Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline; Northern Natural Gas Company, 1738-1739 [2022-00408]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
1738
Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices
license also requires a minimum
bypassed reach flow of 80 cubic feet per
second or inflow to the impoundment,
whichever is less, from June 1 through
October 15 to protect aquatic resources
in Otter Creek and aesthetic resources in
the project area. The average annual
generation of the project was
approximately 541.7 megawatt-hours
from 2014 through 2020.
The applicant proposes to: (1)
Continue to operate the project in a runof-river mode to protect aquatic
resources; (2) continue to release a
minimum bypassed reach flow of 80 cfs
or inflow, whichever is less, from June
1 through October 15, to protect aquatic
resources; (3) release a minimum
bypassed reach flow of 40 cfs or inflow,
whichever is less, from October 16
through May 31, to protect aquatic
resources; and (4) implement a seasonal
clearing restriction from April 15
through October 31, for trees that are 4
inches in diameter or greater, to protect
the federally threatened northern longeared bat. In addition, GMP states that
the flashboards have not been in place
since prior to 2012, and proposes to
reinstall them.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–2445).
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)—
February 2022
Request Additional Information—
February 2022
Issue Scoping Document 1 for
comments—May 2022
Request Additional Information (if
necessary)—June 2022
Issue Acceptance Letter—June 2022
Issue Scoping Document 2—July 2022
VerDate Sep<11>2014
17:04 Jan 11, 2022
Jkt 256001
Issue Notice of Ready for Environmental
Analysis—July 2022
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: January 6, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00413 Filed 1–11–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–33–000]
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline;
Northern Natural Gas Company
Take notice that on December 27,
2021, Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, Nebraska 68124, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205,
157.213(b) and 157.216(b) of the
Commission’s regulations under the
Natural Gas Act (NGA) and Northern’s
blanket certificate issued in Docket No.
CP82–401–000, for authorization to
replace an injection and withdrawal
well at its Redfield Storage Field,
located in Dallas County, Iowa.
Northern purposes to (1) install and
operate an injection and withdrawal
well; (2) install a natural gas pipeline
lateral; (3) install a water production
line; and (4) abandon an existing
injection and withdrawal well. Northern
estimates that the cost of the Project is
approximately $3.8 million. Northern
states that the replacement injection and
withdrawal well will have no impact on
the Redfield storage field’s certificated
physical parameters, including total gas
storage inventory, reservoir pressure,
reservoir and buffer boundaries and
certificated capacity. In addition,
Northern states that there will be no
impact to service of Northern’s
customers as a result of the proposed
Project, all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
Michael T. Loeffler, Senior Director,
Certificates and External Affairs for
Northern, 1111 South 103rd Street,
Omaha, NE 68124, at 402–398–7103, or
by email to mike.loeffler@nngco.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on March 7, 2022. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is March 7,
2022. A protest may also serve as a
motion to intervene so long as the
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
2 Persons
E:\FR\FM\12JAN1.SGM
12JAN1
Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices
protestor states it also seeks to be an
intervenor.
How To File Protests, Interventions, and
Comments
Interventions
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP22–33–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below.7 Your submission must reference
the Project docket number CP22–33–
000. Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: 1111 South 103rd Street,
Omaha, NE 68124, or by email to (with
a link to the document) at:
mike.loeffler@nngco.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is March 7, 2022.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
lotter on DSK11XQN23PROD with NOTICES1
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before March 7,
2022. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
4 18
5 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
17:04 Jan 11, 2022
Jkt 256001
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
7 Hand-delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
1739
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: January 6, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00408 Filed 1–11–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC21–34–000]
Commission Information Collection
Activities (FERC–500 and FERC–505);
Comment Request; Extension
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on two currently
approved information collections:
FERC–500, Application for License/
Relicense for Water Projects with More
than 10 Megawatt (MW) Capacity; and
FERC–505, Application for Small
Hydropower Projects and Conduit
Facilities including License/Relicense,
Exemption, and Qualifying Conduit
Facility Determinations, which will be
submitted to the Office of Management
and Budget (OMB) for a review of the
information collection requirements.
DATES: Comments on the collections of
information are due February 11, 2022.
ADDRESSES: Send written comments on
FERC–500 and FERC–505 to OMB
through www.reginfo.gov/public/do/
PRAMain, Attention: Federal Energy
Regulatory Commission Desk Officer.
Please identify the OMB control
numbers 1902–0058 (FERC–500) and
1902–0115 (FERC–505) in the subject
line. Your comments should be sent
within 30 days of publication of this
notice in the Federal Register.
Please submit copies of your
comments (identified by Docket No.
IC21–34–000) to the Commission as
SUMMARY:
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 87, Number 8 (Wednesday, January 12, 2022)]
[Notices]
[Pages 1738-1739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00408]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-33-000]
Notice of Request Under Blanket Authorization and Establishing
Intervention and Protest Deadline; Northern Natural Gas Company
Take notice that on December 27, 2021, Northern Natural Gas Company
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in
the above referenced docket, a prior notice request pursuant to
sections 157.205, 157.213(b) and 157.216(b) of the Commission's
regulations under the Natural Gas Act (NGA) and Northern's blanket
certificate issued in Docket No. CP82-401-000, for authorization to
replace an injection and withdrawal well at its Redfield Storage Field,
located in Dallas County, Iowa. Northern purposes to (1) install and
operate an injection and withdrawal well; (2) install a natural gas
pipeline lateral; (3) install a water production line; and (4) abandon
an existing injection and withdrawal well. Northern estimates that the
cost of the Project is approximately $3.8 million. Northern states that
the replacement injection and withdrawal well will have no impact on
the Redfield storage field's certificated physical parameters,
including total gas storage inventory, reservoir pressure, reservoir
and buffer boundaries and certificated capacity. In addition, Northern
states that there will be no impact to service of Northern's customers
as a result of the proposed Project, all as more fully set forth in the
application, which is on file with the Commission and open to public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Michael T. Loeffler, Senior Director, Certificates and
External Affairs for Northern, 1111 South 103rd Street, Omaha, NE
68124, at 402-398-7103, or by email to [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on March 7, 2022. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is March 7, 2022. A protest may also serve
as a motion to intervene so long as the
[[Page 1739]]
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is March 7, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before March 7, 2022. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP22-33-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below.\7\ Your submission must reference the Project docket
number CP22-33-000. Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
---------------------------------------------------------------------------
\7\ Hand-delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail at: 1111 South 103rd Street, Omaha, NE 68124, or by
email to (with a link to the document) at: [email protected]. Any
subsequent submissions by an intervenor must be served on the applicant
and all other parties to the proceeding. Contact information for
parties can be downloaded from the service list at the eService link on
FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: January 6, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-00408 Filed 1-11-22; 8:45 am]