ATTACHMENT 2—TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION AND SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
Filing of answers + 30 ........
Event/activity
Decision on contention admissibility.
in the FOR FURTHER INFORMATION
CONTACT section of this document.
[FR Doc. 2022–01983 Filed 2–1–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc.; Vogtle Electric Generating Plant,
Units 3 and 4 Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 are
effective on the dates indicated in the
NRC staff’s verification evaluation forms
for the inspections, tests, analyses, and
acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
jspears on DSK121TN23PROD with NOTICES1
SUMMARY:
33 The completion time for access determinations
may vary based on the information revealed during
the background check (including a criminal history
records check), and because some portion of the
background check is usually conducted by agencies
other than the NRC, the processing time may vary
and is difficult to predict with any certainty.
However, the NRC staff will make its utmost efforts
to complete all activities associated with requests
for access to SGI as soon as possible.
VerDate Sep<11>2014
21:31 Feb 01, 2022
Jkt 256001
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced in this document (if that
document is available in ADAMS) is
provided the first time that a document
is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8:00 a.m. and 4:00 p.m.
(ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7270, email: Cayetano.Santos@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. Georgia Power Company,
Oglethorpe Power Corporation, MEAG
Power SPVM, LLC., MEAG Power SPVJ,
LLC., MEAG Power SPVP, LLC., and the
City of Dalton, Georgia, (hereafter called
SNC or the licensee) has submitted
ITAAC closure notifications (ICNs)
under section 52.99(c)(1) of title 10 of
the Code of Federal Regulations (10
CFR), informing the NRC that the
licensee has successfully performed the
required inspections, tests, and
analyses, and that the acceptance
criteria are met for:
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
VEGP Unit 3 ITAAC
2.1.01.04 (4), 2.1.02.08b (30),
2.1.02.09a (41), 2.1.02.09b.ii (43),,
2.1.02.11a.ii (47), 2.1.02.12a.iv (56),
2.1.02.15 (67), 2.1.03.07.i (78),
2.2.01.02a (91), 2.2.01.07.ii (108),
2.2.01.08 (109), 2.2.01.11a.iii (116),
2.2.01.11b (118), 2.2.02.01 (119),
2.2.02.02a (120), 2.2.02.11a.i (154),
2.2.03.01 (158), 2.2.03.08b.01 (175),
2.2.03.08c.vii (192), 2.2.03.08c.viii
(193), 2.2.03.08c.ix (194), 2.2.03.12a.i
(214), 2.2.04.02a (220), 2.2.04.12a.i
(248), 2.3.02.02a (285), 2.3.02.05.i (291),
2.3.03.03c (322), 2.3.03.04 (324),
2.3.06.05a.i (361), 2.3.06.09b.ii (375),
2.3.07.02a (392), 2.3.07.07c (408),
2.3.10.05a.i (437), 2.3.13.02 (459),
2.3.13.05.i (462), 2.5.01.03e (515),
2.5.05.02.i (565), 2.5.05.03b (570),
2.5.05.04 (572), 2.6.06.01.i (637),
2.6.09.05a (644), C.2.6.09.03a (660),
C.2.6.09.03b (661), C.2.6.09.09 (670),
2.7.04.03 (716), 3.3.00.01 (759),
3.3.00.02a.i.c (762), 3.3.00.02a.i.d (763),
3.3.00.07d.iv.a (806), 3.3.00.07d.iv.b
(807), 3.3.00.07d.iv.c (808),
3.3.00.07d.v.a (809), 3.3.00.07d.v.b
(810), 3.3.00.07d.v.c (811), 3.3.00.10.i
(815), 3.3.00.10.ii (816), and
E.3.9.06.00.04 (862).
VEGP Unit 4 ITAAC
2.2.03.08c.xii (197), 2.5.05.02.i (565)
and 2.5.05.03b (570).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure
Notifications (IPCNs)
SNC has submitted an ITAAC IPCN
under 10 CFR 52.99(c)(2), informing the
NRC of new information that materially
alters the basis for determining either
that inspections, tests, or analyses was
performed as required, or that
acceptance criteria is met for:
VEGP Unit 3 ITAAC
2.5.02.07a (534).
VEGP Unit 4 ITAAC
Since the last Federal Register notice
of the NRC staff’s determinations of
successful completion of inspections,
tests, and analyses (86 FR 50381;
E:\FR\FM\02FEN1.SGM
02FEN1
Federal Register / Vol. 87, No. 22 / Wednesday, February 2, 2022 / Notices
jspears on DSK121TN23PROD with NOTICES1
September 8, 2021), the NRC staff has
not made additional determinations of
the successful completion of
inspections, tests, and analyses based on
licensee IPCNs submitted under 10 CFR
52.99(c)(2).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) Each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new, material information giving
rise to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
VerDate Sep<11>2014
21:31 Feb 01, 2022
Jkt 256001
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC can be found by
selecting the link ‘‘ITAAC Status
Report’’ on the NRC’s websites: https://
www.nrc.gov/reactors/new-reactors/colholder/vog3.html and https://
www.nrc.gov/reactors/new-reactors/colholder/vog4.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS accession
number for each ICN received, the
ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog4.html.
Dated: January 27, 2022.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear
Reactor Regulation.
[FR Doc. 2022–02062 Filed 2–1–22; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–219; License No. DPR–16;
EA–21–041; NRC–2022–0034]
In the Matter of Holtec
Decommissioning International, LLC;
Oyster Creek Nuclear Generating
Station
Nuclear Regulatory
Commission.
ACTION: Confirmatory order; issuance.
AGENCY:
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
5867
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a
Confirmatory Order to Holtec
Decommissioning International, LLC
(HDI) to memorialize the agreement
reached during an alternative dispute
resolution mediation session held on
October 14, 2021. This Order will
resolve any issues identified during an
NRC inspection and investigation
related to a (now-former) training
superintendent at Oyster Creek Nuclear
Generating Station (Oyster Creek), who
was also responsible for performing
armorer duties, and who deliberately
failed to perform firearms maintenance
activities and falsified records related to
those activities. The Order includes a
number of significant actions HDI has
agreed to take that are expected to
improve HDI’s security performance at
Oyster Creek and other sites in its fleet.
The Confirmatory Order is effective
upon issuance.
DATES: The confirmatory order was
issued on January 26, 2022.
ADDRESSES: Please refer to Docket ID
NRC–2022–0034 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0034. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. The
Confirmatory Order to Oyster Creek
Nuclear Generating Station is available
in ADAMS under Accession No.
ML21362A447.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
SUMMARY:
E:\FR\FM\02FEN1.SGM
02FEN1
Agencies
[Federal Register Volume 87, Number 22 (Wednesday, February 2, 2022)]
[Notices]
[Pages 5866-5867]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02062]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
inspections, tests, analyses, and acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between
8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. Georgia Power Company,
Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG Power SPVJ,
LLC., MEAG Power SPVP, LLC., and the City of Dalton, Georgia,
(hereafter called SNC or the licensee) has submitted ITAAC closure
notifications (ICNs) under section 52.99(c)(1) of title 10 of the Code
of Federal Regulations (10 CFR), informing the NRC that the licensee
has successfully performed the required inspections, tests, and
analyses, and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.01.04 (4), 2.1.02.08b (30), 2.1.02.09a (41), 2.1.02.09b.ii
(43),, 2.1.02.11a.ii (47), 2.1.02.12a.iv (56), 2.1.02.15 (67),
2.1.03.07.i (78), 2.2.01.02a (91), 2.2.01.07.ii (108), 2.2.01.08 (109),
2.2.01.11a.iii (116), 2.2.01.11b (118), 2.2.02.01 (119), 2.2.02.02a
(120), 2.2.02.11a.i (154), 2.2.03.01 (158), 2.2.03.08b.01 (175),
2.2.03.08c.vii (192), 2.2.03.08c.viii (193), 2.2.03.08c.ix (194),
2.2.03.12a.i (214), 2.2.04.02a (220), 2.2.04.12a.i (248), 2.3.02.02a
(285), 2.3.02.05.i (291), 2.3.03.03c (322), 2.3.03.04 (324),
2.3.06.05a.i (361), 2.3.06.09b.ii (375), 2.3.07.02a (392), 2.3.07.07c
(408), 2.3.10.05a.i (437), 2.3.13.02 (459), 2.3.13.05.i (462),
2.5.01.03e (515), 2.5.05.02.i (565), 2.5.05.03b (570), 2.5.05.04 (572),
2.6.06.01.i (637), 2.6.09.05a (644), C.2.6.09.03a (660), C.2.6.09.03b
(661), C.2.6.09.09 (670), 2.7.04.03 (716), 3.3.00.01 (759),
3.3.00.02a.i.c (762), 3.3.00.02a.i.d (763), 3.3.00.07d.iv.a (806),
3.3.00.07d.iv.b (807), 3.3.00.07d.iv.c (808), 3.3.00.07d.v.a (809),
3.3.00.07d.v.b (810), 3.3.00.07d.v.c (811), 3.3.00.10.i (815),
3.3.00.10.ii (816), and E.3.9.06.00.04 (862).
VEGP Unit 4 ITAAC
2.2.03.08c.xii (197), 2.5.05.02.i (565) and 2.5.05.03b (570).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
SNC has submitted an ITAAC IPCN under 10 CFR 52.99(c)(2), informing
the NRC of new information that materially alters the basis for
determining either that inspections, tests, or analyses was performed
as required, or that acceptance criteria is met for:
VEGP Unit 3 ITAAC
2.5.02.07a (534).
VEGP Unit 4 ITAAC
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses (86 FR 50381;
[[Page 5867]]
September 8, 2021), the NRC staff has not made additional
determinations of the successful completion of inspections, tests, and
analyses based on licensee IPCNs submitted under 10 CFR 52.99(c)(2).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new, material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC can be found by selecting the link
``ITAAC Status Report'' on the NRC's websites: https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html and https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS accession number for each ICN
received, the ADAMS accession number for each VEF, and the ADAMS
accession numbers for the inspection reports associated with these
specific ITAAC can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
Dated: January 27, 2022.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation.
[FR Doc. 2022-02062 Filed 2-1-22; 8:45 am]
BILLING CODE 7590-01-P