United Energy Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 6531-6532 [2022-02385]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 24 / Friday, February 4, 2022 / Notices electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Watson Dam Project (P– 6240–064). The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. The application is not ready for environmental analysis at this time. l. The existing Watson Dam Project (Figure 2) consists of: (1) A 292.5-footlong, 12-foot-high concrete gravity dam that includes the following sections: (a) A 54-foot-long right abutment; (b) a 111foot-long right spillway section with 24inch-high flashboards and a crest elevation of 110.1 North American Vertical Datum of 1988 (NAVD 88) at the top of the flashboards; (c) a 12-footlong, 11. 5-foot-wide concrete spillway center pier; (d) an 80-foot-long left spillway section with 24-inch-high flashboards and a crest elevation of 110.2 feet NAVD 88 at the top of the flashboards; and (e) a 24-foot-long left abutment; (2) an impoundment with a surface area of 54 acres and a storage capacity of 300 acre-feet at an elevation of 110.1 feet NAVD 88; (3) a 26-footlong, 24-foot-wide intake structure in the left abutment that is equipped with an 8.5-foot-diameter headgate and trashrack with 2-inch clear bar spacing; (4) a 26.5-foot-long, 34-foot-wide wood and steel powerhouse containing one 265-kilowatt vertical Flygt submersible turbine-generator unit; (5) a 250-footlong, 20-foot-wide tailrace that discharges into the Cocheco River; (6) a 0.48/12.47-kilovolt (kV) step-up transformer and an 80-foot-long, 12.47 kV transmission line that connect the project to the local utility distribution system; and (7) appurtenant facilities. The project creates an approximately 250-foot-long and a 400-foot-long bifurcated bypassed reaches of the Cocheco River. VerDate Sep<11>2014 18:50 Feb 03, 2022 Jkt 256001 Watson Associates voluntarily operates the project in a run-of-river mode using an automatic pond level control system to regulate turbine operation, such that outflow from the project approximates inflow. Downstream fish passage is provided by a bypass facility located next to the project’s intake on the left side of the dam. There is no upstream fish passage facility at the project. Article 26 of the current license requires a minimum flow of 83 cfs or inflow to the impoundment, whichever is less, from the project, to protect and enhance aquatic resources in the Cocheco River. Watson Associates is required to operate the downstream fish passage facility from October 1 through November 15 of each year. The average annual energy production of the project is approximately 1,100. MWh. Watson Associates proposes to: (1) Continue to operate the project in a runof-river mode; (2) continue to provide downstream fish passage through the bypass facility; and (3) consult with the New Hampshire State Historic Preservation Officer before beginning any land-disturbing activities or alterations to known historic structures within the project boundary. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents via the internet through the Commission’s Home Page (https://www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. n. You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process. Commission staff will prepare either an environmental assessment (EA) or an Environmental Impact Statement (EIS) that describes and evaluates the probable effects, if any, of the licensee’s proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commission’s scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. At this time, PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 6531 we do not anticipate holding on-site scoping meetings. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 (SD1), issued January 31, 2022. Copies of the SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866– 208–3676 or for TTY, (202) 502–8659. Dated: January 31, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–02372 Filed 2–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER22–922–000] United Energy Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of United Energy Partners, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 22, 2022. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the E:\FR\FM\04FEN1.SGM 04FEN1 6532 Federal Register / Vol. 87, No. 24 / Friday, February 4, 2022 / Notices FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: January 31, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–02385 Filed 2–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–1905–009. Applicants: AZ721 LLC. Description: Notice of Change in Status of Amazon Energy LLC. Filed Date: 1/28/22. Accession Number: 20220128–5432. Comment Date: 5 p.m. ET 2/18/22. Docket Numbers: ER17–215–001. Applicants: Midcontinent Independent System Operator, Inc., VerDate Sep<11>2014 18:50 Feb 03, 2022 Jkt 256001 Great River Energy, South Mississippi Electric Power Association. Description: Compliance filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35: 2022–01–31_ROE Compliance Filing to be effective 9/28/2016. Filed Date: 1/31/22. Accession Number: 20220131–5245. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER21–2581–002. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Compliance Filing In Response to Order Issued in ER21–2581 (COI/IPL) to be effective 10/1/2021. Filed Date: 1/31/22. Accession Number: 20220131–5286. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–924–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Transmission Systems, Incorporated submits tariff filing per 35.13(a)(2)(iii: ATSI submits four ECSAs, SA Nos. 6151, 6152, 6283 and 6284 to be effective 3/30/2022. Filed Date: 1/28/22. Accession Number: 20220128–5378. Comment Date: 5 p.m. ET 2/18/22. Docket Numbers: ER22–925–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Service Agreement Nos. 492 and 493 to be effective 1/1/2022. Filed Date: 1/28/22. Accession Number: 20220128–5387. Comment Date: 5 p.m. ET 2/18/22. Docket Numbers: ER22–926–000. Applicants: Flanders Energy LLC. Description: Notice of Cancellation of Market Based Rate Tariff of Flanders Energy LLC. Filed Date: 1/28/22. Accession Number: 20220128–5431. Comment Date: 5 p.m. ET 2/18/22. Docket Numbers: ER22–927–000. Applicants: ISO New England Inc., New England Power Company. Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: ISO–NE and NEP; Third Revised Service Agreement Nos. TSA–NEP–83 and TSA–NEP–86 to be effective 1/1/2022. Filed Date: 1/31/22. Accession Number: 20220131–5073. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–928–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Q4 2021 Quarterly Filing of City and PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 County of San Francisco’s WDT SA (SA 275) to be effective 12/31/2021. Filed Date: 1/31/22. Accession Number: 20220131–5120. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–929–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company, LLC, Consumers Energy Company. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2022–01–31_SA 1926 METC–CE 8th Rev DTIA to be effective 1/1/2022. Filed Date: 1/31/22. Accession Number: 20220131–5181. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–930–000. Applicants: American Transmission Systems, Incorporated, The Cleveland Electric Illuminating Company, Ohio Edison Company, Pennsylvania Power Company, The Toledo Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Transmission Systems, Incorporated submits tariff filing per 35.13(a)(2)(iii: FirstEnergy submits on behalf of ATSI et al. SA No. 2853 to be effective 4/2/2022. Filed Date: 1/31/22. Accession Number: 20220131–5202. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–931–000. Applicants: AV Solar Ranch 1, LLC. Description: § 205(d) Rate Filing: Notice of Change in Status, Revised MBR Tariffs and Request for Waiver to be effective 2/1/2022. Filed Date: 1/31/22. Accession Number: 20220131–5211. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–932–000. Applicants: Constellation Energy Commodities Group Maine, LLC. Description: § 205(d) Rate Filing: Notice of Change in Status, Revised MBR Tariffs and Request for Waiver to be effective 2/1/2022. Filed Date: 1/31/22. Accession Number: 20220131–5215. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–933–000. Applicants: Constellation NewEnergy, Inc. Description: § 205(d) Rate Filing: Notice of Change in Status, Revised MBR Tariffs and Request for Waiver to be effective 2/1/2022. Filed Date: 1/31/22. Accession Number: 20220131–5216. Comment Date: 5 p.m. ET 2/22/22. Docket Numbers: ER22–934–000. Applicants: Exelon Generation Company, LLC. E:\FR\FM\04FEN1.SGM 04FEN1

Agencies

[Federal Register Volume 87, Number 24 (Friday, February 4, 2022)]
[Notices]
[Pages 6531-6532]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02385]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER22-922-000]


United Energy Partners, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
United Energy Partners, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is February 22, 2022.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the

[[Page 6532]]

FERC Online links at https://www.ferc.gov. To facilitate electronic 
service, persons with internet access who will eFile a document and/or 
be listed as a contact for an intervenor must create and validate an 
eRegistration account using the eRegistration link. Select the eFiling 
link to log on and submit the intervention or protests.
    Persons unable to file electronically may mail similar pleadings to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Hand delivered submissions in docketed 
proceedings should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.

    Dated: January 31, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-02385 Filed 2-3-22; 8:45 am]
BILLING CODE 6717-01-P