Buy America Waiver Notification, 6936-6938 [2022-02449]
Download as PDF
6936
Federal Register / Vol. 87, No. 25 / Monday, February 7, 2022 / Notices
2. As discussed above, the trackage
rights in Docket No. FD 36377 (Sub-No.
4) are permitted to expire at midnight
on December 31, 2022, subject to the
employee protective conditions set forth
in Oregon Short Line.
3. Notice of this decision will be
published in the Federal Register.
4. This decision is effective on March
9, 2022. Petitions for stay must be filed
by February 17, 2022. Petitions for
reconsideration must be filed by
February 28, 2022.
By the Board, Board Members Fuchs,
Hedlund, Oberman, Primus, and Schultz.
Aretha Laws-Byrum,
Clearance Clerk.
Federal Highway Administration
Buy America Waiver Notification
Notice.
This notice provides
information regarding FHWA’s finding
that it is appropriate to grant a Buy
America waiver to the Golden Gate
Bridge, Highway & Transportation
District (District) for procurement of
foreign iron and steel components for
the maintenance traveler system, which
is needed to allow continued
inspections and routine maintenance
operations after the Golden Gate Bridge
Physical Suicide Deterrent System
Project (Project) is constructed. The
non-domestic parts include: (i) Electric
motors; (ii) speed reducers; (iii) wheel
chocks; (iv) a chain stopper; (v) rail
clamps with hydraulic power units; (vi)
pneumatic brakes; (vii) air compressors;
(viii) gas cylinder stands; (ix) bearings
(of various types specified in the
request); (x) electric cabinet switches
and handles; (xi) electrical cabinet
shafts; (xii) grounding shoes; and (xiii)
scissor lifts.
SUMMARY:
[Docket No. EP 290 (Sub-No. 4)]
Railroad Cost Recovery Procedures—
Productivity Adjustment
Surface Transportation Board.
Presentation of the Board’s
calculation for the change in railroad
productivity for the 2016–2020
averaging period.
ACTION:
In a decision served on
February 3, 2022, the Board proposed to
adopt 1.025 (2.5% per year) as the
measure of average (geometric mean)
change in railroad productivity for the
2016–2020 (five-year) period. The
Board’s February 3, 2022 decision stated
that comments may be filed addressing
any perceived data and computational
errors in the Board’s calculation. The
decision also stated that, unless a
further order is issued postponing the
effective date, the decision will take
effect on March 1, 2022.
SUMMARY:
Comments are due by February
24, 2022.
DATES:
Comments may be e-filed
on the Board’s website at www.stb.gov.
Comments must be served on all parties
appearing on the service list.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
jspears on DSK121TN23PROD with NOTICES1
DEPARTMENT OF TRANSPORTATION
ACTION:
SURFACE TRANSPORTATION BOARD
Pedro Ramirez at (202) 245–0333.
Assistance for the hearing impaired is
available through the Federal Relay
Service at (800) 877–8339.
Jkt 256001
For
questions about this notice, please
contact Mr. Brian Hogge, FHWA Office
of Infrastructure, 202–366–1562, or via
email at Brian.Hogge@dot.gov. For legal
questions, please contact Mr. Patrick C.
Smith, FHWA Office of the Chief
Counsel, 202–366–1345, or via email at
Patrick.C.Smith@dot.gov. Office hours
for FHWA are from 8:00 a.m. to 4:30
p.m., E.T., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Electronic Access
Additional information is contained in
the Board’s decision, which is available
at www.stb.gov.
Decided: February 2, 2022.
The effective date of the waiver
is February 8, 2022.
DATES:
SUPPLEMENTARY INFORMATION:
SUPPLEMENTARY INFORMATION:
17:36 Feb 04, 2022
BILLING CODE 4915–01–P
Federal Highway
Administration (FHWA), Department of
Transportation (DOT).
BILLING CODE 4915–01–P
VerDate Sep<11>2014
[FR Doc. 2022–02508 Filed 2–4–22; 8:45 am]
AGENCY:
[FR Doc. 2022–02479 Filed 2–4–22; 8:45 am]
AGENCY:
By the Board, Board Members Fuchs,
Hedlund, Oberman, Primus, and Schultz.
Kenyatta Clay,
Clearance Clerk.
An electronic copy of this document
may be downloaded from the Federal
Register’s home page at:
www.FederalRegister.gov and the
Government Publishing Office’s
database at: www.GovInfo.gov.
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
Background
FHWA’s Buy America regulation in
23 CFR 635.410 requires a domestic
manufacturing process for any steel or
iron products (including protective
coatings) that are permanently
incorporated in a Federal-aid
construction project. The regulation also
provides for a waiver of the Buy
America requirements when the
application would be inconsistent with
the public interest or when satisfactory
quality domestic steel and iron products
are not produced in the United States in
sufficient and reasonably available
quantities. This notice provides
information regarding FHWA’s finding
that it is appropriate to grant the District
a Buy America waiver for procurement
of foreign iron and steel components for
the maintenance traveler system, which
is needed to allow continued
inspections and routine maintenance
operations after the Project is
constructed. The non-domestic parts
include: (i) Electric motors; (ii) speed
reducers; (iii) wheel chocks; (iv) a chain
stopper; (v) rail clamps with hydraulic
power units; (vi) pneumatic brakes; (vii)
air compressors; (viii) gas cylinder
stands; (ix) bearings (of various types
specified in the request); (x) electric
cabinet switches and handles; (xi)
electrical cabinet shafts; (xii) grounding
shoes; and (xiii) scissor lifts.
Background on the Project: On
average, 30 people die from suicide at
the Golden Gate Bridge each year.
Hundreds more are stopped by the
District, the California Highway Patrol,
or other intervention. The District
determined that a physical barrier was
needed to stop suicides from the bridge.
The Project, Federal Aid Project No.
BHLS–6003(051), involves the
construction of a horizontal stainlesssteel net supported by steel net supports
for the full length of the bridge, except
for a tall vertical railing installed in one
location. The horizontal steel net system
uses all American steel. The Project also
includes the replacement of the bridge
maintenance travelers with new
travelers because the installation of the
net will block the movement of the
existing travelers. In this context, a
‘‘traveler’’ means a moveable inspection
and maintenance platform, which
travels on steel rails and trolley beams
and is designed to provide access to the
bridge. A new replacement traveler
access system is necessary to allow
continued inspections and routine
maintenance operations after the
Suicide Deterrent System is constructed.
Some of the traveler equipment is not
available with the required Buy America
certification because it is not
E:\FR\FM\07FEN1.SGM
07FEN1
jspears on DSK121TN23PROD with NOTICES1
Federal Register / Vol. 87, No. 25 / Monday, February 7, 2022 / Notices
manufactured in America or
manufactured in America with some
non-domestic parts.
The contract for the Project also
encompasses the Golden Gate Bridge
Wind Retrofit Project, Federal Aid
Project No. BHLS–6003(052). The
current construction contract amount
for both projects is approximately
$142.1 million (with $132.6 million for
the Suicide Deterrent System Project
and $9.5 million for the Wind Retrofit
Project). The estimated value of the
components under the requested waiver
is approximately $2.6 million (or less
than two percent of the total contract
amount). The construction contract
specifies that the Project is partially
funded with Federal funds and that the
FHWA Buy America provisions apply.
For the Suicide Deterrent System
Project, approximately 65 percent of the
total Project cost is Federal, 4 percent is
from the State, and 31 percent is local.
Under 23 U.S.C. 313(g), FHWA’s Buy
America requirement applies to the
entire scope of the project, as defined in
the NEPA document, when Federal
funds are used in any part of the project
regardless of whether Federal funds are
used in the actual component that is
subject to the waiver.
The traveler system is a ‘‘contractordesigned’’ element of this low-bid
construction contract. As such, the fact
that some of the requisite traveler
equipment is not available with Buy
America certifications was not
identified until after the contract was
awarded and the contractor completed
the traveler design. Specifically, the
new travelers will be propelled by
electric drive systems that include some
manufactured mechanical and electrical
control components that are not
available with the Buy America
certification. The travelers must also be
equipped with electric scissor lifts that
are similarly not available with the Buy
America certification.
Background on Waiver Request: The
District originally submitted a Buy
America waiver request letter to FHWA
on June 24, 2020. Prior to requesting a
waiver, the District unsuccessfully
attempted to identify domestic
manufacturers for these products. The
District reported to FHWA in the waiver
request letter that the District, its
contractor, and consultants contacted
numerous manufacturers and
distributors to identify products that
complied with Buy America but were
not successful in locating any domestic
manufacturers or fabricators of the
relevant products. Attachment 1 to the
request letter provided a record of the
District’s efforts. The waiver request
included the following non-domestic
VerDate Sep<11>2014
17:36 Feb 04, 2022
Jkt 256001
parts: (i) Electric motors; (ii) speed
reducers; (iii) wheel chocks; (iv) a chain
stopper; (v) rail clamps with hydraulic
power units; (vi) pneumatic brakes; (vii)
air compressors; (viii) gas cylinder
stands; (ix) bearings (of various types
specified in the request); (x) electric
cabinet switches and handles; (xi)
electrical cabinet shafts; (xii) grounding
shoes; and (xiii) scissor lifts.
Attachment 1 to the request letter
provided further information on these
parts.
In accordance with the Consolidated
Appropriations Act, 2021 (Pub. L. 116–
260), FHWA published a notice seeking
comment on whether a waiver was
appropriate on its website, https://
www.fhwa.dot.gov/construction/
contracts/waivers.cfm?id=157, on
September 27, 2021.
The FHWA received 14 comments in
response to the publication. Eight
commenters opposed the waiver, two
supported it, and four of the comments
documented the District’s efforts to
follow-up with one of the commenters
opposing the waiver. Seven of the
comments opposing the waiver did not
offer any specific information on the
availability of compliant products, nor
did they suggest specific, additional
actions that the District could take to
maximize its use of goods, products,
and materials produced in the United
States. One commenter opposing the
waiver indicated that he believed the
parts were available from domestic
suppliers but also did not name a
specific manufacturer. This comment
was submitted on September 28, 2021,
and invited the District to contact the
commenter for additional information
on his statement. On October 4, 2021,
the District responded to this
commenter on the website requesting
the names of United States
manufacturers able to provide the
relevant parts. On October 13, 2021, the
District emailed this commenter at the
email address he used to submit the
comment asking the same. On October
25, 2021, the District posted a new
comment to the website explaining that
it had received no reply, either by email
or phone, to its questions for this
commenter. Thus, the District did not
receive any new information indicating
that the subject parts could be produced
by domestic manufacturers from any of
the commenters opposing the waiver.
Although the District did not identify
compliant components for the
maintenance travelers, it provided
information to FHWA supporting its
waiver request, including information:
• Supporting the necessity of these
specific maintenance travelers for
allowing continued access to the bridge
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
6937
for performing inspections and
maintenance operations after the suicide
prevention nets are installed;
• Documenting efforts to locate
compliant manufactured products;
• Demonstrating that alternative
designs were infeasible; and
• Describing the effects of denying
the request.
Although ultimately unsuccessful, the
District made substantial efforts to find
suitable Buy America compliant
components for the maintenance
travelers.
Timing and Need for a Waiver. The
District maintains that approval of a Buy
America waiver for the relevant
components of the maintenance
travelers is now critical to maintain the
schedule of ongoing construction on the
Project. The District explained in early
2021 that it was already at a juncture
where delays in the approval of the Buy
America waiver may delay completion
of construction with commensurate
additional payments to the contractor.
Executive Order 14005. Executive
Order 14005, ‘‘Ensuring the Future is
Made in All of America by All of
America’s Workers,’’ provides that
agencies should, consistent with
applicable law, maximize the use of
goods, products, and materials
produced in, and services offered in, the
United States. 86 FR 7475 (Jan. 28,
2021). Based on the information
contained in the waiver request from the
District and the lack of responsive
comments following publication of a
notice seeking comment on September
28, 2021, regarding available domestic
manufacturers for the subject parts,
FHWA concludes that issuing a waiver
is consistent with Executive Order
14005.
Finding and Request for Comments
Based on all the information available
to the Agency, FHWA concludes that
there are no Buy America-compliant
relevant components for the
maintenance travelers for the Project,
specifically including: (i) Electric
motors; (ii) speed reducers; (iii) wheel
chocks; (iv) a chain stopper; (v) rail
clamps with hydraulic power units; (vi)
pneumatic brakes; (vii) air compressors;
(viii) gas cylinder stands; (ix) bearings
(of various types specified in the
request); (x) electric cabinet switches
and handles; (xi) electrical cabinet
shafts; (xii) grounding shoes; and (xiii)
scissor lifts. This finding only includes
components identified in the waiver
request and supporting documents
included on FHWA’s website.
The District and its contractors and
subcontractors involved in the
procurement of the relevant components
E:\FR\FM\07FEN1.SGM
07FEN1
6938
Federal Register / Vol. 87, No. 25 / Monday, February 7, 2022 / Notices
are reminded of the need to comply
with the Cargo Preference Act in 46 CFR
part 38, if applicable.
In accordance with the provisions of
Section 117 of the SAFETEA–LU
Technical Corrections Act of 2008 (Pub.
L. 110–244, 122 stat. 1572), FHWA is
providing this notice as its finding that
a waiver of Buy America requirements
is appropriate. FHWA invites public
comment on this finding for an
additional five (5) days following the
effective date of the finding. Comments
may be submitted to FHWA’s website
via the link provided to the waiver page
noted above.
Authority: 23 U.S.C. 313; Pub. L. 110–
244; Pub. L. 116–260; 23 CFR 635.410.
Stephanie Pollack,
Deputy Administrator, Federal Highway
Administration.
[FR Doc. 2022–02449 Filed 2–4–22; 8:45 am]
BILLING CODE 4910–22–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2010–0033]
New Jersey Transit’s Request To
Amend Its Positive Train Control
Safety Plan and Positive Train Control
System
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of availability and
request for comments.
AGENCY:
This document provides the
public with notice that, on January 14,
2022, New Jersey Transit (NJT)
submitted a request for amendment
(RFA) to its FRA-approved Positive
Train Control Safety Plan (PTCSP). As
this RFA may involve a request for
FRA’s approval of proposed material
modifications to an FRA-certified
positive train control (PTC) system, FRA
is publishing this notice and inviting
public comment on the railroad’s RFA
to its PTCSP.
DATES: FRA will consider comments
received by February 28, 2022. FRA may
consider comments received after that
date to the extent practicable and
without delaying implementation of
valuable or necessary modifications to a
PTC system.
ADDRESSES:
Comments: Comments may be
submitted by going to https://
www.regulations.gov and following the
online instructions for submitting
comments.
Instructions: All submissions must
include the agency name and the
jspears on DSK121TN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:36 Feb 04, 2022
Jkt 256001
applicable docket number. The relevant
PTC docket number for this host
railroad is Docket No. FRA–2010–0033.
For convenience, all active PTC dockets
are hyperlinked on FRA’s website at
https://railroads.dot.gov/train-control/
ptc/ptc-annual-and-quarterly-reports.
All comments received will be posted
without change to https://
www.regulations.gov; this includes any
personal information.
FOR FURTHER INFORMATION CONTACT:
Gabe Neal, Staff Director, Signal, Train
Control, and Crossings Division,
telephone: 816–516–7168, email:
Gabe.Neal@dot.gov.
SUPPLEMENTARY INFORMATION: In general,
Title 49 United States Code (U.S.C.)
section 20157(h) requires FRA to certify
that a host railroad’s PTC system
complies with 49 CFR part 236, subpart
I, before the technology may be operated
in revenue service. Before making
certain changes to an FRA-certified PTC
system or the associated FRA-approved
PTCSP, a host railroad must submit, and
obtain FRA’s approval of, an RFA to its
PTCSP under Title 49 Code of Federal
Regulations (CFR) Section 236.1021.
Under 49 CFR 236.1021(e), FRA’s
regulations provide that FRA will
publish a notice in the Federal Register
and invite public comment in
accordance with 49 CFR part 211, if an
RFA includes a request for approval of
a material modification of a signal and
train control system. Accordingly, this
notice informs the public that on
January 14, 2022, NJT submitted an RFA
to its PTCSP for its Advanced Speed
Enforcement System II (ASES II) and
that RFA is available in Docket No.
FRA–2010–0033.
Interested parties are invited to
comment on NJT’s RFA to its PTCSP by
submitting written comments or data.
During FRA’s review of this railroad’s
RFA, FRA will consider any comments
or data submitted within the timeline
specified in this notice and to the extent
practicable, without delaying
implementation of valuable or necessary
modifications to a PTC system. See 49
CFR 236.1021; see also 49 CFR
236.1011(e). Under 49 CFR 236.1021,
FRA maintains the authority to approve,
approve with conditions, or deny a
railroad’s RFA to its PTCSP at FRA’s
sole discretion.
Privacy Act Notice
In accordance with 49 CFR 211.3,
FRA solicits comments from the public
to better inform its decisions. DOT posts
these comments, without edit, including
any personal information the
commenter provides, to https://
www.regulations.gov, as described in
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
the system of records notice (DOT/ALL–
14 FDMS), which can be reviewed at
https://www.transportation.gov/privacy.
See https://www.regulations.gov/
privacy-notice for the privacy notice of
regulations.gov. To facilitate comment
tracking, we encourage commenters to
provide their name, or the name of their
organization; however, submission of
names is completely optional. If you
wish to provide comments containing
proprietary or confidential information,
please contact FRA for alternate
submission instructions.
Issued in Washington, DC.
Carolyn R. Hayward-Williams,
Director, Office of Railroad Systems and
Technology.
[FR Doc. 2022–02512 Filed 2–4–22; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2022–0006]
Request for Information for the
Corridor Identification and
Development Program
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Request for information (RFI).
AGENCY:
On November 15, 2021,
President Biden signed into law the
Infrastructure Investment and Jobs Act,
also known as the Bipartisan
Infrastructure Law (BIL). The BIL
provides historic appropriations for
railroad transportation grant programs
administered by the Federal Railroad
Administration (FRA), and also
authorizes new programs to enhance rail
safety and to repair, restore, improve,
and expand the nation’s rail network.
Among those new programs is the
Corridor Identification and
Development Program (the Program),
which creates a new framework to
facilitate the development of new,
enhanced, and restored intercity
passenger rail corridors throughout the
country. The BIL requires the Secretary
of Transportation to establish the
Program within 180 days of enactment
(i.e., May 14, 2022). This responsibility
is delegated to FRA. In this request for
information (RFI), FRA is seeking
comments on the Program and how it
can best serve stakeholders and the
public in facilitating the development of
intercity passenger rail corridors.
DATES: Written comments on this RFI
must be received on or before March 9,
SUMMARY:
E:\FR\FM\07FEN1.SGM
07FEN1
Agencies
[Federal Register Volume 87, Number 25 (Monday, February 7, 2022)]
[Notices]
[Pages 6936-6938]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02449]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Buy America Waiver Notification
AGENCY: Federal Highway Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice provides information regarding FHWA's finding that
it is appropriate to grant a Buy America waiver to the Golden Gate
Bridge, Highway & Transportation District (District) for procurement of
foreign iron and steel components for the maintenance traveler system,
which is needed to allow continued inspections and routine maintenance
operations after the Golden Gate Bridge Physical Suicide Deterrent
System Project (Project) is constructed. The non-domestic parts
include: (i) Electric motors; (ii) speed reducers; (iii) wheel chocks;
(iv) a chain stopper; (v) rail clamps with hydraulic power units; (vi)
pneumatic brakes; (vii) air compressors; (viii) gas cylinder stands;
(ix) bearings (of various types specified in the request); (x) electric
cabinet switches and handles; (xi) electrical cabinet shafts; (xii)
grounding shoes; and (xiii) scissor lifts.
DATES: The effective date of the waiver is February 8, 2022.
FOR FURTHER INFORMATION CONTACT: For questions about this notice,
please contact Mr. Brian Hogge, FHWA Office of Infrastructure, 202-366-
1562, or via email at [email protected]. For legal questions, please
contact Mr. Patrick C. Smith, FHWA Office of the Chief Counsel, 202-
366-1345, or via email at [email protected]. Office hours for
FHWA are from 8:00 a.m. to 4:30 p.m., E.T., Monday through Friday,
except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this document may be downloaded from the
Federal Register's home page at: www.FederalRegister.gov and the
Government Publishing Office's database at: www.GovInfo.gov.
Background
FHWA's Buy America regulation in 23 CFR 635.410 requires a domestic
manufacturing process for any steel or iron products (including
protective coatings) that are permanently incorporated in a Federal-aid
construction project. The regulation also provides for a waiver of the
Buy America requirements when the application would be inconsistent
with the public interest or when satisfactory quality domestic steel
and iron products are not produced in the United States in sufficient
and reasonably available quantities. This notice provides information
regarding FHWA's finding that it is appropriate to grant the District a
Buy America waiver for procurement of foreign iron and steel components
for the maintenance traveler system, which is needed to allow continued
inspections and routine maintenance operations after the Project is
constructed. The non-domestic parts include: (i) Electric motors; (ii)
speed reducers; (iii) wheel chocks; (iv) a chain stopper; (v) rail
clamps with hydraulic power units; (vi) pneumatic brakes; (vii) air
compressors; (viii) gas cylinder stands; (ix) bearings (of various
types specified in the request); (x) electric cabinet switches and
handles; (xi) electrical cabinet shafts; (xii) grounding shoes; and
(xiii) scissor lifts.
Background on the Project: On average, 30 people die from suicide
at the Golden Gate Bridge each year. Hundreds more are stopped by the
District, the California Highway Patrol, or other intervention. The
District determined that a physical barrier was needed to stop suicides
from the bridge. The Project, Federal Aid Project No. BHLS-6003(051),
involves the construction of a horizontal stainless-steel net supported
by steel net supports for the full length of the bridge, except for a
tall vertical railing installed in one location. The horizontal steel
net system uses all American steel. The Project also includes the
replacement of the bridge maintenance travelers with new travelers
because the installation of the net will block the movement of the
existing travelers. In this context, a ``traveler'' means a moveable
inspection and maintenance platform, which travels on steel rails and
trolley beams and is designed to provide access to the bridge. A new
replacement traveler access system is necessary to allow continued
inspections and routine maintenance operations after the Suicide
Deterrent System is constructed. Some of the traveler equipment is not
available with the required Buy America certification because it is not
[[Page 6937]]
manufactured in America or manufactured in America with some non-
domestic parts.
The contract for the Project also encompasses the Golden Gate
Bridge Wind Retrofit Project, Federal Aid Project No. BHLS-6003(052).
The current construction contract amount for both projects is
approximately $142.1 million (with $132.6 million for the Suicide
Deterrent System Project and $9.5 million for the Wind Retrofit
Project). The estimated value of the components under the requested
waiver is approximately $2.6 million (or less than two percent of the
total contract amount). The construction contract specifies that the
Project is partially funded with Federal funds and that the FHWA Buy
America provisions apply. For the Suicide Deterrent System Project,
approximately 65 percent of the total Project cost is Federal, 4
percent is from the State, and 31 percent is local. Under 23 U.S.C.
313(g), FHWA's Buy America requirement applies to the entire scope of
the project, as defined in the NEPA document, when Federal funds are
used in any part of the project regardless of whether Federal funds are
used in the actual component that is subject to the waiver.
The traveler system is a ``contractor-designed'' element of this
low-bid construction contract. As such, the fact that some of the
requisite traveler equipment is not available with Buy America
certifications was not identified until after the contract was awarded
and the contractor completed the traveler design. Specifically, the new
travelers will be propelled by electric drive systems that include some
manufactured mechanical and electrical control components that are not
available with the Buy America certification. The travelers must also
be equipped with electric scissor lifts that are similarly not
available with the Buy America certification.
Background on Waiver Request: The District originally submitted a
Buy America waiver request letter to FHWA on June 24, 2020. Prior to
requesting a waiver, the District unsuccessfully attempted to identify
domestic manufacturers for these products. The District reported to
FHWA in the waiver request letter that the District, its contractor,
and consultants contacted numerous manufacturers and distributors to
identify products that complied with Buy America but were not
successful in locating any domestic manufacturers or fabricators of the
relevant products. Attachment 1 to the request letter provided a record
of the District's efforts. The waiver request included the following
non-domestic parts: (i) Electric motors; (ii) speed reducers; (iii)
wheel chocks; (iv) a chain stopper; (v) rail clamps with hydraulic
power units; (vi) pneumatic brakes; (vii) air compressors; (viii) gas
cylinder stands; (ix) bearings (of various types specified in the
request); (x) electric cabinet switches and handles; (xi) electrical
cabinet shafts; (xii) grounding shoes; and (xiii) scissor lifts.
Attachment 1 to the request letter provided further information on
these parts.
In accordance with the Consolidated Appropriations Act, 2021 (Pub.
L. 116-260), FHWA published a notice seeking comment on whether a
waiver was appropriate on its website, https://www.fhwa.dot.gov/construction/contracts/waivers.cfm?id=157, on September 27, 2021.
The FHWA received 14 comments in response to the publication. Eight
commenters opposed the waiver, two supported it, and four of the
comments documented the District's efforts to follow-up with one of the
commenters opposing the waiver. Seven of the comments opposing the
waiver did not offer any specific information on the availability of
compliant products, nor did they suggest specific, additional actions
that the District could take to maximize its use of goods, products,
and materials produced in the United States. One commenter opposing the
waiver indicated that he believed the parts were available from
domestic suppliers but also did not name a specific manufacturer. This
comment was submitted on September 28, 2021, and invited the District
to contact the commenter for additional information on his statement.
On October 4, 2021, the District responded to this commenter on the
website requesting the names of United States manufacturers able to
provide the relevant parts. On October 13, 2021, the District emailed
this commenter at the email address he used to submit the comment
asking the same. On October 25, 2021, the District posted a new comment
to the website explaining that it had received no reply, either by
email or phone, to its questions for this commenter. Thus, the District
did not receive any new information indicating that the subject parts
could be produced by domestic manufacturers from any of the commenters
opposing the waiver.
Although the District did not identify compliant components for the
maintenance travelers, it provided information to FHWA supporting its
waiver request, including information:
Supporting the necessity of these specific maintenance
travelers for allowing continued access to the bridge for performing
inspections and maintenance operations after the suicide prevention
nets are installed;
Documenting efforts to locate compliant manufactured
products;
Demonstrating that alternative designs were infeasible;
and
Describing the effects of denying the request.
Although ultimately unsuccessful, the District made substantial
efforts to find suitable Buy America compliant components for the
maintenance travelers.
Timing and Need for a Waiver. The District maintains that approval
of a Buy America waiver for the relevant components of the maintenance
travelers is now critical to maintain the schedule of ongoing
construction on the Project. The District explained in early 2021 that
it was already at a juncture where delays in the approval of the Buy
America waiver may delay completion of construction with commensurate
additional payments to the contractor.
Executive Order 14005. Executive Order 14005, ``Ensuring the Future
is Made in All of America by All of America's Workers,'' provides that
agencies should, consistent with applicable law, maximize the use of
goods, products, and materials produced in, and services offered in,
the United States. 86 FR 7475 (Jan. 28, 2021). Based on the information
contained in the waiver request from the District and the lack of
responsive comments following publication of a notice seeking comment
on September 28, 2021, regarding available domestic manufacturers for
the subject parts, FHWA concludes that issuing a waiver is consistent
with Executive Order 14005.
Finding and Request for Comments
Based on all the information available to the Agency, FHWA
concludes that there are no Buy America-compliant relevant components
for the maintenance travelers for the Project, specifically including:
(i) Electric motors; (ii) speed reducers; (iii) wheel chocks; (iv) a
chain stopper; (v) rail clamps with hydraulic power units; (vi)
pneumatic brakes; (vii) air compressors; (viii) gas cylinder stands;
(ix) bearings (of various types specified in the request); (x) electric
cabinet switches and handles; (xi) electrical cabinet shafts; (xii)
grounding shoes; and (xiii) scissor lifts. This finding only includes
components identified in the waiver request and supporting documents
included on FHWA's website.
The District and its contractors and subcontractors involved in the
procurement of the relevant components
[[Page 6938]]
are reminded of the need to comply with the Cargo Preference Act in 46
CFR part 38, if applicable.
In accordance with the provisions of Section 117 of the SAFETEA-LU
Technical Corrections Act of 2008 (Pub. L. 110-244, 122 stat. 1572),
FHWA is providing this notice as its finding that a waiver of Buy
America requirements is appropriate. FHWA invites public comment on
this finding for an additional five (5) days following the effective
date of the finding. Comments may be submitted to FHWA's website via
the link provided to the waiver page noted above.
Authority: 23 U.S.C. 313; Pub. L. 110-244; Pub. L. 116-260; 23 CFR
635.410.
Stephanie Pollack,
Deputy Administrator, Federal Highway Administration.
[FR Doc. 2022-02449 Filed 2-4-22; 8:45 am]
BILLING CODE 4910-22-P