Federal Register / Vol. 87, No. 23 / Thursday, February 3, 2022 / Notices
to file protests, motions to intervene,
and comments is explained below.
khammond on DSKJM1Z7X2PROD with NOTICES
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is March 29,
2022. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is March 29, 2022.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
2 18
CFR 157.205.
3 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
5 18 CFR 385.214.
6 18 CFR 157.10.
VerDate Sep<11>2014
18:08 Feb 02, 2022
Jkt 256001
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before March 29,
2022. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How to File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP22–40–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP22–40–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
6163
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Jeffrey R. Tietbohl, Vice
President, Eastern Shore Natural Gas
Company, 500 Energy Lane, Suite 200
Dover, Delaware 19901 at (302)-363–
4679 or email at jtietbohl@esng.com or
pipelines@chpk.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: January 28, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–02218 Filed 2–2–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–41–000]
Cameron LNG, LLC; Notice of
Application for Amendment and
Establishing Intervention Deadline
Take notice that on January 18, 2021,
Cameron LNG, LLC (Cameron LNG),
E:\FR\FM\03FEN1.SGM
03FEN1
khammond on DSKJM1Z7X2PROD with NOTICES
6164
Federal Register / Vol. 87, No. 23 / Thursday, February 3, 2022 / Notices
2925 Briarpark Drive, Suite 1000,
Houston, Texas 77042, filed an
application under section 3(a) of the
Natural Gas Act (NGA) requesting an
amendment to its May 5, 2016 Order 1
(2016 Order) to site, construct, and
operate facilities to provide additional
natural gas processing, storage, and
liquefaction capacity at the existing site
of the Cameron LNG liquefied natural
gas terminal located in Cameron and
Calcasieu Parishes, Louisiana (Amended
Expansion Project). The proposed
enhancements will reduce greenhouse
gas (GHG) emissions from Train 4, will
allow to access carbon capture and
sequestration (CCS) facilities that may
be developed in the region in the future,
and will enhance the production
capacity of Train 4.
Cameron LNG also proposes a partial
vacatur of the 2016 Order to exclude the
construction and operation of Train 5
and a fifth LNG storage tank.2 With the
removal of Train 5, the overall
maximum production capacity of the
Amended Expansion Project will be
reduced from 9.97 MTPA to 6.75 MTPA,
sourced exclusively from Train 4. The
resultant total output capacity of the
Cameron LNG terminal would be
reduced from 24.95 MTPA (in service
Trains 1–3 and Trains 4 & 5 which are
approved but not in-service) to 21.7
MTPA (in service Trains 1–3 and
enhanced Train 4).
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Blair
1 Cameron
LNG, LLC, 155 FERC ¶ 61,141 (2016).
2016 Order authorized Cameron LNG to
construct and operate two additional liquefaction
trains (Trains 4 and 5) and one additional storage
tank that would increase the Cameron LNG
Terminal’s maximum natural gas liquefaction
capacity by 9.97 million tonnes per annum (MTPA)
referred to as the Expansion Project.
2 The
VerDate Sep<11>2014
18:08 Feb 02, 2022
Jkt 256001
Woodward, General Counsel, Cameron
LNG, LLC, 2925 Briarpark Drive, Suite
1000 Houston, TX 77042, (832) 783–
5582, bwoodward@cameronlng.com; or
Brett A. Snyder or Lamiya Rahman,
1825 Eye Street NW, Washington, DC
20006, (202) 420–2200, brett.snyder@
blankrome.com or lamiya.rahman@
blankrome.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,3 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: You can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on February 18, 2022.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before February 18, 2021.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP22–41–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
3 18
PO 00000
CFR (Code of Federal Regulations) § 157.9.
Frm 00034
Fmt 4703
Sfmt 4703
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address below. Your written
comments must reference the Project
docket number (CP22–41–000).
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
nvironmental documents (EA or EIS) are
issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,4 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
4 18
E:\FR\FM\03FEN1.SGM
CFR 385.102(d).
03FEN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 23 / Thursday, February 3, 2022 / Notices
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is February 18,
2022. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP22–41–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below . Your motion to
intervene must reference the Project
docket number CP22–41–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
5 18
6 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
19:04 Feb 02, 2022
Jkt 256001
Motions to intervene must be served
on the applicant either by mail or email
at: Cameron LNG, LLC, 2925 Briarpark
Drive, Suite 1000, Houston, TX 77042,
or at bwoodward@cameronlng.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on February 18, 2022.
Dated: January 28, 2022.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–463–000]
Texas Eastern Transmission, LP
Notice of Schedule for the Preparation
of an Environmental Assessment for
the Holbrook Compressor Units
Replacement Project
On June 17, 2021, Texas Eastern
Transmission, LP (Texas Eastern) filed
an application in Docket No. CP21–463–
000 requesting authorization and a
Certificate of Public Convenience and
Necessity pursuant to Sections 7(b) and
7(c) of the Natural Gas Act to abandon
certain natural gas facilities, and
construct, operate, and maintain certain
natural gas facilities. The proposed
project is known as the Holbrook
Compressor Station Replacement Project
(Project). Texas Eastern is requesting
authorization to abandon twelve
existing reciprocating compressor units
installed in the 1950s at its Holbrook
Compressor Station in Greene County,
Pennsylvania, and replace them with
two new, more efficient gas turbines.
On July 2, 2021, the Federal Energy
Regulatory Commission (FERC or
Commission) issued its Notice of
Application for the Project. Among
other things, that notice alerted other
agencies issuing federal authorizations
of the requirement to complete all
necessary reviews and to reach a final
decision on the request for a federal
authorization within 90 days of the date
of issuance of the Commission staff’s
environmental document for the Project.
This notice identifies the Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA—May 12, 2022
90-day Federal Authorization Decision
Deadline 2—August 10, 2022
If a schedule change becomes
necessary for the EA, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
1 40
[FR Doc. 2022–02214 Filed 2–2–22; 8:45 am]
6165
CFR 1501.10 (2020)
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
2 The
E:\FR\FM\03FEN1.SGM
03FEN1
Agencies
[Federal Register Volume 87, Number 23 (Thursday, February 3, 2022)]
[Notices]
[Pages 6163-6165]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02214]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-41-000]
Cameron LNG, LLC; Notice of Application for Amendment and
Establishing Intervention Deadline
Take notice that on January 18, 2021, Cameron LNG, LLC (Cameron
LNG),
[[Page 6164]]
2925 Briarpark Drive, Suite 1000, Houston, Texas 77042, filed an
application under section 3(a) of the Natural Gas Act (NGA) requesting
an amendment to its May 5, 2016 Order \1\ (2016 Order) to site,
construct, and operate facilities to provide additional natural gas
processing, storage, and liquefaction capacity at the existing site of
the Cameron LNG liquefied natural gas terminal located in Cameron and
Calcasieu Parishes, Louisiana (Amended Expansion Project). The proposed
enhancements will reduce greenhouse gas (GHG) emissions from Train 4,
will allow to access carbon capture and sequestration (CCS) facilities
that may be developed in the region in the future, and will enhance the
production capacity of Train 4.
---------------------------------------------------------------------------
\1\ Cameron LNG, LLC, 155 FERC ] 61,141 (2016).
---------------------------------------------------------------------------
Cameron LNG also proposes a partial vacatur of the 2016 Order to
exclude the construction and operation of Train 5 and a fifth LNG
storage tank.\2\ With the removal of Train 5, the overall maximum
production capacity of the Amended Expansion Project will be reduced
from 9.97 MTPA to 6.75 MTPA, sourced exclusively from Train 4. The
resultant total output capacity of the Cameron LNG terminal would be
reduced from 24.95 MTPA (in service Trains 1-3 and Trains 4 & 5 which
are approved but not in-service) to 21.7 MTPA (in service Trains 1-3
and enhanced Train 4).
---------------------------------------------------------------------------
\2\ The 2016 Order authorized Cameron LNG to construct and
operate two additional liquefaction trains (Trains 4 and 5) and one
additional storage tank that would increase the Cameron LNG
Terminal's maximum natural gas liquefaction capacity by 9.97 million
tonnes per annum (MTPA) referred to as the Expansion Project.
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed project should be directed to
Blair Woodward, General Counsel, Cameron LNG, LLC, 2925 Briarpark
Drive, Suite 1000 Houston, TX 77042, (832) 783-5582,
[email protected]; or Brett A. Snyder or Lamiya Rahman, 1825 Eye
Street NW, Washington, DC 20006, (202) 420-2200,
[email protected] or [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\3\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\3\ 18 CFR (Code of Federal Regulations) Sec. 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on February 18, 2022.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before February 18, 2021.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP22-41-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below. Your written comments must reference the
Project docket number (CP22-41-000).
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the nvironmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\4\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently
[[Page 6165]]
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
---------------------------------------------------------------------------
\4\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is February 18, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. [For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene.] For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP22-41-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below . Your
motion to intervene must reference the Project docket number CP22-41-
000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: Cameron LNG, LLC, 2925 Briarpark Drive, Suite 1000,
Houston, TX 77042, or at [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Service can be via email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on February 18, 2022.
Dated: January 28, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-02214 Filed 2-2-22; 8:45 am]
BILLING CODE 6717-01-P