a. Type of Application: New Major
License.
b. Project No.: 2336–101.
c. Date Filed: January 3, 2022.
d. Applicant: Georgia Power Company
(Georgia Power).
e. Name of Project: Lloyd Shoals
Hydroelectric Project (Lloyd Shoals
Project.)
f. Location: The Lloyd Shoals Project
is located on the Ocmulgee River in
Butts, Henry, Jasper, and Newton
Counties, Georgia. The project does not
occupy any federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Courtenay
O’Mara, Hydro Licensing & Compliance
Supervisor; Georgia Power Company;
241 Ralph McGill Boulevard NE; Bin
10193; Atlanta, Georgia 30308–3374;
(404) 506–7219, or email at cromara@
southernco.com.
i. FERC Contact: Navreet Deo at (202)
502–6304, or email at navreet.deo@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Lloyd Shoals Project consists
of: (1) The 4,750-acre Lake Jackson at
normal pool elevation of 530 feet Plant
Datum (PD) with a gross storage
capacity of 107,000 acre-feet; (2) a
1,600-foot-long, 106-foot-high concrete
gravity dam consisting of a 143-footlong non-overflow section, a 198-footlong powerhouse intake section with
six, 12-foot-high by 12-foot-wide
octagonal water passages supplying the
generating units, a 728.5-foot-long
spillway section consisting of a trash
gate and an Obermeyer gate system, and
a 530-foot-long earth embankment tiein; (3) a concrete and brick powerhouse
containing six horizontal Francis
turbine-generator units, each rated at
3.0-megawatts (MW), for a total
authorized installed capacity of 18–MW;
(4) a 2,100-foot-long saddle dike
approximately 3,000 feet upstream of
the east end of the main dam; (5) a 500foot-long auxiliary spillway, topped
with 10-foot-high flashboards, located
900 feet southwest of the main dam,
which includes a 560-foot-long, 6-foothigh sacrificial earth embankment; (6)
two 2.3-kilovolt generator leads
connecting the powerhouse to a
substation located at the west dam
abutment; and (7) appurtenant facilities.
Georgia Power proposes no
modifications to existing project
facilities.
The Lloyd Shoals Project operates in
a modified run-of-river mode to generate
power during peak demand. Reservoir
elevations are maintained between 530
feet PD and 527 feet PD year-round,
excluding planned drawdowns and
VerDate Sep<11>2014
17:39 Jan 20, 2022
Jkt 256001
drought. The project provides a
continuous minimum flow of 400 cubic
feet per second (cfs), or inflow, to the
Ocmulgee River downstream for the
protection and enhancement of fish and
wildlife resources and other
downstream resources. Georgia Power
proposes no changes to project
operation.
Georgia Power proposes
environmental measures to improve and
enhance water quality, aquatic habitat,
and recreation facilities. Georgia Power
also proposes plans for protection of
shoreline resources and historic
properties.
l. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19)
issued on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov, or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Target date
Issue Deficiency Letter (if
necessary).
Request Additional Information (if necessary).
Notice of Acceptance/Notice
of Ready for Environmental Analysis.
January 2022.
February
2022.
March 2022
Dated: January 14, 2022.
Kimberly D. Bose,
Secretary.
Frm 00017
Fmt 4703
Sfmt 4703
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–484–000.
Applicants: Kinder Morgan Louisiana
Pipeline LLC.
Description: § 4(d) Rate Filing: NonConforming Negotiated Rate Agreement
Filing-Sabine Pass Liquefaction, LLC to
be effective 2/1/2022.
Filed Date: 1/13/22.
Accession Number: 20220113–5136.
Comment Date: 5 p.m. ET 1/20/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01171 Filed 1–20–22; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
Science Advisory Committee on
Chemicals (SACC); Notice of Public
Meeting and Request for Comments on
Draft Toxic Substances Control Act
(TSCA) Screening Level Approach for
Assessing Ambient Air and Water
Exposures to Fenceline Communities
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
[FR Doc. 2022–01174 Filed 1–20–22; 8:45 am]
PO 00000
Federal Energy Regulatory
Commission
[EPA–HQ–OPPT–2021–0415; FRL–9392–01–
OCSPP]
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
E:\FR\FM\21JAN1.SGM
21JAN1
Agencies
[Federal Register Volume 87, Number 14 (Friday, January 21, 2022)]
[Notices]
[Page 3294]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01171]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22-484-000.
Applicants: Kinder Morgan Louisiana Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Non-Conforming Negotiated Rate
Agreement Filing-Sabine Pass Liquefaction, LLC to be effective 2/1/
2022.
Filed Date: 1/13/22.
Accession Number: 20220113-5136.
Comment Date: 5 p.m. ET 1/20/22.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01171 Filed 1-20-22; 8:45 am]