance Filing to
VerDate Sep<11>2014
16:44 Feb 24, 2022
Jkt 256001
Revise Effective Date for Order No. 864
to be effective 1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218–5184.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1076–000.
Applicants: Hawtree Creek Farm
Solar, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5030.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1077–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii) 2022–02–18_SA 3785
ATC–WPL–West Sharon PCA to be
effective 4/20/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5055.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1078–000.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: § 205(d) Rate Filing: 2021
RIA Annual Update and Amend to be
effective 1/1/2021.
Filed Date: 2/18/22.
Accession Number: 20220218–5065.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1079–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
CCSF Sunol Golf Course Additional
Project Filing (SA 275) to be effective 4/
20/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5075.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1080–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Victorville SCLA Portland IFA DSA SA
No 1173 1174 WDT1662 to be effective
2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5109.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1081–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OA, Sch. 12 and RAA, Sch.
17 re: Quarterly Member Lists Update to
be effective 12/30/2021.
Filed Date: 2/18/22.
Accession Number: 20220218–5118.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1082–000.
PO 00000
Frm 00017
Fmt 4703
Sfmt 9990
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Commonwealth Edison Company
submits tariff filing per 35.13(a)(2)(iii)
ComEd submits Amendment to
Attachment H–13A to be effective 4/20/
2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5123.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1083–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA No. 3483, Queue
No. AA2–069—Garrison (amend) to be
effective 4/2/2018.
Filed Date: 2/18/22.
Accession Number: 20220218–5131.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1084–000.
Applicants: Deuel Harvest Wind
Energy LLC.
Description: § 205(d) Rate Filing:
Deuel Harvest Wind MBR Tariff
Amendment to be effective 4/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5152.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22–1085–000.
Applicants: Panorama Wind, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application and
Request for Expedited Action to be
effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218–5183.
Comment Date: 5 p.m. ET 3/11/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 18, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–04047 Filed 2–24–22; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\25FEN1.SGM
25FEN1
Agencies
[Federal Register Volume 87, Number 38 (Friday, February 25, 2022)]
[Notices]
[Pages 10779-10780]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04047]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC16-77-002.
Applicants: BlackRock, Inc.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of BlackRock, Inc.
Filed Date: 2/18/22.
Accession Number: 20220218-5095.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: EC19-57-001.
Applicants: The Vanguard Group, Inc., Vanguard Global Advisors,
LLC, Vanguard Asset Management, Ltd., Vanguard Investments Australia
Ltd., Vanguard Fiduciary Trust Company.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of The Vanguard Group, Inc., et al.
Filed Date: 2/16/22.
Accession Number: 20220216-5229.
Comment Date: 5 p.m. ET 3/9/22.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
[[Page 10780]]
Docket Numbers: EL19-58-011.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing Docket Nos. EL19-
58, ER19-1486 to be effective 11/12/2020.
Filed Date: 2/18/22.
Accession Number: 20220218-5124.
Comment Date: 5 p.m. ET 3/10/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3125-015.
Applicants: AL Sandersville, LLC.
Description: Supplement to August 20, 2021 Notice of Non-Material
Change in Status of AL Sandersville, LLC.
Filed Date: 2/18/22.
Accession Number: 20220218-5156.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER19-105-007.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing to Commission's
1/20/22 Order in ER19-105 to be effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5032.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20-1087-002.
Applicants: New England Electric Transmission Corporation.
Description: Compliance filing: 2nd Amended Order No. 864
Compliance Filing of New England Electric Transmission to be effective
1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218-5125.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20-1088-002.
Applicants: New England Hydro Transmission Electric Company.
Description: Compliance filing: 2nd Amended Order No. 864
Compliance Filing--NEHTEC Massachusetts Phase II Agmt to be effective
1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218-5135.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER20-1089-002.
Applicants: New England Hydro Transmission Corporation.
Description: Compliance filing: 2nd Amended Order No. 864
Compliance Filing--NEHTC New Hampshire Phase II Agmt to be effective 1/
27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218-5138.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER21-1694-002.
Applicants: ISO New England Inc., Green Mountain Power Corporation.
Description: Compliance filing: ISO New England Inc. submits tariff
filing per 35: GMP; Compliance Filing to Revise Effective Date for
Order No. 864 to be effective 1/27/2020.
Filed Date: 2/18/22.
Accession Number: 20220218-5184.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1076-000.
Applicants: Hawtree Creek Farm Solar, LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5030.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1077-000.
Applicants: Midcontinent Independent System Operator, Inc.,
American Transmission Company LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii) 2022-
02-18_SA 3785 ATC-WPL-West Sharon PCA to be effective 4/20/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5055.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1078-000.
Applicants: Deseret Generation & Transmission Co-operative, Inc.
Description: Sec. 205(d) Rate Filing: 2021 RIA Annual Update and
Amend to be effective 1/1/2021.
Filed Date: 2/18/22.
Accession Number: 20220218-5065.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1079-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: CCSF Sunol Golf Course
Additional Project Filing (SA 275) to be effective 4/20/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5075.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1080-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Victorville SCLA Portland
IFA DSA SA No 1173 1174 WDT1662 to be effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5109.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1081-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OA, Sch. 12 and
RAA, Sch. 17 re: Quarterly Member Lists Update to be effective 12/30/
2021.
Filed Date: 2/18/22.
Accession Number: 20220218-5118.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1082-000.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: Commonwealth Edison Company
submits tariff filing per 35.13(a)(2)(iii) ComEd submits Amendment to
Attachment H-13A to be effective 4/20/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5123.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1083-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA No. 3483,
Queue No. AA2-069--Garrison (amend) to be effective 4/2/2018.
Filed Date: 2/18/22.
Accession Number: 20220218-5131.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1084-000.
Applicants: Deuel Harvest Wind Energy LLC.
Description: Sec. 205(d) Rate Filing: Deuel Harvest Wind MBR
Tariff Amendment to be effective 4/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5152.
Comment Date: 5 p.m. ET 3/11/22.
Docket Numbers: ER22-1085-000.
Applicants: Panorama Wind, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
and Request for Expedited Action to be effective 2/19/2022.
Filed Date: 2/18/22.
Accession Number: 20220218-5183.
Comment Date: 5 p.m. ET 3/11/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 18, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-04047 Filed 2-24-22; 8:45 am]
BILLING CODE 6717-01-P