Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 8010-8011 [2022-02955]
Download as PDF
8010
Federal Register / Vol. 87, No. 29 / Friday, February 11, 2022 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1 Take
notice that the Commission received
the following electric rate filings:
Docket Numbers: ER21–1215–003.
Applicants: Assembly Solar I, LLC.
Description: Compliance filing:
Compliance Filing Under Docket ER21–
1215 to be effective 5/1/2021.
Filed Date: 2/7/22.
Accession Number: 20220207–5067.
Comment Date: 5 p.m. ET 2/28/22.
Docket Numbers: ER21–1794–002.
Applicants: White Oak Energy LLC.
Description: Compliance filing:
Compliance Filing Under Docket ER21–
1794 to be effective 7/1/2021.
Filed Date: 2/7/22.
Accession Number: 20220207–5069.
Comment Date: 5 p.m. ET 2/28/22.
Docket Numbers: ER22–998–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing: New
York State Electric & Gas Corporation
submits tariff filing per 35.13(a)(2)(iii:
205: E&P Agreement between NYSEG
and Watkins Glen Solar (SA 2685) to be
effective 1/10/2022.
Filed Date: 2/7/22.
Accession Number: 20220207–5068.
Comment Date: 5 p.m. ET 2/28/22.
Docket Numbers: ER22–999–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2022–02–07_SA 2332 Termination of
MidAmerican-Cornbelt-Hudson WDS to
be effective 1/21/2022.
Filed Date: 2/7/22.
Accession Number: 20220207–5114.
Comment Date: 5 p.m. ET 2/28/22.
Docket Numbers: ER22–1000–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2022–02–07_SA 2022
Ameren-Kirkwood 2nd Rev WDS to be
effective 4/1/2022.
Filed Date: 2/7/22.
Accession Number: 20220207–5131.
Comment Date: 5 p.m. ET 2/28/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number. Any person desiring to
intervene or protest in any of the above
proceedings must file in accordance
VerDate Sep<11>2014
17:29 Feb 10, 2022
Jkt 256001
with Rules 211 and 214 of the
Commission’s Regulations (18 CFR
385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified
comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding. eFiling is encouraged. More
detailed information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–02962 Filed 2–10–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–45–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on January 28, 2022,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002, filed in the
above referenced docket a prior notice
pursuant to Section 157.205 and
157.216(b) of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act and the
blanket certificate issued by the
Commission in Docket No. CP83–76–
000,1 seeking authorization to abandon
two injection/withdrawal wells and its
associated pipelines and appurtenances
located in its Wellington Storage Fields
in Lorain County, Ohio. Specifically,
Columbia states that the wells and
storage line sections, to be abandon,
provide little value and contribute only
a de minimis amount to the total
deliverability of the storage field.
Columbia estimates the cost of the
project to be $1,200,000, all as more
fully set forth in the request which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002, by telephone at (832) 320–5477,
or by email at David_alonzo@
tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on April 8, 2022. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations, 4 and must be submitted by
the protest deadline, which is April 8,
2 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
3 Persons
1 Columbia Gas Transmission Corporation
(predecessor to Columbia Gas Transmission, LLC),
22 FERC ¶ 62,029 (1983).
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\11FEN1.SGM
11FEN1
Federal Register / Vol. 87, No. 29 / Friday, February 11, 2022 / Notices
proceeding. To become a party, you
must intervene in the proceeding.
2022. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
How To File Protests, Interventions, and
Comments
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is April 8, 2022.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
lotter on DSK11XQN23PROD with NOTICES1
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before April 8,
2022. The filing of a comment alone will
not serve to make the filer a party to the
5 18
6 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
17:29 Feb 10, 2022
Jkt 256001
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP22–45–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’ The
Commission’s eFiling staff are available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP22–45–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas, 77002, by telephone at (832)
320–5477, or by email at David_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
8011
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: February 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–02955 Filed 2–10–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15247–000]
PacifiCorp; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 13, 2021, PacifiCorp filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the South Fork Pumped
Storage Project (South Fork Project or
project) to be located near Lake Viva
Naughton, Lincoln County, Wyoming.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
Two alternatives are being considered
for the South Fork Project. Alternative 1
would consist of the following: (1) An
upper reservoir approximately 3.5 miles
east of Lake Viva Naughton with a
surface area of 210 acres and a storage
volume of approximately 3,348 acre-feet
created by a 1,870-foot-long, 340-foothigh embankment dam; (2) a new
intake/outlet on Lake Viva Naughton,
which will serve as the lower reservoir;
(3) a 4.2-mile-long steel penstock with a
diameter of 23-feet connecting the upper
reservoir with the powerhouse/pump
station; (4) a 50-foot-long, 150-foot-wide
concrete powerhouse/pump station
located on the eastern shoreline of Lake
Viva Naughton containing three 167megawatt generating/pumping units; (5)
a 4.4-mile, 345-kilovolt transmission
line and new substation interconnecting
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 87, Number 29 (Friday, February 11, 2022)]
[Notices]
[Pages 8010-8011]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02955]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-45-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on January 28, 2022, Columbia Gas Transmission,
LLC (Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002,
filed in the above referenced docket a prior notice pursuant to Section
157.205 and 157.216(b) of the Federal Energy Regulatory Commission's
regulations under the Natural Gas Act and the blanket certificate
issued by the Commission in Docket No. CP83-76-000,\1\ seeking
authorization to abandon two injection/withdrawal wells and its
associated pipelines and appurtenances located in its Wellington
Storage Fields in Lorain County, Ohio. Specifically, Columbia states
that the wells and storage line sections, to be abandon, provide little
value and contribute only a de minimis amount to the total
deliverability of the storage field. Columbia estimates the cost of the
project to be $1,200,000, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
---------------------------------------------------------------------------
\1\ Columbia Gas Transmission Corporation (predecessor to
Columbia Gas Transmission, LLC), 22 FERC ] 62,029 (1983).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas
77002, by telephone at (832) 320-5477, or by email at
[email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on April 8, 2022. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is April 8,
[[Page 8011]]
2022. A protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is April 8, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before April 8, 2022. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP22-45-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling
staff are available to assist you at (202) 502-8258 or
[email protected]
(2) You can file a paper copy of your submission. Your submission
must reference the Project docket number CP22-45-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, Columbia Gas Transmission,
LLC, 700 Louisiana Street, Suite 1300, Houston, Texas, 77002, by
telephone at (832) 320-5477, or by email at [email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: February 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-02955 Filed 2-10-22; 8:45 am]
BILLING CODE 6717-01-P