Download as PDF 1742 Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices Comments are invited on: (1) Whether the collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: January 5, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–00354 Filed 1–11–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2628–066] Alabama Power Company; Notice of Technical Teleconference lotter on DSK11XQN23PROD with NOTICES1 On January 20, 2022, Federal Energy Regulatory Commission (Commission) staff will host a technical teleconference to discuss details of the models used to evaluate alternative operating curves and downstream releases for relicensing Alabama Power Company’s (Alabama Power) R.L. Harris Hydroelectric Project No. 2628 (Harris Project). a. Date and Time of Teleconference: Thursday, January 20, 2022, from 2:00 p.m. to 4:30 p.m. Eastern Time. b. FERC Contact: Sarah Salazar at 202–502–6863, or sarah.salazar@ ferc.gov. c. Purpose of Teleconference: On November 23, 2021, Alabama Power filed an application to relicense the Harris Project. The application includes 7 There is one response per respondent for each activity in this information collection. 8 Commission staff estimates that the average industry hourly cost for this information collection is approximated by the current FERC 2021 average hourly costs for wages and benefits, i.e., $87.00/ hour. 9 The previously reported 33 responses associated with Comprehensive Plans were incorrect and not consistent in how we have approached the number of respondents for this Information Collection. As a result, the total number of hours associated with the Comprehensive Plans requirement was moved to the total number of hours associated with the application process. The Commission does not break down pieces of this process (as it is all considered one application) and so this edit was made for consistency across the information collection. VerDate Sep<11>2014 17:04 Jan 11, 2022 Jkt 256001 analysis and proposals based on results of studies that involved the use of models, including the Hydrologic Engineering Center’s River Analysis System (HEC–RAS) and Hydrologic Engineering Center’s Reservoir System Simulation (HEC-ResSim). On December 23, 2021, Commission staff issued additional information requests (AIRs) regarding the models. Alabama Power representatives requested a teleconference so their modeling experts can address the AIRs. d. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to attend and observe the technical teleconference. Attendees will be in listen-only mode, and will have an opportunity to ask questions pertaining to the models at the end of the teleconference. Please contact Allan Creamer at (202) 502–8365, or allan.creamer@ferc.gov by January 17, 2022, to RSVP for the teleconference. Details will be provided by Commission staff once attendance is confirmed. Commission staff will prepare a summary of the teleconference and issue it to the Commission’s e-library under the Harris Project docket (P– 2628). Dated: January 5, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–00356 Filed 1–11–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC22–32–000. Applicants: Tenaska Gateway Partners, Ltd. Description: Application for Authorization Under Section 203 of the Federal Power Act of Tenaska Gateway Partners, Ltd. Filed Date: 1/5/22. Accession Number: 20220105–5236. Comment Date: 5 p.m. ET 1/26/22. Docket Numbers: EC22–33–000. Applicants: FirstEnergy Transmission, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of FirstEnergy Transmission, LLC, et al. Filed Date: 1/5/22. Accession Number: 20220105–5238. Comment Date: 5 p.m. ET 1/26/22. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2488–023; ER13–1586–018; ER14–2871–017; ER15–463–016; ER15–621–016; ER15– 622–016; ER16–72–012; ER16–182–012; ER16–902–009; ER17–47–009; ER17– 48–010; ER18–47–008; ER18–2240–005; ER18–2241–005; ER19–426–005; ER19– 427–005; ER19–1575–006; ER19–1660– 005; ER19–1662–005; ER19–1667–005; ER20–71–005; ER20–72–005; ER20–75– 005; ER20–76–007; ER20–77–005; ER20–79–005; ER21–1368–001; ER21– 1369–002; ER21–1371–002; ER21–1373– 003; ER21–1376–003; ER21–2782–001; ER22–149–001. Applicants: Sagebrush Line, LLC, Sagebrush ESS, LLC, Sanborn Solar 1A, LLC, Edwards Solar 1A, LLC, Edwards Sanborn Storage II, LLC, Edwards Sanborn Storage I, LLC, Valley Center ESS, LLC, Voyager Wind IV Expansion, LLC, Painted Hills Wind Holdings, LLC, Oasis Plains Wind, LLC, Oasis Alta, LLC, Coachella Wind Holdings, LLC, Coachella Hills Wind, LLC, Terra-Gen VG Wind, LLC, Mojave 16/17/18 LLC, Mojave 3/4/5 LLC, Alta Oak Realty, LLC, LUZ Solar Partners IX, Ltd., LUZ Solar Partners VIII, Ltd., Garnet Wind, LLC, Yavi Energy, LLC, Voyager Wind II, LLC, Terra-Gen Mojave Windfarms, LLC, DifWind Farms LTD VI, Voyager Wind I, LLC, Cameron Ridge II, LLC, San Gorgonio Westwinds II— Windustries, LLC, Ridgetop Energy, LLC, Pacific Crest Power, LLC, San Gorgonio Westwinds II, LLC, Cameron Ridge, LLC, TGP Energy Management, LLC, Oasis Power Partners, LLC. Description: Triennial Market Power Analysis for Southwest Region and Notice of Change in Status of Oasis Power Partners, LLC, et al. Filed Date: 12/30/21. Accession Number: 20211230–5331. Comment Date: 5 p.m. ET 2/28/22. Docket Numbers: ER20–2276–001. Applicants: Moxie Freedom LLC. Description: Notice of Non-Material Change in Status of Moxie Freedom LLC. Filed Date: 1/6/22. Accession Number: 20220106–5181. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER21–2652–002. Applicants: Caddo Wind, LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Caddo Wind, LLC. Filed Date: 1/3/22. Accession Number: 20220103–5494. Comment Date: 5 p.m. ET 3/4/22. Docket Numbers: ER22–774–000. Applicants: PJM Interconnection, L.L.C. E:\FR\FM\12JAN1.SGM 12JAN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices Description: § 205(d) Rate Filing: Amendment to WMPA, SA No. 5665; Queue No. AF1–032 (amend) to be effective 5/28/2020. Filed Date: 1/5/22. Accession Number: 20220105–5201. Comment Date: 5 p.m. ET 1/26/22. Docket Numbers: ER22–775–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3875 White Rock Wind East GIA to be effective 12/8/2021. Filed Date: 1/6/22. Accession Number: 20220106–5048. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER22–776–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, Service Agreement No. 5841; Queue No. AF2– 151 to be effective 10/9/2020. Filed Date: 1/6/22. Accession Number: 20220106–5067. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER22–777–000. Applicants: Sky River LLC. Description: § 205(d) Rate Filing: SR and NSRE Second Amended and Restated Shared Facilities Agreement to be effective 1/7/2022. Filed Date: 1/6/22. Accession Number: 20220106–5074. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER22–778–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement Nos. 386 and 388— E&P Agreements between APS and AES to be effective 3/8/2022. Filed Date: 1/6/22. Accession Number: 20220106–5105. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER22–779–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DECNew River NITSA SA No. 546 to be effective 1/1/2022. Filed Date: 1/6/22. Accession Number: 20220106–5126. Comment Date: 5 p.m. ET 1/27/22. Docket Numbers: ER22–780–000. Applicants: Sky River LLC. Description: § 205(d) Rate Filing: SR (Transmission) and Sky River Wind, LLC Shared Facilities Agreement to be effective 1/7/2022. Filed Date: 1/6/22. Accession Number: 20220106–5177. Comment Date: 5 p.m. ET 1/27/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. VerDate Sep<11>2014 17:04 Jan 11, 2022 Jkt 256001 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 6, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–00427 Filed 1–11–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL22–21–000. Applicants: South Texas Electric Cooperative, Inc., San Bernard Electric Cooperative, Inc. Description: Request of South Texas Electric Cooperative, Inc. and San Bernard Electric Cooperative, Inc. for Partial Waiver of Electric Utility Obligations Under PURPA to Purchase and Sell Energy From and To Qualifying Facilities. Filed Date: 12/21/21. Accession Number: 20211221–5277. Comment Date: 5 p.m. ET 1/18/22. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1862–033; ER10–1865–014; ER10–1873–014; ER10–1875–014; ER10–1876–015; ER10–1878–014; ER10–1883–014; ER10–1884–014; ER10–1885–014; ER10–1888–014; ER10–1893–033; ER10–1934–033; ER10–1938–034; ER10–1941–014; ER10–1942–031; ER10–1947–015; ER10–2042–039; ER10–2985–037; ER10–3049–038; ER10–3051–038; ER11–4369–018; ER12–1987–012; ER12–2261–013; ER12–2645–007; ER13–1407–011; ER16–2218–019; ER17–696–019; ER19– 1127–004; ER20–1699–002. Applicants: Johanna Energy Center, LLC, Calpine King City Cogen, LLC, PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 1743 Calpine Energy Solutions, LLC, North American Power Business, LLC,CCFC Sutter Energy, LLC, Pastoria Energy Facility L.L.C., Russell City Energy Company, LLC,O.L.S. Energy-Agnews, Inc., North American Power and Gas, LLC, Champion Energy, LLC, Champion Energy Services, LLC, Champion Energy Marketing LLC, Calpine Energy Services, L.P., Otay Mesa Energy Center, LLC, Calpine Construction Finance Co., L.P., Calpine Gilroy Cogen, L.P., Calpine Power America—CA, LLC,CES Marketing IX, LLC,CES Marketing X, LLC, Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center, LLC, Los Esteros Critical Energy Facility, LLC, Los Medanos Energy Center LLC, Metcalf Energy Center, LLC, South Point Energy Center, LLC, Power Contract Financing, L.L.C. Description: Updated Market Power Analysis (Southwest Region) for the indirect subsidiaries of Calpine Corporation. Filed Date: 1/3/22. Accession Number: 20220103–5491. Comment Date: 5 p.m. ET 3/4/22. Docket Numbers: ER10–3050–008; ER10–3053–008. Applicants: Whitewater Hill Wind Partners, LLC, Cabazon Wind Partners, LLC. Description: Triennial Market Power Analysis for Southwest Region of Cabazon Wind Partners, LLC, et al. Filed Date: 1/3/22. Accession Number: 20220103–5489. Comment Date: 5 p.m. ET 3/4/22. Docket Numbers: ER15–1332–008; ER10–2401–008; ER10–2402–008; ER10–2403–009; ER11–3414–009; ER13–1816–015; ER15–1333–008; ER17–1318–005; ER18–1188–004. Applicants: Prairie Queen Wind Farm LLC, Redbed Plains Wind Farm LLC, Waverly Wind Farm LLC, Sustaining Power Solutions LLC, Blue Canyon Windpower VI LLC, Cloud County Wind Farm, LLC, Blue Canyon Windpower V LLC, Blue Canyon Windpower II LLC, Arbuckle Mountain Wind Farm LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Arbuckle Mountain Wind Farm LLC, et al. Filed Date: 1/3/22. Accession Number: 20220103–5493. Comment Date: 5 p.m. ET 3/4/22. Docket Numbers: ER22–136–001. Applicants: Sagebrush Line, LLC. Description: Compliance filing: Compliance Filing of Executed Facilities Use Agreements to be effective 12/27/ 2021. E:\FR\FM\12JAN1.SGM 12JAN1

Agencies

[Federal Register Volume 87, Number 8 (Wednesday, January 12, 2022)]
[Notices]
[Pages 1742-1743]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00427]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC22-32-000.
    Applicants: Tenaska Gateway Partners, Ltd.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Tenaska Gateway Partners, Ltd.
    Filed Date: 1/5/22.
    Accession Number: 20220105-5236.
    Comment Date: 5 p.m. ET 1/26/22.

    Docket Numbers: EC22-33-000.
    Applicants: FirstEnergy Transmission, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of FirstEnergy Transmission, LLC, et al.
    Filed Date: 1/5/22.
    Accession Number: 20220105-5238.
    Comment Date: 5 p.m. ET 1/26/22.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-2488-023; ER13-1586-018; ER14-2871-017; ER15-
463-016; ER15-621-016; ER15-622-016; ER16-72-012; ER16-182-012; ER16-
902-009; ER17-47-009; ER17-48-010; ER18-47-008; ER18-2240-005; ER18-
2241-005; ER19-426-005; ER19-427-005; ER19-1575-006; ER19-1660-005; 
ER19-1662-005; ER19-1667-005; ER20-71-005; ER20-72-005; ER20-75-005; 
ER20-76-007; ER20-77-005; ER20-79-005; ER21-1368-001; ER21-1369-002; 
ER21-1371-002; ER21-1373-003; ER21-1376-003; ER21-2782-001; ER22-149-
001.
    Applicants: Sagebrush Line, LLC, Sagebrush ESS, LLC, Sanborn Solar 
1A, LLC, Edwards Solar 1A, LLC, Edwards Sanborn Storage II, LLC, 
Edwards Sanborn Storage I, LLC, Valley Center ESS, LLC, Voyager Wind IV 
Expansion, LLC, Painted Hills Wind Holdings, LLC, Oasis Plains Wind, 
LLC, Oasis Alta, LLC, Coachella Wind Holdings, LLC, Coachella Hills 
Wind, LLC, Terra-Gen VG Wind, LLC, Mojave 16/17/18 LLC, Mojave 3/4/5 
LLC, Alta Oak Realty, LLC, LUZ Solar Partners IX, Ltd., LUZ Solar 
Partners VIII, Ltd., Garnet Wind, LLC, Yavi Energy, LLC, Voyager Wind 
II, LLC, Terra-Gen Mojave Windfarms, LLC, DifWind Farms LTD VI, Voyager 
Wind I, LLC, Cameron Ridge II, LLC, San Gorgonio Westwinds II--
Windustries, LLC, Ridgetop Energy, LLC, Pacific Crest Power, LLC, San 
Gorgonio Westwinds II, LLC, Cameron Ridge, LLC, TGP Energy Management, 
LLC, Oasis Power Partners, LLC.
    Description: Triennial Market Power Analysis for Southwest Region 
and Notice of Change in Status of Oasis Power Partners, LLC, et al.
    Filed Date: 12/30/21.
    Accession Number: 20211230-5331.
    Comment Date: 5 p.m. ET 2/28/22.

    Docket Numbers: ER20-2276-001.
    Applicants: Moxie Freedom LLC.
    Description: Notice of Non-Material Change in Status of Moxie 
Freedom LLC.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5181.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER21-2652-002.
    Applicants: Caddo Wind, LLC.
    Description: Triennial Market Power Analysis for Southwest Power 
Pool Inc. Region of Caddo Wind, LLC.
    Filed Date: 1/3/22.
    Accession Number: 20220103-5494.
    Comment Date: 5 p.m. ET 3/4/22.

    Docket Numbers: ER22-774-000.
    Applicants: PJM Interconnection, L.L.C.

[[Page 1743]]

    Description: Sec.  205(d) Rate Filing: Amendment to WMPA, SA No. 
5665; Queue No. AF1-032 (amend) to be effective 5/28/2020.
    Filed Date: 1/5/22.
    Accession Number: 20220105-5201.
    Comment Date: 5 p.m. ET 1/26/22.

    Docket Numbers: ER22-775-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3875 White Rock Wind East 
GIA to be effective 12/8/2021.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5048.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER22-776-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to WMPA, Service 
Agreement No. 5841; Queue No. AF2-151 to be effective 10/9/2020.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5067.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER22-777-000.
    Applicants: Sky River LLC.
    Description: Sec.  205(d) Rate Filing: SR and NSRE Second Amended 
and Restated Shared Facilities Agreement to be effective 1/7/2022.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5074.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER22-778-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement Nos. 386 
and 388--E&P Agreements between APS and AES to be effective 3/8/2022.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5105.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER22-779-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-New River NITSA SA No. 
546 to be effective 1/1/2022.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5126.
    Comment Date: 5 p.m. ET 1/27/22.

    Docket Numbers: ER22-780-000.
    Applicants: Sky River LLC.
    Description: Sec.  205(d) Rate Filing: SR (Transmission) and Sky 
River Wind, LLC Shared Facilities Agreement to be effective 1/7/2022.
    Filed Date: 1/6/22.
    Accession Number: 20220106-5177.
    Comment Date: 5 p.m. ET 1/27/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 6, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-00427 Filed 1-11-22; 8:45 am]