Air Plan Approval; Illinois; Removal of Infrastructure SIP Requirements for the 2012 PM2.5, 2554-2555 [2022-00785]

Download as PDF 2554 Federal Register / Vol. 87, No. 11 / Tuesday, January 18, 2022 / Rules and Regulations cargo. It will prohibit entry within a 500 yard radius of M/V GASLOG WALES and M/V VALENCIA KNUTSEN while the vessels are transiting loaded within Corpus Christi Ship Channel and La Quinta Channel. It is categorically excluded from further review under L60 in Appendix A, Table 1 of DHS Instruction Manual 023–01–001–01, Rev. 1. A Record of Environmental Consideration supporting this determination is available in the docket where indicated under ADDRESSES. G. Protest Activities The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels. List of Subjects in 33 CFR Part 165 Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways. For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows: Dated: January 11, 2022. H.C. Govertsen, Captain, U.S. Coast Guard, Captain of the Port Sector Corpus Christi. [FR Doc. 2022–00786 Filed 1–14–22; 8:45 am] BILLING CODE 9110–04–P ENVIRONMENTAL PROTECTION AGENCY PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS 40 CFR Part 52 1. The authority citation for part 165 continues to read as follows: [EPA–R05–OAR–2017–0583; EPA–R05– OAR–2019–0311; EPA–R05–OAR–2020– 0501; FRL 9056–03–R5] Authority: 46 U.S.C. 70034, 70051; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.2. Air Plan Approval; Illinois; Removal of Infrastructure SIP Requirements for the 2012 PM2.5 and 2015 Ozone NAAQS ■ 2. Add § 165.T08–0020 to read as follows: ■ Environmental Protection Agency (EPA). ACTION: Final rule. (a) Location. The following areas are two security zones: All navigable waters encompassing a 500-yard radius around each of the following vessels: M/V GASLOG WALES and M/V VALENCIA KNUTSEN while the vessels are in the Corpus Christi Ship Channel and La Quinta Channel. (b) Effective period. This section is effective without actual notice from 12:01 a.m. until 11:59 p.m. on January 18, 2022. For the purposes of enforcement, actual notice will be used from January 12, 2022, until 12:01 a.m. on January 18, 2022. (c) Regulations. (1) The general regulations in § 165.33 apply. Entry into the zones is prohibited unless authorized by the Captain of the Port Sector Corpus Christi (COTP) or a designated representative. A designated VerDate Sep<11>2014 16:25 Jan 14, 2022 Jkt 256001 Maintenance Section, Air Programs Branch (AR–18J), EPA, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 886–0266. davidson.olivia@epa.gov. The EPA Region 5 office is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays and facility closures due to COVID–19. SUPPLEMENTARY INFORMATION: EPA published a direct final rule on September 29, 2021 (86 FR 53872), approving elements of a State Implementation Plan (SIP) revision submitted by the State of Illinois regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2012 PM2.5 and 2015 ozone NAAQS and approving the infrastructure requirements related to Prevention of Significant Deterioration (PSD) for previous NAAQS. In the direct final rule, EPA stated that if adverse comments were received by October 29, 2021, the rule would be withdrawn and not take effect. On October 27, 2021, EPA received a comment. EPA believes this comment is adverse and, therefore, EPA is revising its regulations because EPA was unable to withdraw the direct final rule before it took effect. EPA will address the comment in a subsequent final action based upon the proposed action also published on September 29, 2021. See 86 FR 53915. EPA will not institute a second comment period on this action. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Ozone, Particulate matter. AGENCY: § 165.T08–0020 Security Zones; Corpus Christi Ship Channel, Corpus Christi, TX. khammond on DSKJM1Z7X2PROD with RULES representative is a commissioned, warrant, or petty officer of the U.S. Coast Guard (USCG) assigned to units under the operational control of USCG Sector Corpus Christi. (2) Persons or vessels desiring to enter or pass through the zones must request permission from the COTP Sector Corpus Christi on VHF–FM channel 16 or by telephone at 361–939–0450. (3) If permission is granted, all persons and vessels shall comply with the instructions of the COTP or designated representative. (d) Information broadcasts. The COTP or a designated representative will inform the public through Broadcast Notices to Mariners (BNMs), Local Notices to Mariners (LNMs), and/or Marine Safety Information Bulletins (MSIBs) as appropriate of the enforcement times and dates for these security zones. Due to the receipt of an adverse comment on a direct final rule published on September 29, 2021, the Environmental Protection Agency (EPA) is revising its regulations approving elements of a State Implementation Plan revision submitted by the Illinois Environmental Protection Agency on September 29, 2017, May 16, 2019, and September 22, 2020. The submitted revisions were intended to address the infrastructure requirements of section 110 of the Clean Air Act for the 2012 annual fine particulate matter (PM2.5) and 2015 ozone National Ambient Air Quality Standards (NAAQS). DATES: This final rule is effective January 18, 2022. FOR FURTHER INFORMATION CONTACT: Olivia Davidson, Environmental Scientist, Attainment Planning and SUMMARY: PO 00000 Frm 00032 Fmt 4700 Sfmt 4700 Authority: 42 U.S.C. 7401 et seq. Dated: January 11, 2022. Debra Shore, Regional Administrator, Region 5. For the reasons stated in the preamble, EPA amends 40 CFR part 52 as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 1. The authority citation for part 52 continues to read as follows: ■ Authority: 42 U.S.C. 7401 et seq. 2. In § 52.720, the table in paragraph (e) is amended under the heading ‘‘Section 110(a)(2) Infrastructure Requirements’’ by: ■ a. Revising the entries for ‘‘1997 8hour Ozone NAAQS Infrastructure Requirements’’, ‘‘1997 PM2.5 NAAQS Infrastructure Requirements’’, ‘‘2006 24hour PM2.5 NAAQS Infrastructure ■ E:\FR\FM\18JAR1.SGM 18JAR1 Federal Register / Vol. 87, No. 11 / Tuesday, January 18, 2022 / Rules and Regulations Requirements’’, ‘‘2008 Lead NAAQS Infrastructure Requirements’’, ‘‘2008 Ozone NAAQS Infrastructure Requirements’’, ‘‘2010 NO2 NAAQS Infrastructure Requirements’’, ‘‘2010 SO2 NAAQS Infrastructure Requirements’’, and ‘‘2012 PM2.5 NAAQS Infrastructure Requirements’’; and ■ b. Removing the entry ‘‘2015 Ozone NAAQS Infrastructure Requirements’’. 2555 The revisions read as follows: § 52.720 * Identification of plan. * * (e) * * * * * EPA-APPROVED ILLINOIS NONREGULATORY AND QUASI-REGULATORY PROVISIONS Name of SIP provision Applicable geographic or nonattainment area * State submittal date * EPA approval date * Comments * * * * Section 110(a)(2) Infrastructure Requirements 1997 8-hour Ozone NAAQS Infrastructure Requirements. Statewide ............. 12/12/2007 ............... 7/13/2011, 76 FR 41075 .... 1997 PM2.5 NAAQS Infrastructure Requirements. Statewide ............. 12/12/2007 ............... 7/13/2011, 76 FR 41075 .... 2006 24-hour PM2.5 NAAQS Infrastructure Requirements. Statewide ............. 8/9/2011, supplemented on 8/25/ 2011, 6/27/2012, and 7/5/2017. 9/23/2019, 84 FR 4967 ...... 2008 Lead NAAQS Infrastructure Requirements. Statewide ............. 12/31/2012 and 7/5/ 2017. 9/23/2019, 84 FR 49671 .... 2008 Ozone NAAQS Infrastructure Requirements. Statewide ............. 12/31/2012 and 7/5/ 2017. 9/23/2019, 84 FR 49671 .... 2010 NO2 NAAQS Infrastructure Requirements. Statewide ............. 12/31/2012 and 7/5/ 2017. 9/23/2019, 84 FR 49671 .... 2010 SO2 NAAQS Infrastructure Requirements. Statewide ............. 12/31/2012 and 7/5/ 2017. 9/23/2019, 84 FR 49671 .... 2012 PM2.5 NAAQS Infrastructure Requirements. Statewide ............. 9/29/2017 ................. 6/20/2019, 84 FR 28745 .... [FR Doc. 2022–00785 Filed 1–14–22; 8:45 am] BILLING CODE 6560–50–P CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved. CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved. All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed. All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed. All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed. All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed. All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved, and (D)(i)(I) [Prongs 1 and 2], which have not yet been submitted. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed. Fully approving CAA transport requirements of (D)(i)(I). ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 khammond on DSKJM1Z7X2PROD with RULES [EPA–R05–OAR–2015–0699; FRL–9271–02– R5] Air Plan Approval; Ohio; Partial Approval and Partial Disapproval of the Muskingum River SO2 Nonattainment Area Plan Environmental Protection Agency (EPA). AGENCY: ACTION: VerDate Sep<11>2014 16:23 Jan 14, 2022 Jkt 256001 PO 00000 Final rule. Frm 00033 Fmt 4700 Sfmt 4700 The Environmental Protection Agency (EPA) is partially approving and partially disapproving a revision to the Ohio State Implementation Plan (SIP) intended to provide for attainment of the 2010 primary, health-based 1-hour sulfur dioxide (SO2) national ambient air quality standard (NAAQS or ‘‘standard’’) for the Muskingum River SO2 nonattainment area. This SIP revision (hereinafter referred to as the Muskingum River SO2 plan or plan) includes Ohio’s attainment demonstration and other attainment planning elements required under the Clean Air Act (CAA). By this action, EPA is approving the base year SUMMARY: E:\FR\FM\18JAR1.SGM 18JAR1

Agencies

[Federal Register Volume 87, Number 11 (Tuesday, January 18, 2022)]
[Rules and Regulations]
[Pages 2554-2555]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00785]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R05-OAR-2017-0583; EPA-R05-OAR-2019-0311; EPA-R05-OAR-2020-0501; 
FRL 9056-03-R5]


Air Plan Approval; Illinois; Removal of Infrastructure SIP 
Requirements for the 2012 PM2.5 and 2015 Ozone NAAQS

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Due to the receipt of an adverse comment on a direct final 
rule published on September 29, 2021, the Environmental Protection 
Agency (EPA) is revising its regulations approving elements of a State 
Implementation Plan revision submitted by the Illinois Environmental 
Protection Agency on September 29, 2017, May 16, 2019, and September 
22, 2020. The submitted revisions were intended to address the 
infrastructure requirements of section 110 of the Clean Air Act for the 
2012 annual fine particulate matter (PM2.5) and 2015 ozone 
National Ambient Air Quality Standards (NAAQS).

DATES: This final rule is effective January 18, 2022.

FOR FURTHER INFORMATION CONTACT: Olivia Davidson, Environmental 
Scientist, Attainment Planning and Maintenance Section, Air Programs 
Branch (AR-18J), EPA, Region 5, 77 West Jackson Boulevard, Chicago, 
Illinois 60604, (312) 886-0266. [email protected]. The EPA Region 
5 office is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, 
excluding Federal holidays and facility closures due to COVID-19.

SUPPLEMENTARY INFORMATION: EPA published a direct final rule on 
September 29, 2021 (86 FR 53872), approving elements of a State 
Implementation Plan (SIP) revision submitted by the State of Illinois 
regarding the infrastructure requirements of section 110 of the Clean 
Air Act (CAA) for the 2012 PM2.5 and 2015 ozone NAAQS and 
approving the infrastructure requirements related to Prevention of 
Significant Deterioration (PSD) for previous NAAQS. In the direct final 
rule, EPA stated that if adverse comments were received by October 29, 
2021, the rule would be withdrawn and not take effect. On October 27, 
2021, EPA received a comment. EPA believes this comment is adverse and, 
therefore, EPA is revising its regulations because EPA was unable to 
withdraw the direct final rule before it took effect. EPA will address 
the comment in a subsequent final action based upon the proposed action 
also published on September 29, 2021. See 86 FR 53915. EPA will not 
institute a second comment period on this action.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Ozone, Particulate matter.

    Authority:  42 U.S.C. 7401 et seq.

    Dated: January 11, 2022.
Debra Shore,
Regional Administrator, Region 5.

    For the reasons stated in the preamble, EPA amends 40 CFR part 52 
as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.


0
2. In Sec.  52.720, the table in paragraph (e) is amended under the 
heading ``Section 110(a)(2) Infrastructure Requirements'' by:
0
a. Revising the entries for ``1997 8-hour Ozone NAAQS Infrastructure 
Requirements'', ``1997 PM2.5 NAAQS Infrastructure 
Requirements'', ``2006 24-hour PM2.5 NAAQS Infrastructure

[[Page 2555]]

Requirements'', ``2008 Lead NAAQS Infrastructure Requirements'', ``2008 
Ozone NAAQS Infrastructure Requirements'', ``2010 NO2 NAAQS 
Infrastructure Requirements'', ``2010 SO2 NAAQS 
Infrastructure Requirements'', and ``2012 PM2.5 NAAQS 
Infrastructure Requirements''; and
0
b. Removing the entry ``2015 Ozone NAAQS Infrastructure Requirements''.
    The revisions read as follows:


Sec.  52.720   Identification of plan.

* * * * *
    (e) * * *

                                           EPA-Approved Illinois Nonregulatory and Quasi-Regulatory Provisions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                    Applicable geographic or    State submittal
      Name of SIP provision            nonattainment area             date                 EPA approval date                       Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
 
                                                                      * * * * * * *
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                      Section 110(a)(2) Infrastructure Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
1997 8-hour Ozone NAAQS            Statewide................  12/12/2007.........  7/13/2011, 76 FR 41075...........  CAA elements 110(a)(2)(A), (B),
 Infrastructure Requirements.                                                                                          (C) with respect to enforcement,
                                                                                                                       (D)(ii), (E) through (H), (J)
                                                                                                                       except for prevention of
                                                                                                                       significant deterioration (PSD),
                                                                                                                       and (K) through (M) have been
                                                                                                                       approved. CAA elements
                                                                                                                       110(a)(2)(C) and (J) with respect
                                                                                                                       to PSD have been disapproved.
1997 PM2.5 NAAQS Infrastructure    Statewide................  12/12/2007.........  7/13/2011, 76 FR 41075...........  CAA elements 110(a)(2)(A), (B),
 Requirements.                                                                                                         (C) with respect to enforcement,
                                                                                                                       (D)(ii), (E) through (H), (J)
                                                                                                                       except for prevention of
                                                                                                                       significant deterioration (PSD),
                                                                                                                       and (K) through (M) have been
                                                                                                                       approved. CAA elements
                                                                                                                       110(a)(2)(C) and (J) with respect
                                                                                                                       to PSD have been disapproved.
2006 24-hour PM2.5 NAAQS           Statewide................  8/9/2011,            9/23/2019, 84 FR 4967............  All CAA infrastructure elements
 Infrastructure Requirements.                                  supplemented on 8/                                      under 110(a)(2) have been
                                                               25/2011, 6/27/                                          approved except (D)(i)(I) [Prongs
                                                               2012, and 7/5/2017.                                     1 and 2], (D)(ii), and the PSD
                                                                                                                       portions of (C), (D)(i)(II)
                                                                                                                       [Prong 3], and (J), which have
                                                                                                                       been disapproved. The disapproved
                                                                                                                       elements have Federal
                                                                                                                       Implementation Plans (FIP) in
                                                                                                                       place and no further action is
                                                                                                                       needed.
2008 Lead NAAQS Infrastructure     Statewide................  12/31/2012 and 7/5/  9/23/2019, 84 FR 49671...........  All CAA infrastructure elements
 Requirements.                                                 2017.                                                   under 110(a)(2) have been
                                                                                                                       approved except (D)(ii), and the
                                                                                                                       PSD portions of (C), (D)(i)(II)
                                                                                                                       [Prong 3], and (J), which have
                                                                                                                       been disapproved. The disapproved
                                                                                                                       elements have Federal
                                                                                                                       Implementation Plans (FIP) in
                                                                                                                       place and no further action is
                                                                                                                       needed.
2008 Ozone NAAQS Infrastructure    Statewide................  12/31/2012 and 7/5/  9/23/2019, 84 FR 49671...........  All CAA infrastructure elements
 Requirements.                                                 2017.                                                   under 110(a)(2) have been
                                                                                                                       approved except (D)(i)(I) [Prongs
                                                                                                                       1 and 2], (D)(ii), and the PSD
                                                                                                                       portions of (C), (D)(i)(II)
                                                                                                                       [Prong 3], and (J), which have
                                                                                                                       been disapproved. The disapproved
                                                                                                                       elements have Federal
                                                                                                                       Implementation Plans (FIP) in
                                                                                                                       place and no further action is
                                                                                                                       needed.
2010 NO2 NAAQS Infrastructure      Statewide................  12/31/2012 and 7/5/  9/23/2019, 84 FR 49671...........  All CAA infrastructure elements
 Requirements.                                                 2017.                                                   under 110(a)(2) have been
                                                                                                                       approved except (D)(ii), and the
                                                                                                                       PSD portions of (C), (D)(i)(II)
                                                                                                                       [Prong 3], and (J), which have
                                                                                                                       been disapproved. The disapproved
                                                                                                                       elements have Federal
                                                                                                                       Implementation Plans (FIP) in
                                                                                                                       place and no further action is
                                                                                                                       needed.
2010 SO2 NAAQS Infrastructure      Statewide................  12/31/2012 and 7/5/  9/23/2019, 84 FR 49671...........  All CAA infrastructure elements
 Requirements.                                                 2017.                                                   under 110(a)(2) have been
                                                                                                                       approved except (D)(ii), and the
                                                                                                                       PSD portions of (C), (D)(i)(II)
                                                                                                                       [Prong 3], and (J), which have
                                                                                                                       been disapproved, and (D)(i)(I)
                                                                                                                       [Prongs 1 and 2], which have not
                                                                                                                       yet been submitted. The
                                                                                                                       disapproved elements have Federal
                                                                                                                       Implementation Plans (FIP) in
                                                                                                                       place and no further action is
                                                                                                                       needed.
2012 PM2.5 NAAQS Infrastructure    Statewide................  9/29/2017..........  6/20/2019, 84 FR 28745...........  Fully approving CAA transport
 Requirements.                                                                                                         requirements of (D)(i)(I).
--------------------------------------------------------------------------------------------------------------------------------------------------------

[FR Doc. 2022-00785 Filed 1-14-22; 8:45 am]
BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.