Download as PDF Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices jspears on DSK121TN23PROD with NOTICES1 ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP21–44–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR part 385.214). Motions to intervene are more fully described at https://www.ferc.gov/ferconline/ferc-online/how-guides. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Questions? Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: December 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–27870 Filed 12–22–21; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 20:50 Dec 22, 2021 Jkt 256001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–26–000] Northern Natural Gas Company; Notice of Application and Establishing Intervention Deadline Take notice that on December 3, 2021, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, NE 68124, filed an application under sections 7(c) and 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authorization to: (1) Abandon in-place and by removal the A-line and associated branch line, tie-over piping and aboveground facilities; and (2) install and operate the replacement North C-line Extension and South Cline Extension and associated branch line, tie-over piping and aboveground facilities, all with appurtenances and all located in Boone, Dallas and Polk counties in Iowa. Specifically, Northern proposes to abandon approximately 29.63 miles of its 16-inch-diameter Des Moines IAB65001 A-line (A-line) and appurtenances in Boone, Dallas and Polk counties, Iowa. Northern also requests authorization to construct and operate an approximately 9.07-mile extension of its 20-inch-diameter Des Moines IAB65003 C-line (C-line) and appurtenances in Boone, Dallas and Polk counties, Iowa, to replace the capacity associated with the abandoned A-line. Northern estimates the cost of the project to be $36,981,705, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 72937 Any questions regarding the proposed project should be directed to Michael T. Loeffler, Senior Director of Certificates and External Affairs for Northern, 1111 South 103rd Street, Omaha, NE 68124, by telephone at (402) 398–7103, or by email at mike.loeffler@nngco.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: Complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are two ways to become involved in the Commission’s review of this project: You can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on January 7, 2022. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before January 7, 2022. There are three methods you can use to submit your comments to the Commission. In all instances, please reference the Project docket number CP22–26–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy 1 18 E:\FR\FM\23DEN1.SGM CFR 157.9. 23DEN1 72938 Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address below.2 Your written comments must reference the Project docket number (CP22–26–000). Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. jspears on DSK121TN23PROD with NOTICES1 Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,3 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is January 7, 2022. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. [For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene.] For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP22–26–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below.6 Your motion to intervene must reference the Project docket number CP22–26–000. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: 1111 South 103rd Street, Omaha, NE 68124 or at mike.loeffler@ nngco.com. Any subsequent submissions by an intervenor must be served on the applicant and all other 4 18 2 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 3 18 CFR 385.102(d). VerDate Sep<11>2014 20:50 Dec 22, 2021 Jkt 256001 CFR 385.214. CFR 157.10. 6 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 5 18 PO 00000 Frm 00022 Fmt 4703 Sfmt 9990 parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at https:// www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on January 7, 2022. Dated: December 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–27867 Filed 12–22–21; 8:45 am] BILLING CODE 6717–01–P 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). E:\FR\FM\23DEN1.SGM 23DEN1

Agencies

[Federal Register Volume 86, Number 244 (Thursday, December 23, 2021)]
[Notices]
[Pages 72937-72938]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-27867]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-26-000]


Northern Natural Gas Company; Notice of Application and 
Establishing Intervention Deadline

    Take notice that on December 3, 2021, Northern Natural Gas Company 
(Northern), 1111 South 103rd Street, Omaha, NE 68124, filed an 
application under sections 7(c) and 7(b) of the Natural Gas Act (NGA), 
and Part 157 of the Commission's regulations requesting authorization 
to: (1) Abandon in-place and by removal the A-line and associated 
branch line, tie-over piping and aboveground facilities; and (2) 
install and operate the replacement North C-line Extension and South 
Cline Extension and associated branch line, tie-over piping and 
aboveground facilities, all with appurtenances and all located in 
Boone, Dallas and Polk counties in Iowa. Specifically, Northern 
proposes to abandon approximately 29.63 miles of its 16-inch-diameter 
Des Moines IAB65001 A-line (A-line) and appurtenances in Boone, Dallas 
and Polk counties, Iowa. Northern also requests authorization to 
construct and operate an approximately 9.07-mile extension of its 20-
inch-diameter Des Moines IAB65003 C-line (C-line) and appurtenances in 
Boone, Dallas and Polk counties, Iowa, to replace the capacity 
associated with the abandoned A-line. Northern estimates the cost of 
the project to be $36,981,705, all as more fully set forth in the 
application which is on file with the Commission and open for public 
inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Michael T. Loeffler, Senior Director of Certificates and External 
Affairs for Northern, 1111 South 103rd Street, Omaha, NE 68124, by 
telephone at (402) 398-7103, or by email at [email protected].
    Pursuant to Section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: Complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.9.
---------------------------------------------------------------------------

Public Participation

    There are two ways to become involved in the Commission's review of 
this project: You can file comments on the project, and you can file a 
motion to intervene in the proceeding. There is no fee or cost for 
filing comments or intervening. The deadline for filing a motion to 
intervene is 5:00 p.m. Eastern Time on January 7, 2022.

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be. To ensure that your comments 
are timely and properly recorded, please submit your comments on or 
before January 7, 2022.
    There are three methods you can use to submit your comments to the 
Commission. In all instances, please reference the Project docket 
number CP22-26-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy

[[Page 72938]]

method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; first select ``General'' and then select ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address below.\2\ Your written comments must reference 
the Project docket number (CP22-26-000).
---------------------------------------------------------------------------

    \2\ Hand delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426

    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\3\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is January 7, 2022. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. [For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene.] For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP22-26-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below.\6\ 
Your motion to intervene must reference the Project docket number CP22-
26-000.
---------------------------------------------------------------------------

    \6\ Hand delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426

    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected]
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: 1111 South 
103rd Street, Omaha, NE 68124 or at [email protected]. Any 
subsequent submissions by an intervenor must be served on the applicant 
and all other parties to the proceeding. Contact information for 
parties can be downloaded from the service list at the eService link on 
FERC Online.
    All timely, unopposed \7\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \7\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \8\ 18 CFR 385.214(c)(1).
    \9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on January 7, 2022.

    Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-27867 Filed 12-22-21; 8:45 am]