Sunshine Act Meetings, 71253-71254 [2021-27156]
Download as PDF
Federal Register / Vol. 86, No. 238 / Wednesday, December 15, 2021 / Notices
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: 2020/22 Beginning
Postsecondary Students (BPS:20/22)
Field Test.
OMB Control Number: 1850–0631.
Type of Review: Revision of a
currently approved collection.
Respondents/Affected Public:
Individual or Households.
Total Estimated Number of Annual
Responses: 25,610.
Total Estimated Number of Annual
Burden Hours: 12,544.
Abstract: The 2020/22 Beginning
Postsecondary Students Full-Scale
(BPS:20/22) is conducted by the
National Center for Education Statistics,
part of the Institute of Education
Sciences, within the Department of
Education, and is part of the Beginning
Postsecondary Students Longitudinal
Study data collection program at https://
nces.ed.gov/surveys/bps/. The BPS:20/
22 Full-scale Data Collection will begin
03/01/22 and end 11/11/22. BPS is
designed to follow a cohort of students
who enroll in postsecondary education
for the first time during the same
academic year, irrespective of the date
of high school completion. The study
collects data on students’ persistence in
and completion of postsecondary
education programs; their transition to
employment; demographic
characteristics; and changes over time in
their goals, marital status, income, and
debt, among other indicators. Data from
BPS are used to help researchers and
policymakers better understand how
financial aid influences persistence and
completion, what percentages of
students complete various degree
programs, what are the early
employment and wage outcomes for
certificate and degree attainers, and why
students leave school. BPS:20/22 will be
a nationally-representative sample of
approximately 37,000 students who
were first-time beginning students
during the 2019–20 academic year. The
BPS:20/22 field test included
approximately 3,700 students who first
began in the 2018–19 academic year.
These students will be asked to
complete a survey and administrative
data will also be collected for them.
Administrative data matching will be
conducted with sources including the
National Student Loan Data System
(NSLDS), containing federal loan and
grant files; the Central Processing
System (CPS), which houses and
processes data contained in the Free
Application for Federal Student Aid
(FAFSA) forms; the National Student
Clearinghouse (NSC) which provides
enrollment and degree verification;
vendors of national undergraduate,
graduate, and professional student
admission tests; and possible other
administrative data sources such as the
Veterans Benefits Administration
(VBA). These data will be obtained
through file matching/downloading. In
addition, this request includes
conducting panel maintenance activities
for the BPS:20/25 field test sample.
BPS:20/25 is anticipated but has not yet
been authorized. This submission
covers BPS:20/22 full-scale materials
and procedures required for conducting
the student survey and for matching
data to administrative records. Along
with this full-scale package NCES will
provide the Office of Management and
Budget (OMB) with a memorandum
summarizing changes from the field test
for the full-scale data collection. The
materials for the BPS:20/22 full-scale
study are based upon the field test
materials. This submission is designed
to adequately justify the need for and
overall practical utility of the full study,
presenting the overarching plan for all
of the phases of the data collection and
providing as much detail about the
measures to be used as is available at
the time of this submission. As part of
the completed field test, NCES
published a notice in the Federal
Register allowing first a 60- and then a
30-day public comment period. Field
test materials, procedures, and results
have informed this request for clearance
for the full-scale study. For this fullscale study NCES will publish a notice
in the Federal Register allowing an
additional 30-day public comment
period on the final details of the
BPS:20/22 full-scale study.
Dated: December 9, 2021.
Stephanie Valentine,
PRA Coordinator, Strategic Collections and
Clearance, Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2021–27084 Filed 12–14–21; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings
December 16, 2021,
10:00 a.m.
PLACE: Open to the public via audio
Webcast only. Join FERC online to listen
live at https://ferc.capitolconnection.org/.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE—Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://elibrary.ferc.gov/
eLibrary/search using the eLibrary link.
TIME AND DATE:
1085TH MEETING—OPEN MEETING
[December 16, 2021, 10:00 a.m.]
khammond on DSKJM1Z7X2PROD with NOTICES
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 ...........
A–2 ...........
AD22–1–000 ...............................................
AD22–2–000 ...............................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
ELECTRIC
E–1 ...........
VerDate Sep<11>2014
RM20–16–000 ............................................
17:04 Dec 14, 2021
Jkt 256001
PO 00000
Managing Transmission Line Ratings.
Frm 00028
Fmt 4703
Sfmt 4703
71253
E:\FR\FM\15DEN1.SGM
15DEN1
71254
Federal Register / Vol. 86, No. 238 / Wednesday, December 15, 2021 / Notices
1085TH MEETING—OPEN MEETING—Continued
[December 16, 2021, 10:00 a.m.]
Item No.
Docket No.
Company
E–2 ...........
RM22–5–000 ..............................................
E–3
E–4
E–5
E–6
...........
...........
...........
...........
EL21–77–000 .............................................
ER21–1225–003 .........................................
Omitted.
ER21–2965–000, ER21–2965–001 ............
Rate Recovery, Reporting, and Accounting Treatment of Industry Association Dues
and Certain Civic, Political, and Related Expenses.
Tenaska Clear Creek Wind, LLC v. Southwest Power Pool, Inc.
Long Ridge Energy Generation LLC.
E–7 ...........
E–8 ...........
E–9 ...........
E–10 .........
E–11 .........
ER21–1635–002 .........................................
QF21–1213–000 .........................................
ER21–142–000 ...........................................
ER22–187–000 ...........................................
ER10–2564–011 .........................................
ER10–2600–011 .........................................
ER10–2289–011 .........................................
EL22–5–000 ...............................................
Omitted.
ER21–1772–001 .........................................
ER21–1774–001 .........................................
ER21–1775–001 .........................................
ER21–2676–000 .........................................
ER21–2677–000 (not consolidated) ...........
EL17–89–000 .............................................
E–12 .........
E–13 .........
E–14 .........
EL19–60–000 (consolidated) ......................
E–15 .........
E–16 .........
ER20–2471–003 .........................................
EL21–100–000 ...........................................
E–17 .........
EL21–60–000 .............................................
QF21–480–001 ...........................................
QF21–481–001, QF21–482–001, QF21–
483–001.
PJM Interconnection, L.L.C., Atlantic City Electric Company, Delmarva Power & Light
Company, and PECO Energy Company.
PJM Interconnection, L.L.C.
Gallatin Power Partners, LLC.
System Energy Resources, Inc.
Smoky Mountain Transmission LLC.
Tucson Electric Power Company.
UNS Electric, Inc.
UniSource Energy Development Company.
Tucson Electric Power Company.
PacifiCorp.
Sierra Pacific Power Company.
Nevada Power Company.
Southwest Power Pool, Inc.
Midcontinent Independent System Operator, Inc.
American Electric Power Service Corporation v. Midcontinent Independent System
Operator, Inc. and Southwest Power Pool, Inc.
City of Prescott, Arkansas v. Southwestern Electric Power Company and
Midcontinent Independent System Operator, Inc.
NedPower Mount Storm, LLC.
Nebraska Public Power District v. Tri-State Generation and Transmission Association,
Inc., and Southwest Power Pool, Inc.
Arcadia Solar, LLC and WGL Georgia Project Group, LLC.
Arcadia Solar, LLC.
WGL Georgia Project Group, LLC.
GAS
G–1 ..........
IN17–4–000 ................................................
Rover Pipeline LLC and Energy Transfer Partners, L.P.
HYDRO
H–1
H–2
H–3
H–4
H–5
H–6
...........
...........
...........
...........
...........
...........
RM20–9–000 ..............................................
P–2042–191 ...............................................
P–2411–029 ...............................................
P–2570–033 ...............................................
P–2088–083 ...............................................
P–943–134 .................................................
Safety of Water Power Projects and Project Works.
Public Utility District No. 1 of Pend Oreille County, Washington.
City of Danville, STS Hydropower, LLC, and Eagle Creek Schoolfield, LLC.
AEP Generation Resources Inc. and Eagle Creek Racine Hydro, LLC.
South Feather Water and Power Agency.
Public Utility District No. 1 of Chelan County, Washington.
Certificates
C–1
C–2
C–3
C–4
...........
...........
...........
...........
khammond on DSKJM1Z7X2PROD with NOTICES
C–5 ...........
CP17–458–010 ...........................................
CP17–458–011 ...........................................
CP17–458–012 ...........................................
CP15–558–000, CP19–78–000, CP20–47–
000.
CP17–494–004 ...........................................
CP17–495–004 ...........................................
The public is invited to listen to the
meeting live at https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to hear
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its audio
webcast. The Capitol Connection
provides technical support for this free
audio webcast. It will also offer access
VerDate Sep<11>2014
17:04 Dec 14, 2021
Jkt 256001
Midship Pipeline Company, LLC.
Midship Pipeline Company, LLC.
Midship Pipeline Company, LLC.
PennEast Pipeline Company, LLC.
Pacific Connector Gas Pipeline, LP.
Jordan Cove Energy Project L.P.
to this event via phone bridge for a fee.
If you have any questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
DEPARTMENT OF ENERGY
Issued: December 9, 2021.
Kimberly D. Bose,
Secretary.
Combined Notice of Filings #1
[FR Doc. 2021–27156 Filed 12–13–21; 4:15 pm]
BILLING CODE 6717–01–P
PO 00000
Federal Energy Regulatory
Commission
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–1115–004.
Frm 00029
Fmt 4703
Sfmt 4703
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 86, Number 238 (Wednesday, December 15, 2021)]
[Notices]
[Pages 71253-71254]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-27156]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
TIME AND DATE: December 16, 2021, 10:00 a.m.
PLACE: Open to the public via audio Webcast only. Join FERC online to
listen live at https://ferc.capitolconnection.org/.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's website at https://elibrary.ferc.gov/eLibrary/search using
the eLibrary link.
1085th Meeting--Open Meeting
[December 16, 2021, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1..................... AD22-1-000...................... Agency Administrative Matters.
A-2..................... AD22-2-000...................... Customer Matters, Reliability, Security and Market
Operations.
----------------------------------------------------------------------------------------------------------------
ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1..................... RM20-16-000..................... Managing Transmission Line Ratings.
[[Page 71254]]
E-2..................... RM22-5-000...................... Rate Recovery, Reporting, and Accounting Treatment
of Industry Association Dues and Certain Civic,
Political, and Related Expenses.
E-3..................... EL21-77-000..................... Tenaska Clear Creek Wind, LLC v. Southwest Power
Pool, Inc.
E-4..................... ER21-1225-003................... Long Ridge Energy Generation LLC.
E-5..................... Omitted.........................
E-6..................... ER21-2965-000, ER21-2965-001.... PJM Interconnection, L.L.C., Atlantic City Electric
Company, Delmarva Power & Light Company, and PECO
Energy Company.
E-7..................... ER21-1635-002................... PJM Interconnection, L.L.C.
E-8..................... QF21-1213-000................... Gallatin Power Partners, LLC.
E-9..................... ER21-142-000.................... System Energy Resources, Inc.
E-10.................... ER22-187-000.................... Smoky Mountain Transmission LLC.
E-11.................... ER10-2564-011................... Tucson Electric Power Company.
ER10-2600-011................... UNS Electric, Inc.
ER10-2289-011................... UniSource Energy Development Company.
EL22-5-000...................... Tucson Electric Power Company.
E-12.................... Omitted.........................
E-13.................... ER21-1772-001................... PacifiCorp.
ER21-1774-001................... Sierra Pacific Power Company.
ER21-1775-001................... Nevada Power Company.
E-14.................... ER21-2676-000................... Southwest Power Pool, Inc.
ER21-2677-000 (not consolidated) Midcontinent Independent System Operator, Inc.
EL17-89-000..................... American Electric Power Service Corporation v.
Midcontinent Independent System Operator, Inc. and
Southwest Power Pool, Inc.
EL19-60-000 (consolidated)...... City of Prescott, Arkansas v. Southwestern Electric
Power Company and Midcontinent Independent System
Operator, Inc.
E-15.................... ER20-2471-003................... NedPower Mount Storm, LLC.
E-16.................... EL21-100-000.................... Nebraska Public Power District v. Tri-State
Generation and Transmission Association, Inc., and
Southwest Power Pool, Inc.
E-17.................... EL21-60-000..................... Arcadia Solar, LLC and WGL Georgia Project Group,
LLC.
QF21-480-001.................... Arcadia Solar, LLC.
QF21-481-001, QF21-482-001, QF21- WGL Georgia Project Group, LLC.
483-001.
----------------------------------------------------------------------------------------------------------------
GAS
----------------------------------------------------------------------------------------------------------------
G-1..................... IN17-4-000...................... Rover Pipeline LLC and Energy Transfer Partners,
L.P.
----------------------------------------------------------------------------------------------------------------
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1..................... RM20-9-000...................... Safety of Water Power Projects and Project Works.
H-2..................... P-2042-191...................... Public Utility District No. 1 of Pend Oreille
County, Washington.
H-3..................... P-2411-029...................... City of Danville, STS Hydropower, LLC, and Eagle
Creek Schoolfield, LLC.
H-4..................... P-2570-033...................... AEP Generation Resources Inc. and Eagle Creek Racine
Hydro, LLC.
H-5..................... P-2088-083...................... South Feather Water and Power Agency.
H-6..................... P-943-134....................... Public Utility District No. 1 of Chelan County,
Washington.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... CP17-458-010.................... Midship Pipeline Company, LLC.
C-2..................... CP17-458-011.................... Midship Pipeline Company, LLC.
C-3..................... CP17-458-012.................... Midship Pipeline Company, LLC.
C-4..................... CP15-558-000, CP19-78-000, CP20- PennEast Pipeline Company, LLC.
47-000.
C-5..................... CP17-494-004.................... Pacific Connector Gas Pipeline, LP.
CP17-495-004.................... Jordan Cove Energy Project L.P.
----------------------------------------------------------------------------------------------------------------
The public is invited to listen to the meeting live at https://ferc.capitolconnection.org/. Anyone with internet access who desires to
hear this event can do so by navigating to www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its audio webcast. The Capitol Connection provides technical
support for this free audio webcast. It will also offer access to this
event via phone bridge for a fee. If you have any questions, visit
https://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-
993-3104.
Issued: December 9, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-27156 Filed 12-13-21; 4:15 pm]
BILLING CODE 6717-01-P