Combined Notice of Filings, 67046-67047 [2021-25671]
Download as PDF
67046
Federal Register / Vol. 86, No. 224 / Wednesday, November 24, 2021 / Notices
Form 3-Q (Electric)
221
3
663
168
$14,616
111,384
$9,690,408
$43,848
orm 3-QT (Electric)
221
3
663
0
$0
0
$0
$0
111,384
$9,690,408
Total
$43,848
Form 3-Q (Gas)
Form 3-QT(Gas)
147
3
147
3
441
167
$14,529
73,647
$6,407,289
$43,587
441
0
$0
0
$0
$0
73,647
$6,407,289
Total
VerDate Sep<11>2014
18:12 Nov 23, 2021
Jkt 256001
Dated: November 18, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–25683 Filed 11–23–21; 8:45 am]
BILLING CODE 6717–01–C
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19–491–001.
Applicants: National Fuel Gas Supply
Corporation.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Description: Request for Approval of
Capacity Lease Agreement Amendment
between National Fuel Gas Supply
Corporation under CP19–491 and
Transcontinental Gas Pipe Line
Company, LLC.
Filed Date: 11/17/2021.
Accession Number: 20211117–5159.
Comment Date: 5 p.m. ET 11/23/21.
Docket Numbers: RP22–327–000.
Applicants: National Fuel Gas
Supply Corporation.
Description: Compliance filing:
TSCA—Informational Filing (November
2021) to be effective N/A.
Filed Date: 11/18/21.
Accession Number: 20211118–5049.
Comment Date: 5 p.m. ET 11/30/21.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
E:\FR\FM\24NON1.SGM
24NON1
EN24NO21.061
For the FERC Form 3–Q (electric and
natural gas), the total average annual
burden hours is 185,031, and the total
annual cost is $16,097,697.
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility, and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
of information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
EN24NO21.060
khammond on DSKJM1Z7X2PROD with NOTICES
$43,587
Federal Register / Vol. 86, No. 224 / Wednesday, November 24, 2021 / Notices
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22–328–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: Compliance filing:
Sierrita Operational Purchase and Sales
Report 2021 to be effective N/A.
Filed Date: 11/18/21.
Accession Number: 20211118–5079.
Comment Date: 5 p.m. ET 11/30/21.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 18, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
by the U.S. National Park Service and
the Mount Baker National Forest
administered by the U.S. Forest Service.
A Final Environmental Assessment
(FEA) has been prepared as part of
staff’s review of the proposal.1 The FEA
contains the Commission staff’s analysis
of the probable environmental effects of
the proposed action and concludes that
approval of the proposal, with
Commission staff’s recommended
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
The FEA may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (P–553) in the
docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–8659.
Dated: November 18, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–25682 Filed 11–23–21; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2021–25671 Filed 11–23–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–474–000]
[Project No. 553–238]
khammond on DSKJM1Z7X2PROD with NOTICES
City of Seattle, Washington; Notice of
Availability of Final Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application
submitted by the City of Seattle,
Washington to construct a replacement
fuel dock and associated infrastructure
at Diablo Lake at the Skagit River Project
No. 553. The Skagit River Project is
located on the Skagit River in
Snohomish, Skagit, and Whatcom
counties, Washington. The project
occupies a portion of the Ross Lake
National Recreation Area administered
VerDate Sep<11>2014
17:05 Nov 23, 2021
Jkt 256001
Rover Pipeline LLC; Notice of
Schedule for Environmental Review of
the North Coast Interconnect Project
On July 20, 2021, Rover Pipeline LLC
(Rover) filed an application in Docket
No. CP21–474 requesting a Certificate of
Public Convenience and Necessity
pursuant to Section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the North
Coast Interconnect Project (Project),
whereby Rover would construct and
operate a new delivery point on Rover’s
mainline in Seneca County, Ohio. The
1 On July 16, 2020, the Council on Environmental
Quality (CEQ) issued a final rule, Update to the
Regulations Implementing the Procedural
Provisions of the National Environmental Policy Act
(Final Rule, 85 FR 43,304), which was effective as
of September 14, 2020; however, the NEPA review
of this project was in process at that time and was
prepared pursuant to CEQ’s 1978 NEPA regulations.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
67047
Rover-North Coast Interconnect would
receive up to 108,000 dekatherms per
day of pipeline quality natural gas from
an interconnect with North Coast’s
gathering system.
On August 2, 2021, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—January 27, 2022
90-day Federal Authorization Decision
Deadline—April 27, 2022
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The North Coast Interconnect Project
would consist of Rover constructing and
operating a new hot tap, valve, and
approximately 140 feet of 6-inchdiameter interconnect piping to connect
the Rover Mainline B at milepost 19.5
to new metering facilities to be
constructed by North Coast Gas
Transmission.
Background
On September 8, 2021, the
Commission issued a Notice of Scoping
Period Requesting Comments on
Environmental Issues for the Proposed
North Coast Interconnect Project (NOS).
The NOS was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the
NOS, the Commission received
comments from the U.S. Fish and
Wildlife Service and the U.S.
Environmental Protection Agency. The
primary issues raised by the U.S. Fish
and Wildlife Service concerned
wetlands protection, revegetation with
pollinator species, the potential
presence of listed bat species, and the
protection of bald eagles and migratory
bird species. The U.S. Environmental
Protection Agency commented on
identifying the Project purpose and
need; and assessing impacts on
E:\FR\FM\24NON1.SGM
24NON1
Agencies
[Federal Register Volume 86, Number 224 (Wednesday, November 24, 2021)]
[Notices]
[Pages 67046-67047]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-25671]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19-491-001.
Applicants: National Fuel Gas Supply Corporation.
Description: Request for Approval of Capacity Lease Agreement
Amendment between National Fuel Gas Supply Corporation under CP19-491
and Transcontinental Gas Pipe Line Company, LLC.
Filed Date: 11/17/2021.
Accession Number: 20211117-5159.
Comment Date: 5 p.m. ET 11/23/21.
Docket Numbers: RP22-327-000.
Applicants: National Fuel Gas Supply Corporation.
Description: Compliance filing: TSCA--Informational Filing
(November 2021) to be effective N/A.
Filed Date: 11/18/21.
Accession Number: 20211118-5049.
Comment Date: 5 p.m. ET 11/30/21.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and
[[Page 67047]]
385.214) on or before 5:00 p.m. Eastern time on the specified comment
date. Protests may be considered, but intervention is necessary to
become a party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22-328-000.
Applicants: Sierrita Gas Pipeline LLC.
Description: Compliance filing: Sierrita Operational Purchase and
Sales Report 2021 to be effective N/A.
Filed Date: 11/18/21.
Accession Number: 20211118-5079.
Comment Date: 5 p.m. ET 11/30/21.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 18, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-25671 Filed 11-23-21; 8:45 am]