Combined Notice of Filings, 72956-72957 [2021-27864]
Download as PDF
72956
Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices
(1902–TBD) in the subject line. Your
comments should be sent within 30
days of publication of this notice in the
Federal Register. OMB submissions
must be formatted and filed in
accordance with submission guidelines
at www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review field,’’ select
Federal Energy Regulatory Commission;
click ‘‘submit’’ and select ‘‘comment’’ to
the right of the subject collection.
For assistance with any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: December 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27778 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ID–9353–000]
jspears on DSK121TN23PROD with NOTICES1
Notice of Filing; Smita N. Shah, P.E.
Take notice that on December 10,
2021, Smita N. Shah, P.E. submitted for
filing, application for authority to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d (b) and Part 45.8 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR part
45.8.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
VerDate Sep<11>2014
20:50 Dec 22, 2021
Jkt 256001
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Time on January 3, 2022.
Dated: December 16, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27781 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM16–17–000]
Data Collection for Analytics and
Surveillance and Market-Based Rate
Purposes; Notice on Upcoming
Triennial Filings
Notice is hereby given that triennial
filings remain due in accordance with
the schedule established in Appendix D
to Order No. 697–A.1 Pursuant to Order
No. 860,2 after February 1, 2022,
1 Mkt.-Based Rates for Wholesale Sales of Elec.
Energy, Capacity & Ancillary Servs. by Pub. Utils.,
Order No. 697, 119 FERC ¶ 61,295, at P 540,
clarified, 121 FERC ¶ 61,260 (2007), order on reh’g,
Order No. 697–A, 123 FERC ¶ 61,055, at app. D,
clarified, 124 FERC ¶ 61,055, order on reh’g, Order
No. 697–B, 125 FERC ¶ 61,326 (2008), order on
reh’g, Order No. 697–C, 127 FERC ¶ 61,284 (2009),
order on reh’g, Order No. 697–D, 130 FERC ¶ 61,206
(2010), aff’d sub nom. Mont. Consumer Counsel v.
FERC, 659 F.3d 910 (9th Cir. 2011).
2 Data Collection for Analytics & Surveillance and
Mkt.-Based Rate Purposes, Order No. 860, 168
FERC ¶ 61,039 (2019), order on reh’g, Order No.
860–A, 170 FERC ¶ 61,129 (2020).
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Sellers 3 will submit market power
analyses into the market-based rate
relational database. For triennial filings
due in December 2021, Sellers should
continue to submit indicative screens
and asset appendices in electronic
spreadsheet format through the eFiling
system.
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27866 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–422–000.
Applicants: Texas Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Agency
Agreement Option Filing to be effective
1/16/2022.
Filed Date: 12/16/21.
Accession Number: 20211216–5131.
Comment Date: 5 p.m. ET 12/28/21.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
3 A Seller is defined as any person that has
authorization to or seeks authorization to engage in
sales for resale of electric energy, capacity or
ancillary services at market-based rates under
section 205 of the Federal Power Act. 18 CFR
35.36(a)(1) (2021); 16 U.S.C. 824d.
E:\FR\FM\23DEN1.SGM
23DEN1
Federal Register / Vol. 86, No. 244 / Thursday, December 23, 2021 / Notices
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–27864 Filed 12–22–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–27–000]
jspears on DSK121TN23PROD with NOTICES1
Gas Transmission Northwest LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on December 6, 2021,
Gas Transmission Northwest LLC (GTN)
filed a prior notice request for
authorization, in accordance with 18
CFR Sections 157.205, 157.208 and
157.210 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
and GTN’s blanket certificate issued in
Docket Nos. CP82–530–000, et al., to
conduct hydrostatic testing along it’s ALine and subsequently restore its
original Maximum Allowable Operating
Pressure of those sections located in
Boundary and Bonner Counties, Idaho.
GTN states that the proposed testing
will have no impact on GTN’s existing
customers. GTN states that the restored
MAOP will alleviate operational
constraints and improve line pack
management, which will ultimately
improve reliability and flexibility of
GTN’s system. GTN estimates that the
cost of the Project is approximately $22
million. GTN states that the proposed
MAOP restoration will not change
available capacity on GTN’s system, all
as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
VerDate Sep<11>2014
20:50 Dec 22, 2021
Jkt 256001
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Gas Transmission
Northwest LLC, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700,
at (832) 320–5477; or email at david_
alonzo@tcenergy.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on February 14, 2022.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
1 18
CFR (Code of Federal Regulations) 157.9.
CFR 157.205.
3 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 18
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
72957
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is February
14, 2022. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is February 14,
2022. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
4 18
CFR 157.205(e).
CFR 385.214.
6 18 CFR 157.10.
5 18
E:\FR\FM\23DEN1.SGM
23DEN1
Agencies
[Federal Register Volume 86, Number 244 (Thursday, December 23, 2021)]
[Notices]
[Pages 72956-72957]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-27864]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22-422-000.
Applicants: Texas Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Agency Agreement Option Filing
to be effective 1/16/2022.
Filed Date: 12/16/21.
Accession Number: 20211216-5131.
Comment Date: 5 p.m. ET 12/28/21.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 72957]]
Dated: December 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-27864 Filed 12-22-21; 8:45 am]
BILLING CODE 6717-01-P