Combined Notice of Filings #1, 64465-64467 [2021-25174]
Download as PDF
Federal Register / Vol. 86, No. 220 / Thursday, November 18, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before December
3, 2021. However, the filing of a
comment alone will not serve to make
the filer a party to the proceeding. To
become a party, you must intervene in
the proceeding.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,4 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is December 3,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
4 18
CFR 385.102(d).
CFR 385.214.
6 18 CFR 157.10.
5 18
VerDate Sep<11>2014
17:11 Nov 17, 2021
Jkt 256001
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
How To File Comments and
Interventions
There are two ways to submit your
comments and motions to intervene to
the Commission. In all instances, please
reference the Project docket number,
CP21–465–002, in your submission. The
Commission encourages electronic filing
of submissions.
(1) You may file your comments or
motions to intervene electronically by
using the eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Comment on a Filing’’ or
‘‘Intervention’’; or
(2) You can file a paper copy of your
comments by mailing them to the
following address below. Your written
comments must reference the Project
docket number (CP21–465–002).
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
Motions to intervene must be served
on the applicants either by mail or email
(with a link to the document) at: Joey
Mahmoud, Driftwood Pipeline LLC,
1201 Louisiana Street Suite 3100,
Houston, TX 77002, joey.mahmoud@
tellurianinc.com; or Lisa M. Tonery,
Partner, Orrick, Herrington & Sutcliffe
LLP, 51 West 52nd Street, New York,
N.Y. 10019–6142, ltonery@orrick.com.
Any subsequent submissions by an
intervenor must be served on the
applicants and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
64465
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the
projects will be available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link as described above. The
eLibrary link also provides access to the
texts of all formal documents issued by
the Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on December 3, 2021.
Dated: November 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–25178 Filed 11–17–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
November 12, 2021.
Take notice that the Commission
received the following electric rate
filings:
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
E:\FR\FM\18NON1.SGM
18NON1
khammond on DSKJM1Z7X2PROD with NOTICES
64466
Federal Register / Vol. 86, No. 220 / Thursday, November 18, 2021 / Notices
Docket Numbers: ER14–2498–012;
ER14–2500–012; ER16–2462–012;
ER17–2364–006; ER19–106–005; ER21–
445–002; ER16–2643–004.
Applicants: Potomac Energy Center,
LLC, Hill Top Energy Center LLC,
Birdsboro Power LLC, St. Joseph Energy
Center, LLC, Oregon Clean Energy, LLC,
Newark Energy Center, LLC, EIF
Newark, LLC.
Description: Notice of Non-Material
Change in Status of EIF Newark, LLC, et
al.
Filed Date: 11/12/21.
Accession Number: 20211112–5237.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER21–2652–000.
Applicants: Caddo Wind, LLC.
Description: Report Filing: Third
Supplement to Application for MarketBased Rate Authority to be effective N/
A.
Filed Date: 11/12/21.
Accession Number: 20211112–5222.
Comment Date: 5 p.m. ET 11/19/21.
Docket Numbers: ER22–384–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of a Construction Agreement and
Joint Use Agreement to be effective 1/
10/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5195.
Comment Date: 5 p.m. ET 12/1/21.
Docket Numbers: ER22–385–000.
Applicants: Innovative Owner 43,
LLC.
Description: Baseline eTariff Filing:
Innovative Owner 43, LLC—Application
for Market-Based Rate Authority to be
effective 11/11/2021.
Filed Date: 11/10/21.
Accession Number: 20211110–5241.
Comment Date: 5 p.m. ET 12/1/21.
Docket Numbers: ER22–386–000.
Applicants: Portland General Electric
Company.
Description: Tariff Amendment:
Portland General Electric Company
submits tariff filing per 35.15:
NorthernGrid Funding Agreement
Termination to be effective 12/31/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5001.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–387–000.
Applicants: Crescent Ridge LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 12/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5013.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–388–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2021–11–11 PSCoES-Provisional LGIA–
657–0.0.0 to be effective 11/12/2021.
VerDate Sep<11>2014
17:11 Nov 17, 2021
Jkt 256001
Filed Date: 11/12/21.
Accession Number: 20211112–5019.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–389–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2011–11–11 PSCoES-Provisional LGIA–
658–0.0.0 to be effective 11/12/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5024.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–390–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–BREMC—Revised NITSA SA No.
367 to be effective 1/1/2022.
Filed Date: 11/12/21.
Accession Number: 20211112–5031.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–391–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc
submits its informational filing for
qualification in the Forward Capacity
Market under 2025–2026 Capacity
Commitment Period.
Filed Date: 11/9/21.
Accession Number: 20211109–5228.
Comment Date: 5 p.m. ET 11/24/21.
Docket Numbers: ER22–392–000.
Applicants: El Paso Electric Company.
Description: Compliance filing: EPE
Order No. 864 Compliance Filing to be
effective N/A.
Filed Date: 11/12/21.
Accession Number: 20211112–5115.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–393–000.
Applicants: Hardin Solar Holdings
LLC.
Description: Tariff Amendment:
Notice of Cancellation of Market-Based
Rate Tariff to be effective 1/12/2022.
Filed Date: 11/12/21.
Accession Number: 20211112–5155.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–394–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2888R5 Arkansas Electric Cooperative
Corp NITSA NOA to be effective 11/1/
2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5156.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–395–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6229; Queue No. AG1–213 to be
effective 11/1/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5158.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–396–000.
Applicants: Equilon Enterprises LLC.
Description: Tariff Amendment:
Notice of Cancellation to be effective 11/
13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5215.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–397–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
WMPA Second Amendment to Service
Agreement No. 5589; Queue No. AE2–
115 to be effective 1/8/2020.
Filed Date: 11/12/21.
Accession Number: 20211112–5238.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–398–000.
Applicants: Mesa Wind Power LLC.
Description: Compliance filing: Notice
of Succession and Revised MarketBased Rate Tariff to be effective 11/13/
2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5240.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–399–000.
Applicants: Meadow Lake Solar Park
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 1/12/2022.
Filed Date: 11/12/21.
Accession Number: 20211112–5249.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–400–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: ISO–NE and
NEPOOL; Attachment K Resource
Assumption Changes to be effective 1/
11/2022.
Filed Date: 11/12/21.
Accession Number: 20211112–5251.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–401–000.
Applicants: Florey Knob Energy LLC.
Description: Tariff Amendment:
Florey Knob Energy LLC Cancellation of
MBR Tariff to be effective 11/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5277.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–402–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing:
Section 4—Sliding Yearly Option to be
effective 12/15/2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5296.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22–403–000.
E:\FR\FM\18NON1.SGM
18NON1
Federal Register / Vol. 86, No. 220 / Thursday, November 18, 2021 / Notices
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: First
Revised Incremental Transmission
Service Agreements to be effective 12/1/
2021.
Filed Date: 11/12/21.
Accession Number: 20211112–5297.
Comment Date: 5 p.m. ET 12/3/21.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF22–121–000.
Applicants: Sonata Green Owner,
LLC.
Description: Form 556 of Sonata
Green Owner, LLC.
Filed Date: 11/12/21.
Accession Number: 20211112–5212.
Comment Date: 5 p.m. ET 12/3/21.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–25174 Filed 11–17–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–48–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Iroquois Gas Transmission System,
L.P.; Notice of Availability of The Final
Environmental Impact Statement for
The Proposed Enhancement by
Compression Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Enhancement by Compression
Project (Project), proposed by Iroquois
Gas Transmission System, L.P.
(Iroquois) in the above-referenced
VerDate Sep<11>2014
17:11 Nov 17, 2021
Jkt 256001
docket. Iroquois requests authorization
to construct and operate natural gas
transmission facilities in New York and
Connecticut. The Project is designed to
provide a total of 125,000 dekatherms
per day of incremental firm
transportation service for two existing
customers of Iroquois, Consolidated
Edison Company of New York, Inc. and
KeySpan Gas East Corporation doing
business as National Grid.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act. The final EIS
is not a decision document. It presents
Commission staff’s independent
analysis of the environmental issues for
the Commission to consider when
addressing the merits of all issues in
this proceeding.
The final EIS responds to comments
that were received on the Commission’s
September 30, 2020 Environmental
Assessment (EA) and June 11, 2021 draft
EIS 1 and discloses downstream
greenhouse gas emissions for the
Project. With the exception of climate
change impacts, FERC staff concludes
that approval of the proposed Project,
with the mitigation measures
recommended in this EIS, would not
result in significant environmental
impacts. FERC staff continues to be
unable to determine significance with
regards to climate change impacts.
The final EIS incorporates the abovereferenced EA, which addressed the
potential environmental effects of the
construction and operation of the
following Project facilities:
• Athens Compressor Station—
installation of one new 12,000
horsepower (hp) natural gas-fired
turbine (Unit A2) in a new building
with associated cooling, filter
separators, and other facilities
connecting to Iroquois’ existing 24-inchdiameter mainline within the existing
fenced compressor station boundary
(Greene County, New York).
• Dover Compressor Station—
installation of one new 12,000 hp
natural gas-fired turbine (Unit A2) in a
new building with associated cooling,
filter separators, and other facilities
connecting to Iroquois’ existing 24-inchdiameter mainline and expansion of the
existing compressor station fenceline
within the property boundary (Dutchess
County, New York).
• Brookfield Compressor Station—
construction of a control/office building,
1 The Project’s Environmental Assessment is
available on eLibrary under accession no.
20200930–3011 and the draft EIS is available under
accession no. 20210611–3022.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
64467
addition of two new 12,000 hp, natural
gas-fired turbines (Unit B1 and Unit B2)
in a new building with associated
cooling, filter separators, and other
typical facilities connecting to Iroquois’
existing 24-inch-diameter mainline.
Additionally, Iroquois would install
incremental cooling at Plant 2–A to
allow for compressed discharge gas to
be cooled, prior to being compressed at
the proposed downstream compressors
(Units B1 and B2). Iroquois would also
replace existing turbine stacks on the
existing compressor units (Unit-A1 and
Unit-A2) and add other noise reduction
measures (e.g., louvers, seals) to
minimize existing noise at the site.
Modifications at this site would require
expansion of the existing compressor
station fenceline within the property
boundary (Fairfield County,
Connecticut).
• Milford Compressor Station—
addition of gas cooling to existing
compressor units and associated piping
to allow for compressed discharge gas to
be cooled within the current fenced
boundaries of the existing compressor
station, where no gas cooling facilities
currently exist (New Haven County,
Connecticut).
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Proposed Enhancement by Compression
Project to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the final EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search) select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field
(i.e., CP20–48–000). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
E:\FR\FM\18NON1.SGM
18NON1
Agencies
[Federal Register Volume 86, Number 220 (Thursday, November 18, 2021)]
[Notices]
[Pages 64465-64467]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-25174]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
November 12, 2021.
Take notice that the Commission received the following electric
rate filings:
[[Page 64466]]
Docket Numbers: ER14-2498-012; ER14-2500-012; ER16-2462-012; ER17-
2364-006; ER19-106-005; ER21-445-002; ER16-2643-004.
Applicants: Potomac Energy Center, LLC, Hill Top Energy Center LLC,
Birdsboro Power LLC, St. Joseph Energy Center, LLC, Oregon Clean
Energy, LLC, Newark Energy Center, LLC, EIF Newark, LLC.
Description: Notice of Non-Material Change in Status of EIF Newark,
LLC, et al.
Filed Date: 11/12/21.
Accession Number: 20211112-5237.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER21-2652-000.
Applicants: Caddo Wind, LLC.
Description: Report Filing: Third Supplement to Application for
Market-Based Rate Authority to be effective N/A.
Filed Date: 11/12/21.
Accession Number: 20211112-5222.
Comment Date: 5 p.m. ET 11/19/21.
Docket Numbers: ER22-384-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Filing of a Construction
Agreement and Joint Use Agreement to be effective 1/10/2022.
Filed Date: 11/10/21.
Accession Number: 20211110-5195.
Comment Date: 5 p.m. ET 12/1/21.
Docket Numbers: ER22-385-000.
Applicants: Innovative Owner 43, LLC.
Description: Baseline eTariff Filing: Innovative Owner 43, LLC--
Application for Market-Based Rate Authority to be effective 11/11/2021.
Filed Date: 11/10/21.
Accession Number: 20211110-5241.
Comment Date: 5 p.m. ET 12/1/21.
Docket Numbers: ER22-386-000.
Applicants: Portland General Electric Company.
Description: Tariff Amendment: Portland General Electric Company
submits tariff filing per 35.15: NorthernGrid Funding Agreement
Termination to be effective 12/31/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5001.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-387-000.
Applicants: Crescent Ridge LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 12/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5013.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-388-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2021-11-11 PSCoES-
Provisional LGIA-657-0.0.0 to be effective 11/12/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5019.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-389-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2011-11-11 PSCoES-
Provisional LGIA-658-0.0.0 to be effective 11/12/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5024.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-390-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-BREMC--Revised NITSA SA
No. 367 to be effective 1/1/2022.
Filed Date: 11/12/21.
Accession Number: 20211112-5031.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-391-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc submits its informational filing
for qualification in the Forward Capacity Market under 2025-2026
Capacity Commitment Period.
Filed Date: 11/9/21.
Accession Number: 20211109-5228.
Comment Date: 5 p.m. ET 11/24/21.
Docket Numbers: ER22-392-000.
Applicants: El Paso Electric Company.
Description: Compliance filing: EPE Order No. 864 Compliance Filing
to be effective N/A.
Filed Date: 11/12/21.
Accession Number: 20211112-5115.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-393-000.
Applicants: Hardin Solar Holdings LLC.
Description: Tariff Amendment: Notice of Cancellation of Market-
Based Rate Tariff to be effective 1/12/2022.
Filed Date: 11/12/21.
Accession Number: 20211112-5155.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-394-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2888R5 Arkansas Electric
Cooperative Corp NITSA NOA to be effective 11/1/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5156.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-395-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, Service
Agreement No. 6229; Queue No. AG1-213 to be effective 11/1/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5158.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-396-000.
Applicants: Equilon Enterprises LLC.
Description: Tariff Amendment: Notice of Cancellation to be
effective 11/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5215.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-397-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: WMPA Second Amendment to
Service Agreement No. 5589; Queue No. AE2-115 to be effective 1/8/2020.
Filed Date: 11/12/21.
Accession Number: 20211112-5238.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-398-000.
Applicants: Mesa Wind Power LLC.
Description: Compliance filing: Notice of Succession and Revised
Market-Based Rate Tariff to be effective 11/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5240.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-399-000.
Applicants: Meadow Lake Solar Park LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 1/12/2022.
Filed Date: 11/12/21.
Accession Number: 20211112-5249.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-400-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Sec. 205(d) Rate Filing: ISO New England Inc. submits
tariff filing per 35.13(a)(2)(iii: ISO-NE and NEPOOL; Attachment K
Resource Assumption Changes to be effective 1/11/2022.
Filed Date: 11/12/21.
Accession Number: 20211112-5251.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-401-000.
Applicants: Florey Knob Energy LLC.
Description: Tariff Amendment: Florey Knob Energy LLC Cancellation
of MBR Tariff to be effective 11/13/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5277.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-402-000.
Applicants: Idaho Power Company.
Description: Sec. 205(d) Rate Filing: Section 4--Sliding Yearly
Option to be effective 12/15/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5296.
Comment Date: 5 p.m. ET 12/3/21.
Docket Numbers: ER22-403-000.
[[Page 64467]]
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: First Revised Incremental
Transmission Service Agreements to be effective 12/1/2021.
Filed Date: 11/12/21.
Accession Number: 20211112-5297.
Comment Date: 5 p.m. ET 12/3/21.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF22-121-000.
Applicants: Sonata Green Owner, LLC.
Description: Form 556 of Sonata Green Owner, LLC.
Filed Date: 11/12/21.
Accession Number: 20211112-5212.
Comment Date: 5 p.m. ET 12/3/21.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-25174 Filed 11-17-21; 8:45 am]
BILLING CODE 6717-01-P