National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 4575-4576 [2022-01681]
Download as PDF
Federal Register / Vol. 87, No. 19 / Friday, January 28, 2022 / Notices
EXEMPTIONS PROMULGATED FOR THE SYSTEM:
Federal Energy Regulatory
Commission
HISTORY:
June 06, 2016, 81 FR 36279; October
27, 2015, 80 FR 65722.
[FR Doc. 2022–01780 Filed 1–27–22; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3472–024]
Aspinook Hydro, LLC; Notice of Waiver
Period for Water Quality Certification
Application
On December 3, 2021, Aspinook
Hydro, LLC. submitted to the Federal
Energy Regulatory Commission
(Commission) evidence of its
application for a Clean Water Act
section 401(a)(1) water quality
certification filed with Connecticut
Department of Energy and
Environmental Protection (Connecticut
DEEP), in conjunction with the above
captioned project. Pursuant to section
401 of the Clean Water Act 1 and section
4.34(b)(5), 5.23(b), 153.4, or 157.22 of
the Commission’s regulations,2 a state
certifying agency is deemed to have
waived its certifying authority if it fails
or refuses to act on a certification
request within a reasonable period of
time, which is one year after the date
the certification request was received.
Accordingly, we hereby notify the
Connecticut DEEP of the following:
Date that Connecticut DEEP Received
the Certification Request: December 3,
2021.
If Connecticut DEEP fails or refuses to
act on the water quality certification
request on or before December 3, 2022,
then the agency certifying authority is
deemed waived pursuant to section
401(a)(1) of the Clean Water Act, 33
U.S.C. 1341(a)(1).
jspears on DSK121TN23PROD with NOTICES1
Dated: January 24, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01753 Filed 1–27–22; 8:45 am]
BILLING CODE 6717–01–P
1
2
33 U.S.C. 1341(a)(1).
18 CFR 4.34(b)(5)/5.23(b)/153.4/157.22.
VerDate Sep<11>2014
Public Participation
DEPARTMENT OF ENERGY
None.
18:03 Jan 27, 2022
Jkt 256001
[Docket No. CP22–39–000]
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on January 11, 2022,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Northern’s
blanket certificate issued in Docket No.
CP83–4–000, for authorization to
abandon four storage wells and
associated well lines in its Boone
Mountain Storage Field located in
Horton Township, Elk County,
Pennsylvania. National Fuel proposes to
plug and abandon four (4) injection/
withdrawal storage Wells 4759, 4762,
4765, and 4820, and abandon in place
the associated Well Lines FW4759,
FW4762S, FW4765, FW4763, and
FW4820S. National Fuel states that
there will be no abandonment or
decrease in service to customers as a
result of the proposed abandonment, all
as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
Alice A. Curtiss, Deputy General
Counsel for National Fuel, 6363 Main
Street, Williamsville, New York 14221,
at 716–857–7075, or by email to
curtissa@natfuel.com.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
4575
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on March 22, 2022. How
to file protests, motions to intervene,
and comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is March 22,
2022. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is March 22, 2022.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
E:\FR\FM\28JAN1.SGM
28JAN1
4576
Federal Register / Vol. 87, No. 19 / Friday, January 28, 2022 / Notices
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
(2) You can file a paper copy of your
submission by mailing it to the address
below.7 Your submission must reference
the Project docket number CP22–39–
000.
DEPARTMENT OF ENERGY
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
Long Ridge Retail Electric Supplier
LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
Comments
Tracking the Proceeding
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before March 22,
2022. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
jspears on DSK121TN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP22–39–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
6 Additionally,
you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
VerDate Sep<11>2014
18:03 Jan 27, 2022
Jkt 256001
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: 6363 Main Street,
Williamsville, New York 14221, or by
email to (with a link to the document)
at: curtissa@natfuel.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: January 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01681 Filed 1–27–22; 8:45 am]
BILLING CODE 6717–01–P
interested persons to submit brief, text-only
comments on a project.
7 Hand-delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. ER22–867–000]
This is a supplemental notice in the
above-referenced proceeding of Long
Ridge Retail Electric Supplier LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 14,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
E:\FR\FM\28JAN1.SGM
28JAN1
Agencies
[Federal Register Volume 87, Number 19 (Friday, January 28, 2022)]
[Notices]
[Pages 4575-4576]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01681]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-39-000]
National Fuel Gas Supply Corporation; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on January 11, 2022, National Fuel Gas Supply
Corporation (National Fuel), 6363 Main Street, Williamsville, New York
14221, filed in the above referenced docket, a prior notice request
pursuant to sections 157.205 and 157.216 of the Commission's
regulations under the Natural Gas Act (NGA) and Northern's blanket
certificate issued in Docket No. CP83-4-000, for authorization to
abandon four storage wells and associated well lines in its Boone
Mountain Storage Field located in Horton Township, Elk County,
Pennsylvania. National Fuel proposes to plug and abandon four (4)
injection/withdrawal storage Wells 4759, 4762, 4765, and 4820, and
abandon in place the associated Well Lines FW4759, FW4762S, FW4765,
FW4763, and FW4820S. National Fuel states that there will be no
abandonment or decrease in service to customers as a result of the
proposed abandonment, all as more fully set forth in the application,
which is on file with the Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Alice A. Curtiss, Deputy General Counsel for National Fuel,
6363 Main Street, Williamsville, New York 14221, at 716-857-7075, or by
email to [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on March 22, 2022.
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is March 22, 2022. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is March 22, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding
[[Page 4576]]
the proceeding, as well as your interest in the proceeding. For an
individual, this could include your status as a landowner, ratepayer,
resident of an impacted community, or recreationist. You do not need to
have property directly impacted by the project in order to intervene.
For more information about motions to intervene, refer to the FERC
website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before March 22, 2022. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP22-39-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below.\7\ Your submission must reference the Project docket
number CP22-39-000.
---------------------------------------------------------------------------
\7\ Hand-delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail at: 6363 Main Street, Williamsville, New York 14221, or
by email to (with a link to the document) at: [email protected]. Any
subsequent submissions by an intervenor must be served on the applicant
and all other parties to the proceeding. Contact information for
parties can be downloaded from the service list at the eService link on
FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: January 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01681 Filed 1-27-22; 8:45 am]
BILLING CODE 6717-01-P