Combined Notice of Filings, 3797-3798 [2022-01316]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: March 4, 2022. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Luray and Newport Project (P–2425– 057). m. The application is not ready for environmental analysis at this time. n. The Luray Development consists of: (1) A 21.9-foot-high, 525-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 880 acre-feet; (2) a powerhouse adjacent to the south end of the dam, with three generating units having a total installed capacity of 1,600 kilowatts (kW); (3) transmission VerDate Sep<11>2014 18:10 Jan 24, 2022 Jkt 256001 3797 facilities consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4) other appurtenances. The Newport Development consists of: (1) A 28.8-foot-high, 443-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 1,090 acre-feet; (2) a powerhouse adjacent to the north end of the dam, with three generating units having a total installed capacity of 1,400 kW; (3) transmission facilities consisting of the 2.4-kV project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4) other appurtenances. The project operates in a run-of-river mode with minimum flows of 47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport Developments, respectively. The project had an average annual generation of 10,928 megawatthours between 2011 and 2016. o. Copies of the application may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document (P–2425). For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Dated: January 18, 2022. Kimberly D. Bose, Secretary. Issue Deficiency Letter (if necessary). Request Additional Information (if necessary). Issue Acceptance Letter Issue Scoping Document 1 for comments. Issue Scoping Document 2 (if necessary). Issue Notice of Ready for Environmental Analysis. Docket Numbers: RP22–417–001. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: Tariff Amendment: TGP PCG Pooling Amendment to be effective 3/1/22. Filed Date: 1/4/22. Accession Number: 20220104–5001. Comment Date: 5 p.m. ET 1/18/22. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// March 2022. March 2022. May 2022. June 2022. August 2022. August 2022. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 [FR Doc. 2022–01323 Filed 1–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Part 284 Natural Gas Pipeline Rate filings: Filings Instituting Proceedings Docket Number: PR22–16–000. Applicants: Bay Gas Storage Company, LLC. Description: § 284.123(g) Rate Filing: Bay Gas Storage Housekeeping Changes to SOC to be effective 12/31/2021. Filed Date: 12/30/21. Accession Number: 20211230–5207. Comments Due: 5 p.m. ET 1/20/2022. 284.123(g) Protests Due: 5 p.m. ET 2/ 28/2022. Docket Number: PR22–17–000. Applicants: Louisville Gas and Electric Company. Description: Submits tariff filing per 284.123(b),(e)/: Operating Statement Rate Change to be effective 12/6/2021. Filed Date: 1/3/22. Accession Number: 20220103–5203. Comments/Protests Due: 5 p.m. ET 1/ 24/2022. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings E:\FR\FM\25JAN1.SGM 25JAN1 3798 Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 4, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–01316 Filed 1–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2391–053] khammond on DSKJM1Z7X2PROD with NOTICES PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 2391–053. c. Date filed: January 3, 2022. d. Applicant: PE Hydro Generation, LLC. e. Name of Project: Warren Hydroelectric Project (P–2391–053). f. Location: The Warren Project is located on the Shenandoah River near the Town of Front Royal in Warren County, Virginia. The project does not occupy any federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, Bethesda, MD 20814; Phone at (240) 482–2700 or email at jody.smet@eaglecreekre.com. i. FERC Contact: Jody Callihan at (202) 502–8278, or jody.callihan@ ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests VerDate Sep<11>2014 17:19 Jan 24, 2022 Jkt 256001 described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: March 4, 2022. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Warren Project (P–2391–053). m. The application is not ready for environmental analysis at this time. n. The Warren Project consists of the following existing facilities: (1) A 15foot-high, 483-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 900 acre-feet; (2) an 82-foot-long, 30foot-wide powerhouse adjacent to the north end of the dam containing three generating units with a total installed capacity of 750 kilowatts; (3) transmission facilities consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 14,784-foot-long transmission line; and (4) other appurtenances. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 The project operates in a run-of-river mode with a minimum flow of 56 cubic feet per second. The project had an average annual generation of 3,456 megawatt-hours between 2013 and 2017. o. Copies of the application may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document (P–2391). For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary). Request Additional Information (if necessary). Issue Acceptance Letter Issue Scoping Document 1 for comments. Issue Scoping Document 2 (if necessary). Issue Notice of Ready for Environmental Analysis. March 2022. March 2022. May 2022. June 2022. August 2022. August 2022. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: January 18, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01318 Filed 1–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2509–051] PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed E:\FR\FM\25JAN1.SGM 25JAN1

Agencies

[Federal Register Volume 87, Number 16 (Tuesday, January 25, 2022)]
[Notices]
[Pages 3797-3798]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01316]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Part 284 
Natural Gas Pipeline Rate filings:

Filings Instituting Proceedings

    Docket Number: PR22-16-000.
    Applicants: Bay Gas Storage Company, LLC.
    Description: Sec.  284.123(g) Rate Filing: Bay Gas Storage 
Housekeeping Changes to SOC to be effective 12/31/2021.
    Filed Date: 12/30/21.
    Accession Number: 20211230-5207.
    Comments Due: 5 p.m. ET 1/20/2022.
    284.123(g) Protests Due: 5 p.m. ET 2/28/2022.

    Docket Number: PR22-17-000.
    Applicants: Louisville Gas and Electric Company.
    Description: Submits tariff filing per 284.123(b),(e)/: Operating 
Statement Rate Change to be effective 12/6/2021.
    Filed Date: 1/3/22.
    Accession Number: 20220103-5203.
    Comments/Protests Due: 5 p.m. ET 1/24/2022.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP22-417-001.
    Applicants: Tennessee Gas Pipeline Company, L.L.C.
    Description: Tariff Amendment: TGP PCG Pooling Amendment to be 
effective 3/1/22.
    Filed Date: 1/4/22.
    Accession Number: 20220104-5001.
    Comment Date: 5 p.m. ET 1/18/22.

    Any person desiring to protest in any the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system 
(https://

[[Page 3798]]

elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying the 
docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 4, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-01316 Filed 1-24-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.