PacifiCorp; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 73752 [2021-28203]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
73752
Federal Register / Vol. 86, No. 246 / Tuesday, December 28, 2021 / Notices
Filed Date: 12/21/21.
Accession Number: 20211221–5165.
Comment Date: 5 p.m. ET 1/11/22.
Docket Numbers: ER22–702–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT Sch. 12-Appendices
re: 2022 RTEP Annual Cost Allocations
to be effective 1/1/2022.
Filed Date: 12/21/21.
Accession Number: 20211221–5175.
Comment Date: 5 p.m. ET 1/11/22.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM22–6–000.
Applicants: South Texas Electric
Cooperative, Inc.
Description: Application of South
Texas Electric Cooperative, Inc. to
Terminate Its Mandatory Purchase
Obligation under the Public Utility
Regulatory Policies Act of 1978.
Filed Date: 12/21/21.
Accession Number: 20211221–5143.
Comment Date: 5 p.m. ET 1/18/22.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR21–3–001.
Applicants: North American Electric
Reliability Corporation.
Description: Joint Compliance Filing
of The North American Electric
Reliability Corporation and Texas
Reliability Entity, Inc. for Approval of
Amendment to the Bylaws of Texas
Reliability Entity, Inc.
Filed Date: 12/21/21.
Accession Number: 20211221–5174.
Comment Date: 5 p.m. ET 1/11/22.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
22:45 Dec 27, 2021
Jkt 256001
Dated: December 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28209 Filed 12–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15239–000]
PacifiCorp; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 13, 2021, PacifiCorp filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Crooked Creek Pumped
Storage Project (Crooked Creek Project
or project) to be located near Valley
Falls, Lake County, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An upper reservoir
with a surface area of 52 acres and a
storage volume of approximately 2,344
acre-feet created by a 4,200-foot-long,
100-foot-high embankment dam; (2) a
lower reservoir with a surface area of 50
acres and a storage volume of
approximately 2,052 acre-feet created by
a 4,300-foot-long, 130 foot-high
embankment dam; (3) a 2-mile-long
excavated tunnel and 1.3-mile-long steel
penstock totaling 3.3 miles with a
diameter of 18-feet connecting the upper
reservoir with the powerhouse/pump
station; (4) a 150-foot-long, 50-foot-wide
concrete powerhouse/pump station
located on the lower reservoir shoreline
containing three 167-megawatt
generating/pumping units; (5) a 19.7mile, 500-kilovolt transmission line
interconnecting to PacifiCorp’s existing
Mile Hi substation in Lakeview, Oregon;
(6) an 8.7 mile underground pipeline
diverting water from the Chewaucan
River to the project for initial and
maintenance fill; and, (7) appurtenant
facilities. The estimated annual
generation of the Crooked Creek Project
would be 1,460 gigawatt-hours.
Applicant Contact: Tim Hemstreet,
Managing Director, Renewable Energy
Development, PacifiCorp, 825 NE
Multnomah, Suite 1800, Portland, OR
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
97232; email: Tim.Hemstreet@
pacificorp.com; phone: (503) 813–6170.
FERC Contact: Kristen Sinclair; email:
kristen.sinclair@ferc.gov; phone: (202)
502–6587.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. In lieu of electronic
filing, you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15239–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15239) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28203 Filed 12–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RD21–6–000]
Commission Information Collection
Activity (FERC–725B4); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
AGENCY:
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 86, Number 246 (Tuesday, December 28, 2021)]
[Notices]
[Page 73752]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-28203]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15239-000]
PacifiCorp; Notice of Preliminary Permit Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On October 13, 2021, PacifiCorp filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Crooked Creek Pumped Storage
Project (Crooked Creek Project or project) to be located near Valley
Falls, Lake County, Oregon. The sole purpose of a preliminary permit,
if issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) An upper
reservoir with a surface area of 52 acres and a storage volume of
approximately 2,344 acre-feet created by a 4,200-foot-long, 100-foot-
high embankment dam; (2) a lower reservoir with a surface area of 50
acres and a storage volume of approximately 2,052 acre-feet created by
a 4,300-foot-long, 130 foot-high embankment dam; (3) a 2-mile-long
excavated tunnel and 1.3-mile-long steel penstock totaling 3.3 miles
with a diameter of 18-feet connecting the upper reservoir with the
powerhouse/pump station; (4) a 150-foot-long, 50-foot-wide concrete
powerhouse/pump station located on the lower reservoir shoreline
containing three 167-megawatt generating/pumping units; (5) a 19.7-
mile, 500-kilovolt transmission line interconnecting to PacifiCorp's
existing Mile Hi substation in Lakeview, Oregon; (6) an 8.7 mile
underground pipeline diverting water from the Chewaucan River to the
project for initial and maintenance fill; and, (7) appurtenant
facilities. The estimated annual generation of the Crooked Creek
Project would be 1,460 gigawatt-hours.
Applicant Contact: Tim Hemstreet, Managing Director, Renewable
Energy Development, PacifiCorp, 825 NE Multnomah, Suite 1800, Portland,
OR 97232; email: [email protected]; phone: (503) 813-6170.
FERC Contact: Kristen Sinclair; email: [email protected];
phone: (202) 502-6587.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15239-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15239) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-28203 Filed 12-27-21; 8:45 am]
BILLING CODE 6717-01-P