NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2, 68689-68690 [2021-26230]

Download as PDF Federal Register / Vol. 86, No. 230 / Friday, December 3, 2021 / Notices activities associated with the use of two twin-engine helicopters (Airbus H145) for passenger excursion and sightseeing flights during the operator’s 2021–2022 season. Helicopter-supported activities include sightseeing flights and shorelandings as well as helicopter-based skiing and trekking activities. Designated pollutants brought ashore during these activities include cooking fuel and batteries that are to be used in emergency circumstances only. All materials brought shore during helicopter-based activities will be removed from the continent following each activity and measures will be taken to minimize environmental impact in the event of a release. Helicopters will only be refueled aboard the operator’s vessel and measures will be in place to prevent accidental discharge. Location: Antarctic Peninsula Region. Dates: January 1, 2022–March 31, 2022. Erika N. Davis, Program Specialist, Office of Polar Programs. [FR Doc. 2021–26290 Filed 12–2–21; 8:45 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [NRC–2021–0001] Sunshine Act Meetings Weeks of December 6, 13, 20, 27, 2021, January 3, 10, 2022. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and closed. MATTERS TO BE CONSIDERED: TIME AND DATE: Week of December 6, 2021 jspears on DSK121TN23PROD with NOTICES1 10:00 a.m. Briefing on Equal Employment Opportunity, Affirmative Employment, and Small Business (Public Meeting); (Contact: Larniece McKoy Moore: 301–415– 1942) Additional Information: The public is invited to attend the Commission’s meeting live by webcast at the Web address—https://video.nrc.gov/. For those who would like to attend in person, note that all visitors are required to complete the NRC Self-Health Assessment and Certification of Vaccination forms. Visitors who certify that they are not fully vaccinated or decline to complete the certification must have proof of a negative Food and Drug Administration-approved polymerase chain reaction (PCR) or 18:06 Dec 02, 2021 Thursday, December 9, 2021 9:00 a.m. Briefing on 10 CFR part 53 Licensing and Regulations of Advanced Nuclear Reactors (Public Meeting); (Contact: Donna Williams: 301–415–1322) Additional Information: The public is invited to attend the Commission’s meeting live by webcast at the Web address—https://video.nrc.gov/. For those who would like to attend in person, note that all visitors are required to complete the NRC Self-Health Assessment and Certification of Vaccination forms. Visitors who certify that they are not fully vaccinated or decline to complete the certification must have proof of a negative Food and Drug Administration-approved PCR or Antigen (including rapid tests) COVID– 19 test specimen collection from no later than the previous 3 days prior to entry to an NRC facility. The forms and additional information can be found here https://www.nrc.gov/about-nrc/ covid-19/guidance-for-visitors-to-nrcfacilities.pdf. Week of December 13, 2021—Tentative Jkt 256001 The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings or need this meeting notice or the transcript or other information from the public meetings in another format (e.g., braille, large print), please notify Anne Silk, NRC Disability Program Specialist, at 301–287–0745, by videophone at 240–428–3217, or by email at Anne.Silk@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Members of the public may request to receive this information electronically. If you would like to be added to the distribution, please contact the Nuclear Regulatory Commission, Office of the Secretary, Washington, DC 20555, at 301–415–1969, or by email at Tyesha.Bush@nrc.gov or Betty.Thweatt@ nrc.gov. The NRC is holding the meetings under the authority of the Government in the Sunshine Act, 5 U.S.C. 552b. Dated: December 1, 2021. For the Nuclear Regulatory Commission. Wesley W. Held, Policy Coordinator, Office of the Secretary. [FR Doc. 2021–26423 Filed 12–1–21; 4:15 pm] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Tuesday, December 14, 2021 10:00 a.m. Briefing on Security Issues (Closed Ex. 1) Week of December 20, 2021—Tentative There are no meetings scheduled for the week of December 20, 2021. Week of December 27, 2021—Tentative Tuesday, December 7, 2021 VerDate Sep<11>2014 Antigen (including rapid tests) COVID– 19 test specimen collection from no later than the previous 3 days prior to entry to an NRC facility. The forms and additional information can be found here https://www.nrc.gov/about-nrc/ covid-19/guidance-for-visitors-to-nrcfacilities.pdf. 68689 There are no meetings scheduled for the week of December 27, 2021. Week of January 3, 2022—Tentative There are no meetings scheduled for the week of January 3, 2022. Week of January 10, 2022—Tentative There are no meetings scheduled for the week of January 10, 2022. CONTACT PERSON FOR MORE INFORMATION: For more information or to verify the status of meetings, contact Wesley Held at 301–287–3591 or via email at Wesley.Held@nrc.gov. The schedule for Commission meetings is subject to change on short notice. The NRC Commission Meeting Schedule can be found on the internet at: https://www.nrc.gov/public-involve/ public-meetings/schedule.html. PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 [Docket Nos. 50–266 and 50–301; NRC– 2020–0277] NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Nuclear Regulatory Commission. ACTION: Draft supplemental environmental impact statement; public comment meetings. AGENCY: On November 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register a notice of availability of the draft plantspecific Supplement 23, Second Renewal, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG– 1437, regarding the proposed subsequent renewal of Renewed Facility Operating License Nos. DPR–24 and DPR–27 for an additional 20 years of operation for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach). The NRC is announcing two public comment webinars to receive comments on this document. The meetings will allow SUMMARY: E:\FR\FM\03DEN1.SGM 03DEN1 68690 Federal Register / Vol. 86, No. 230 / Friday, December 3, 2021 / Notices interested members of the public to submit their comments. DATES: The NRC staff will hold the webinars on the draft Supplemental Environmental Impact Statement (SEIS) on December 8, 2021 from 1:00 p.m. to 3:00 p.m. Central Time (CT) and from 5:00 p.m. to 7:00 p.m. CT. The staff will present the preliminary findings of the draft SEIS and will receive public comments during transcribed public meetings. Members of the public are invited to continue to submit written comments by January 3, 2022. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal Rulemaking website: • Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2020–0277. Address questions about Docket IDs to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: Office of Administration, Mail Stop: TWFN–7– A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, ATTN: Program Management, Announcements and Editing Staff. • Email comments to: PointBeachSLRSEIS@nrc.gov. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Phyllis M. Clark, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–6447; email: Phyllis.Clark@ nrc.gov. SUPPLEMENTARY INFORMATION: jspears on DSK121TN23PROD with NOTICES1 I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2020– 0277 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2020–0277. VerDate Sep<11>2014 18:06 Dec 02, 2021 Jkt 256001 • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to PDR.Resource@nrc.gov. Draft plantspecific Supplement 23, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG– 1437, is available in ADAMS under Accession No. ML21306A226. • NRC’s PDR: You may examine and purchase copies of public documents, by appointment, at the NRC’s PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays. • Project Website: Information related to the Point Beach second license renewal can be accessed on the NRC’s Point Beach website at https:// www.nrc.gov/reactors/operating/ licensing/renewal/applications/pointbeach-subsequent.html. Under the section titled ‘‘Public Involvement,’’ click on the date of the ‘‘Draft Report.’’ • Public Library: A copy of draft plant-specific Supplement 23, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG– 1437, is available at the following location (library access and hours are determined by local policy): Æ Lester Public Library, 1001 Adams Street, Two Rivers, WI 54241. B. Submitting Comments The NRC encourages electronic comment submission through the Federal Rulemaking website (https:// www.regulations.gov). Please include Docket ID NRC–2020–0277 in your comment submission. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, you should PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Meeting Information On November 9, 2021, the NRC published in the Federal Register (86 FR 62220) a notice of availability of the draft plant-specific Supplement 23, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG– 1437, regarding the proposed subsequent renewal of Point Beach and requested public comments on this document. The NRC is announcing that the NRC staff will hold two public webinars. The webinars will include a telephone line for members of the public to provide comments. A court reporter will transcribe all comments received during the webinars. To be considered, comments must be provided either at the transcribed public meeting or in writing, as discussed in the ADDRESSES section of this notice. The public webinars will be held on December 8, 2021, from 1:00 p.m. to 3:00 p.m. CT and from 5:00 p.m. to 7:00 p.m. CT. Persons interested in attending these webinars should monitor the NRC’s Public Meeting Schedule website at https://www.nrc.gov/pmns/mtg for additional information, agenda for the meetings, and access information for the webinars. Please contact Ms. Phyllis Clark no later than December 6, 2021, if accommodations or special equipment is needed to attend or to provide comments, so that the NRC staff can determine whether the request can be accommodated. Dated: November 29, 2021. For the Nuclear Regulatory Commission. Robert B. Elliott, Chief, Environmental Review License Renewal Branch, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety, and Safeguards. [FR Doc. 2021–26230 Filed 12–2–21; 8:45 am] BILLING CODE 7590–01–P POSTAL REGULATORY COMMISSION [Docket Nos. CP2020–82; MC2022–25 and CP2022–27] New Postal Product Postal Regulatory Commission. Notice. AGENCY: ACTION: E:\FR\FM\03DEN1.SGM 03DEN1

Agencies

[Federal Register Volume 86, Number 230 (Friday, December 3, 2021)]
[Notices]
[Pages 68689-68690]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-26230]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-266 and 50-301; NRC-2020-0277]


NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit 
Nos. 1 and 2

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft supplemental environmental impact statement; public 
comment meetings.

-----------------------------------------------------------------------

SUMMARY: On November 9, 2021, the U.S. Nuclear Regulatory Commission 
(NRC) published in the Federal Register a notice of availability of the 
draft plant-specific Supplement 23, Second Renewal, to the Generic 
Environmental Impact Statement (GEIS) for License Renewal of Nuclear 
Plants, NUREG-1437, regarding the proposed subsequent renewal of 
Renewed Facility Operating License Nos. DPR-24 and DPR-27 for an 
additional 20 years of operation for Point Beach Nuclear Plant, Unit 
Nos. 1 and 2 (Point Beach). The NRC is announcing two public comment 
webinars to receive comments on this document. The meetings will allow

[[Page 68690]]

interested members of the public to submit their comments.

DATES: The NRC staff will hold the webinars on the draft Supplemental 
Environmental Impact Statement (SEIS) on December 8, 2021 from 1:00 
p.m. to 3:00 p.m. Central Time (CT) and from 5:00 p.m. to 7:00 p.m. CT. 
The staff will present the preliminary findings of the draft SEIS and 
will receive public comments during transcribed public meetings. 
Members of the public are invited to continue to submit written 
comments by January 3, 2022. Comments received after this date will be 
considered if it is practical to do so, but the NRC is able to ensure 
consideration only for comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal Rulemaking website:
     Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2020-0277. Address 
questions about Docket IDs to Stacy Schumann; telephone: 301-415-0624; 
email: [email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
     Email comments to: [email protected]. For 
additional direction on obtaining information and submitting comments, 
see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Phyllis M. Clark, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-6447; email: 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2020-0277 when contacting the NRC 
about the availability of information regarding this document. You may 
obtain publicly available information related to this action by any of 
the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2020-0277.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. Draft plant-specific Supplement 23, 
Second Renewal, to the GEIS for License Renewal of Nuclear Plants, 
NUREG-1437, is available in ADAMS under Accession No. ML21306A226.
     NRC's PDR: You may examine and purchase copies of public 
documents, by appointment, at the NRC's PDR, Room P1 B35, One White 
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make 
an appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 
8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal 
holidays.
     Project Website: Information related to the Point Beach 
second license renewal can be accessed on the NRC's Point Beach website 
at https://www.nrc.gov/reactors/operating/licensing/renewal/applications/point-beach-subsequent.html. Under the section titled 
``Public Involvement,'' click on the date of the ``Draft Report.''
     Public Library: A copy of draft plant-specific Supplement 
23, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, 
NUREG-1437, is available at the following location (library access and 
hours are determined by local policy):
    [cir] Lester Public Library, 1001 Adams Street, Two Rivers, WI 
54241.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal Rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2020-0277 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Meeting Information

    On November 9, 2021, the NRC published in the Federal Register (86 
FR 62220) a notice of availability of the draft plant-specific 
Supplement 23, Second Renewal, to the GEIS for License Renewal of 
Nuclear Plants, NUREG-1437, regarding the proposed subsequent renewal 
of Point Beach and requested public comments on this document. The NRC 
is announcing that the NRC staff will hold two public webinars. The 
webinars will include a telephone line for members of the public to 
provide comments. A court reporter will transcribe all comments 
received during the webinars. To be considered, comments must be 
provided either at the transcribed public meeting or in writing, as 
discussed in the ADDRESSES section of this notice. The public webinars 
will be held on December 8, 2021, from 1:00 p.m. to 3:00 p.m. CT and 
from 5:00 p.m. to 7:00 p.m. CT. Persons interested in attending these 
webinars should monitor the NRC's Public Meeting Schedule website at 
https://www.nrc.gov/pmns/mtg for additional information, agenda for the 
meetings, and access information for the webinars. Please contact Ms. 
Phyllis Clark no later than December 6, 2021, if accommodations or 
special equipment is needed to attend or to provide comments, so that 
the NRC staff can determine whether the request can be accommodated.

    Dated: November 29, 2021.

    For the Nuclear Regulatory Commission.
Robert B. Elliott,
Chief, Environmental Review License Renewal Branch, Division of 
Rulemaking, Environmental, and Financial Support, Office of Nuclear 
Material Safety, and Safeguards.
[FR Doc. 2021-26230 Filed 12-2-21; 8:45 am]
BILLING CODE 7590-01-P