Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: March 4, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Luray and Newport Project (P–2425–
057).
m. The application is not ready for
environmental analysis at this time.
n. The Luray Development consists of:
(1) A 21.9-foot-high, 525-foot-long
reinforced concrete dam impounding a
small reservoir with a gross storage
capacity of 880 acre-feet; (2) a
powerhouse adjacent to the south end of
the dam, with three generating units
having a total installed capacity of 1,600
kilowatts (kW); (3) transmission
VerDate Sep<11>2014
18:10 Jan 24, 2022
Jkt 256001
3797
facilities consisting of the 2.4-kilovolt
(kV) project generator leads; a 3-phase,
2.4/34.5-kV transformer; and a 34.5-kV,
8,131-foot-long transmission line; and
(4) other appurtenances.
The Newport Development consists
of: (1) A 28.8-foot-high, 443-foot-long
reinforced concrete dam impounding a
small reservoir with a gross storage
capacity of 1,090 acre-feet; (2) a
powerhouse adjacent to the north end of
the dam, with three generating units
having a total installed capacity of 1,400
kW; (3) transmission facilities consisting
of the 2.4-kV project generator leads; a
3-phase, 2.4/34.5-kV transformer; and a
34.5-kV, 8,131-foot-long transmission
line; and (4) other appurtenances.
The project operates in a run-of-river
mode with minimum flows of 47 cubic
feet per second (cfs) and 40 cfs, at the
Luray and Newport Developments,
respectively. The project had an average
annual generation of 10,928 megawatthours between 2011 and 2016.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–2425). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
Issue Deficiency Letter (if
necessary).
Request Additional Information (if necessary).
Issue Acceptance Letter
Issue Scoping Document
1 for comments.
Issue Scoping Document
2 (if necessary).
Issue Notice of Ready for
Environmental Analysis.
Docket Numbers: RP22–417–001.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Tariff Amendment: TGP
PCG Pooling Amendment to be effective
3/1/22.
Filed Date: 1/4/22.
Accession Number: 20220104–5001.
Comment Date: 5 p.m. ET 1/18/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
March 2022.
March 2022.
May 2022.
June 2022.
August 2022.
August 2022.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
[FR Doc. 2022–01323 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Part 284 Natural
Gas Pipeline Rate filings:
Filings Instituting Proceedings
Docket Number: PR22–16–000.
Applicants: Bay Gas Storage
Company, LLC.
Description: § 284.123(g) Rate Filing:
Bay Gas Storage Housekeeping Changes
to SOC to be effective 12/31/2021.
Filed Date: 12/30/21.
Accession Number: 20211230–5207.
Comments Due: 5 p.m. ET 1/20/2022.
284.123(g) Protests Due: 5 p.m. ET 2/
28/2022.
Docket Number: PR22–17–000.
Applicants: Louisville Gas and
Electric Company.
Description: Submits tariff filing per
284.123(b),(e)/: Operating Statement
Rate Change to be effective 12/6/2021.
Filed Date: 1/3/22.
Accession Number: 20220103–5203.
Comments/Protests Due: 5 p.m. ET 1/
24/2022.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
E:\FR\FM\25JAN1.SGM
25JAN1
3798
Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 4, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–01316 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2391–053]
khammond on DSKJM1Z7X2PROD with NOTICES
PE Hydro Generation, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2391–053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Warren
Hydroelectric Project (P–2391–053).
f. Location: The Warren Project is
located on the Shenandoah River near
the Town of Front Royal in Warren
County, Virginia. The project does not
occupy any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (240) 482–2700 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Jody Callihan at
(202) 502–8278, or jody.callihan@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
VerDate Sep<11>2014
17:19 Jan 24, 2022
Jkt 256001
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: March 4, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Warren Project (P–2391–053).
m. The application is not ready for
environmental analysis at this time.
n. The Warren Project consists of the
following existing facilities: (1) A 15foot-high, 483-foot-long reinforced
concrete dam impounding a small
reservoir with a gross storage capacity of
900 acre-feet; (2) an 82-foot-long, 30foot-wide powerhouse adjacent to the
north end of the dam containing three
generating units with a total installed
capacity of 750 kilowatts; (3)
transmission facilities consisting of the
2.4-kilovolt (kV) project generator leads;
a 3-phase, 2.4/34.5-kV transformer; and
a 34.5-kV, 14,784-foot-long transmission
line; and (4) other appurtenances.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
The project operates in a run-of-river
mode with a minimum flow of 56 cubic
feet per second. The project had an
average annual generation of 3,456
megawatt-hours between 2013 and
2017.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–2391). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if
necessary).
Request Additional Information (if necessary).
Issue Acceptance Letter
Issue Scoping Document
1 for comments.
Issue Scoping Document
2 (if necessary).
Issue Notice of Ready for
Environmental Analysis.
March 2022.
March 2022.
May 2022.
June 2022.
August 2022.
August 2022.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01318 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2509–051]
PE Hydro Generation, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 87, Number 16 (Tuesday, January 25, 2022)]
[Notices]
[Pages 3797-3798]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01316]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Part 284
Natural Gas Pipeline Rate filings:
Filings Instituting Proceedings
Docket Number: PR22-16-000.
Applicants: Bay Gas Storage Company, LLC.
Description: Sec. 284.123(g) Rate Filing: Bay Gas Storage
Housekeeping Changes to SOC to be effective 12/31/2021.
Filed Date: 12/30/21.
Accession Number: 20211230-5207.
Comments Due: 5 p.m. ET 1/20/2022.
284.123(g) Protests Due: 5 p.m. ET 2/28/2022.
Docket Number: PR22-17-000.
Applicants: Louisville Gas and Electric Company.
Description: Submits tariff filing per 284.123(b),(e)/: Operating
Statement Rate Change to be effective 12/6/2021.
Filed Date: 1/3/22.
Accession Number: 20220103-5203.
Comments/Protests Due: 5 p.m. ET 1/24/2022.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22-417-001.
Applicants: Tennessee Gas Pipeline Company, L.L.C.
Description: Tariff Amendment: TGP PCG Pooling Amendment to be
effective 3/1/22.
Filed Date: 1/4/22.
Accession Number: 20220104-5001.
Comment Date: 5 p.m. ET 1/18/22.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://
[[Page 3798]]
elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 4, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.