Combined Notice of Filings #1, 72942-72943 [2021-27871]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
72942
Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 7, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Jefferson Mill
Hydroelectric Project (P–15038–001).
m. This application is not ready for
environmental analysis at this time.
n. The proposed project would consist
of: (1) An existing 140-foot-long, 9-foothigh masonry dam that impounds a
1.46-acre reservoir with a gross volume
of 5.3 acre-feet at the normal pool
elevation of 320.0 feet mean sea level;
(2) a new 12.5-foot-wide, 4-foot-high
intake rack with 0.75-inch spacing to
prevent river debris from entering the
intake; (3) a new 14-foot-long, 12-footwide, and 10-foot-high reinforced
concrete intake structure, mostly
constructed below-grade and upstream
of the dam on the west side of the river;
(4) a new 70-foot-long, 3-foot-diameter
penstock; (5) a new eel ramp for the
upstream passage of American eel and
sea lamprey; (6) an existing 3-foot-wide
and 0.9-foot-high low-flow notch and
4.6-foot-deep plunge pool for
downstream fish passage; (7) an existing
33-foot-wide, 8-foot-long, 14-foot-high
powerhouse with one new 20-kilowatt
(kW) turbine-generator unit; (8) two new
100-foot-long underground utility
VerDate Sep<11>2014
20:50 Dec 22, 2021
Jkt 256001
trenches (containing conduits for utility
power, generator power, and
communications) between the
powerhouse and control equipment
shed; (9) a new draft tube that connects
the exit of the turbine to the tailrace;
(10) a transmission line connecting the
project to the distribution system owned
by the Appalachian Power Company;
and (11) appurtenant facilities. The
project is estimated to generate an
average of 111,000 kW-hours annually.
The applicant proposes to operate the
project in a run-of-river mode.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Virginia State
Historic Preservation Officer (SHPO), as
required by section 106 of the National
Historic Preservation Act and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate
(e.g., if there are no deficiencies or a
need for additional information, the
schedule would be shortened).
Issue Deficiency Letter (if necessary)—
March 2022
Request Additional Information—March
2022
Issue Acceptance Letter—June 2022
Issue Scoping Document 1 for
comments—July 2022
Request Additional Information (if
necessary)—September 2022
Issue Scoping Document 2—October
2022
Issue Notice of Ready for Environmental
Analysis—October 2022
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27873 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–28–000.
Applicants: Northern Wind Energy
Redevelopment, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Northern Wind
Energy Redevelopment, LLC.
Filed Date: 12/16/21.
Accession Number: 20211216–5212.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22–29–000.
Applicants: Red Barn Energy, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Red Barn Energy,
LLC.
Filed Date: 12/16/21.
Accession Number: 20211216–5224.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22–30–000.
Applicants: Rock Aetna Power
Partners, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Rock Aetna Power
Partners, LLC.
Filed Date: 12/16/21.
Accession Number: 20211216–5225.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22–31–000.
Applicants: Arrow Canyon Solar,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Arrow Canyon
Solar, LLC.
Filed Date: 12/17/21.
Accession Number: 20211217–5235.
Comment Date: 5 p.m. ET 1/7/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1821–004.
Applicants: Panda Stonewall LLC.
Description: Refund Report: Potomac
Energy Center, LLC submits tariff filing
per 35.19a(b): Refund Report to be
effective N/A.
Filed Date: 12/17/21.
Accession Number: 20211217–5107.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER20–1418–001.
Applicants: Pacific Gas and Electric
Company.
Description: Compliance filing: FERC
Order No. 864 TO Tariff Second
Compliance Filing to be effective 1/27/
2020.
E:\FR\FM\23DEN1.SGM
23DEN1
jspears on DSK121TN23PROD with NOTICES1
Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices
Filed Date: 12/17/21.
Accession Number: 20211217–5000.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–226–001.
Applicants: Avista Corporation.
Description: Tariff Amendment: First
Amendment to OATT revisions for EIM
Entry, Att M to be effective 2/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5199.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–333–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
NorthWestern (South Dakota)
Amendment to Formula Rate Tariff
filing to be effective 1/3/2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5232.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–667–000.
Applicants: Mulligan 3 Wind LLC.
Description: Petiton for Limited
Waiver of Mulligan 3 Wind LLC.
Filed Date: 12/15/21.
Accession Number: 20211215–5308.
Comment Date: 5 p.m. ET 12/27/21.
Docket Numbers: ER22–673–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing: 2022
TACBAA Update to be effective 1/1/
2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5001.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–674–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing: 2022
RS Filing to be effective 1/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5002.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–675–000.
Applicants: New York State
Reliability Counsel, L.L.C.
Description: New York State
Reliability Council submits Revised
Install Capacity Requirement for the
New York Control Area for the period
Beginning May 1, 2021 ending April 30,
2022.
Filed Date: 12/16/21.
Accession Number: 20211216–5247.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: ER22–676–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original SA No. 6261, Dynamic
Schedule Agreement between PJM and
NIPSCO to be effective 12/1/2021.
Filed Date: 12/17/21.
Accession Number: 20211217–5060.
Comment Date: 5 p.m. ET 1/7/22.
VerDate Sep<11>2014
20:50 Dec 22, 2021
Jkt 256001
Docket Numbers: ER22–677–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Rate Schedule No. 338
to be effective 11/17/2021.
Filed Date: 12/17/21.
Accession Number: 20211217–5170.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–678–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Amendment:
Notice of Cancellation of Rate Schedule
No. 81 to be effective 11/17/2021.
Filed Date: 12/17/21.
Accession Number: 20211217–5171.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–680–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
WDAT Enhancements 2021 to be
effective 2/16/2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5222.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–681–000.
Applicants: Exelon Generation
Company, LLC.
Description: § 205(d) Rate Filing:
Filing of Letter Agreement to be
effective 1/25/2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5292.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22–682–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
DEP–NCEMPA—Revisions to Rate
Schedule No. 200 to be effective 3/1/
2022.
Filed Date: 12/17/21.
Accession Number: 20211217–5303.
Comment Date: 5 p.m. ET 1/7/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
72943
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27871 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–40–006]
Spire STL Pipeline LLC; Notice of
Intent To Prepare a Supplemental
Environmental Impact Statement for
The Spire STL Pipeline Project,
Request for Comments on
Environmental Issues, and Schedule
for Environmental Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare a
supplemental environmental impact
statement (EIS) that will discuss the
environmental impacts related to the
continued operation of the Spire STL
Pipeline Project facilities by Spire STL
Pipeline LLC (Spire) in Scott, Greene,
and Jersey Counties, Illinois and St.
Charles and St. Louis Counties,
Missouri. By way of background, on
June 22, 2021, the U.S. Court of Appeals
for the District of Columbia Circuit
issued an opinion vacating and
remanding the Commission’s August 3,
2018 Order Issuing Certificate (2018
Order) that approved the Spire STL
Pipeline Project.1 On September 14,
2021, and December 3, 2021, the
Commission issued temporary
certificates of public convenience and
necessity to Spire to continue to operate
the facilities constructed under the
earlier terms, conditions, and
authorizations, including Spire’s tariff.
On remand, the Commission will
evaluate Spire’s pending certificate
application,2 and consider whether to
grant a certificate of public convenience
and necessity to Spire to continue
operation of the Spire STL Pipeline
Project in Illinois and Missouri.
The Commission must determine
whether the project is in the public
convenience and necessity under the
Natural Gas Act, taking into
consideration the factors discussed in
the Court’s decision. The supplemental
EIS will tier off Commission staff’s
1 Environmental Defense Fund v. FERC, 2 F.4th
953 (D.C. Cir. 2021).
2 Following the D.C. Circuit’s vacatur and remand
of the Commission’s 2018 Order, Spire’s January 26,
2017 application for a certificate of public
convenience and necessity to construct and operate
the Spire STL Pipeline Project is again pending
before the Commission.
E:\FR\FM\23DEN1.SGM
23DEN1
Agencies
[Federal Register Volume 86, Number 244 (Thursday, December 23, 2021)]
[Notices]
[Pages 72942-72943]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-27871]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG22-28-000.
Applicants: Northern Wind Energy Redevelopment, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Northern Wind Energy Redevelopment, LLC.
Filed Date: 12/16/21.
Accession Number: 20211216-5212.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22-29-000.
Applicants: Red Barn Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Red Barn Energy, LLC.
Filed Date: 12/16/21.
Accession Number: 20211216-5224.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22-30-000.
Applicants: Rock Aetna Power Partners, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Rock Aetna Power Partners, LLC.
Filed Date: 12/16/21.
Accession Number: 20211216-5225.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: EG22-31-000.
Applicants: Arrow Canyon Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Arrow Canyon Solar, LLC.
Filed Date: 12/17/21.
Accession Number: 20211217-5235.
Comment Date: 5 p.m. ET 1/7/22.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-1821-004.
Applicants: Panda Stonewall LLC.
Description: Refund Report: Potomac Energy Center, LLC submits
tariff filing per 35.19a(b): Refund Report to be effective N/A.
Filed Date: 12/17/21.
Accession Number: 20211217-5107.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER20-1418-001.
Applicants: Pacific Gas and Electric Company.
Description: Compliance filing: FERC Order No. 864 TO Tariff Second
Compliance Filing to be effective 1/27/2020.
[[Page 72943]]
Filed Date: 12/17/21.
Accession Number: 20211217-5000.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-226-001.
Applicants: Avista Corporation.
Description: Tariff Amendment: First Amendment to OATT revisions
for EIM Entry, Att M to be effective 2/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5199.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-333-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: NorthWestern (South Dakota)
Amendment to Formula Rate Tariff filing to be effective 1/3/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5232.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-667-000.
Applicants: Mulligan 3 Wind LLC.
Description: Petiton for Limited Waiver of Mulligan 3 Wind LLC.
Filed Date: 12/15/21.
Accession Number: 20211215-5308.
Comment Date: 5 p.m. ET 12/27/21.
Docket Numbers: ER22-673-000.
Applicants: San Diego Gas & Electric Company.
Description: Sec. 205(d) Rate Filing: 2022 TACBAA Update to be
effective 1/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5001.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-674-000.
Applicants: San Diego Gas & Electric Company.
Description: Sec. 205(d) Rate Filing: 2022 RS Filing to be
effective 1/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5002.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-675-000.
Applicants: New York State Reliability Counsel, L.L.C.
Description: New York State Reliability Council submits Revised
Install Capacity Requirement for the New York Control Area for the
period Beginning May 1, 2021 ending April 30, 2022.
Filed Date: 12/16/21.
Accession Number: 20211216-5247.
Comment Date: 5 p.m. ET 1/6/22.
Docket Numbers: ER22-676-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original SA No. 6261,
Dynamic Schedule Agreement between PJM and NIPSCO to be effective 12/1/
2021.
Filed Date: 12/17/21.
Accession Number: 20211217-5060.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-677-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Initial Filing of Rate
Schedule No. 338 to be effective 11/17/2021.
Filed Date: 12/17/21.
Accession Number: 20211217-5170.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-678-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Tariff Amendment: Notice of Cancellation of Rate
Schedule No. 81 to be effective 11/17/2021.
Filed Date: 12/17/21.
Accession Number: 20211217-5171.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-680-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: WDAT Enhancements 2021 to be
effective 2/16/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5222.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-681-000.
Applicants: Exelon Generation Company, LLC.
Description: Sec. 205(d) Rate Filing: Filing of Letter Agreement
to be effective 1/25/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5292.
Comment Date: 5 p.m. ET 1/7/22.
Docket Numbers: ER22-682-000.
Applicants: Duke Energy Progress, LLC.
Description: Sec. 205(d) Rate Filing: DEP-NCEMPA--Revisions to
Rate Schedule No. 200 to be effective 3/1/2022.
Filed Date: 12/17/21.
Accession Number: 20211217-5303.
Comment Date: 5 p.m. ET 1/7/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-27871 Filed 12-22-21; 8:45 am]
BILLING CODE 6717-01-P