Golden Triangle Storage, Inc.; Notice of Request for Extension of Time, 62522-62523 [2021-24594]
Download as PDF
62522
Federal Register / Vol. 86, No. 215 / Wednesday, November 10, 2021 / Notices
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: November 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–24596 Filed 11–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
khammond on DSKJM1Z7X2PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR21–57–001.
Applicants: Louisville Gas and
Electric Company.
Description: Submits tariff filing per
284.123(b), (e)/: Amendment to Filing of
Revised Statement of Operating
Conditions to be effective 7/1/2021.
Filed Date: 11/2/21.
Accession Number: 20211102–5145.
Comments/Protests Due: 5 p.m. ET
11/23/21.
Docket Numbers: RP20–980–006.
Applicants: East Tennessee Natural
Gas, LLC.
Description: East Tennessee Natural
Gas, LLC submits tariff filing per
154.203: East Tennessee RP20–980
Compliance Filing to be effective 1/1/
2021.
Filed Date: 11/01/2021.
Accession Number: 20211101–5034.
Comment Date: 5 p.m. 11/15/21.
Docket Numbers: RP22–183–000.
Applicants: Empire Pipeline, Inc.
Description: § 4(d) Rate Filing: Empire
Housekeeping Filing—November 2021
to be effective 12/3/2021.
Filed Date: 11/3/21.
Accession Number: 20211103–5086.
Comment Date: 5 p.m. ET 11/15/21.
Docket Numbers: RP22–184–000.
Applicants: Enable Gas Transmission,
LLC.
Description: Compliance filing: EGT–
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
VerDate Sep<11>2014
16:41 Nov 09, 2021
Jkt 256001
Filed Date: 11/3/21.
Accession Number: 20211103–5099.
Comment Date: 5 p.m. ET 11/15/21.
Docket Numbers: RP22–185–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: Compliance filing: MRT–
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
Filed Date: 11/3/21.
Accession Number: 20211103–5102.
Comment Date: 5 p.m. ET 11/15/21.
Docket Numbers: RP22–186–000.
Applicants: Golden Pass Pipeline
LLC.
Description: Compliance filing:
Golden Pass Pipeline Revised Tariff
Records Re: Order 587–Z to be effective
6/1/2022.
Filed Date: 11/3/21.
Accession Number: 20211103–5133
Comment Date: 5 p.m. ET 11/15/21.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP22–158–001.
Applicants: Rover Pipeline LLC.
Description: Compliance filing:
Correction to RVR Cost & Revenue
Study in Compliance with CP15–93–000
et al. to be effective N/A.
Filed Date: 11/3/21.
Accession Number: 20211103–5110.
Comment Date: 5 p.m. ET 11/15/21.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–24593 Filed 11–9–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP07–414–000; CP07–415–
000; CP07–416–000]
Golden Triangle Storage, Inc.; Notice
of Request for Extension of Time
Take notice that on October 29, 2021,
Golden Triangle Storage, Inc. (GTS)
requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time, until
December 31, 2024, in order to
development of Storage Caverns 1 and
2 up to their maximum certificated
storage capacities in Jefferson and
Orange Counties, Texas. In a December
31, 2007 Order Issuing Certificates the
Commission Approved the construction
and operation of the GTS project (2007
Order) 1 The 2007 Order required
Golden Triangle Storage, Inc to
complete construction and make the
facilities available for service within six
years of the certificate order, that is, by
December 13, 2013, pursuant to section
157.20(b) of the Commission’s
regulations.
In its October 29, 2021 request GTS
had stated the 2007 Order recognized
that after the caverns are placed in
service, they will undergo additional
solution mining to increase the working
gas capacity of each cavern to its total
certificated capacity. On October 15,
2013, GTS filed a request for an
extension of time for an additional four
years, until December 31, 2017, to
complete the project.2 On November 15,
2013, the Commission granted an
extension of time until and including
December 31, 2017, to complete
construction of the facilities.3 Due to the
capacity of the leaching facilities, GTS
states that it must alternate the solution
mining of each cavern, thus GTS has
requested by its August 29, 2017 letter
an additional four year extension of
time to complete the leaching of their
storage caverns to their maximum
certificated capacities.4 The
Commission, on November 1, 2017,
granted an additional extension of time
until and including December 31, 2021,
1 Golden Triangle Storage, Inc., 121 FERC
¶ 61,313 (2007).
2 Golden Triangle Storage, Inc., Docket Nos.
CP07–414–000, et al., Request for Extension of Time
filed October 15, 2013.
3 Golden Triangle Storage, Inc., Docket Nos.
CP07–414–000, et al., (unpublished delegated letter
order issued November 15, 2013, granting request
for extension of time).
4 Golden Triangle Storage, Inc., Docket Nos.
CP07–414–000, et al., Request for Extension of Time
to Complete Construction of Jurisdictional Facilities
filed August 29, 2017.
E:\FR\FM\10NON1.SGM
10NON1
Federal Register / Vol. 86, No. 215 / Wednesday, November 10, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
to complete construction of the
facilities.5
Now on October 29, 2021 GTS
requested an additional four-year
extension of time to require additional
rewatering cycles to reach its maximum
certificated storage capacity cycle and
recover any capacity lost to gradual
creep since the most recent prior
rewatering.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Golden Triangle Storage,
Inc request for an extension of time may
do so. No reply comments or answers
will be considered. If you wish to obtain
legal status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).6
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,7 the Commission will aim to
issue an order acting on the request
within 45 days.8 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.9 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.10 At the time
a pipeline requests an extension of time,
orders on certificates of public
5 Golden Triangle Storage, Inc., Docket Nos.
CP07–414–000, et al., (unpublished delegated letter
order issued November 1, 2017, granting request for
extension of time).
6 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
7 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
8 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
9 Id. at P 40.
10 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
VerDate Sep<11>2014
16:41 Nov 09, 2021
Jkt 256001
convenience and necessity are final and
the Commission will not re-litigate their
issuance.11 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on November 19, 2021.
Dated: November 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–24594 Filed 11–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2793–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–11–04_Attachment X Deficiency
Response for Pro forma MPFSA to be
effective 12/31/9998.
11 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
62523
Filed Date: 11/4/21.
Accession Number: 20211104–5119.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER21–2873–001.
Applicants: Alabama Power
Company.
Description: Tariff Amendment:
Supplement to Tri-State Solar Project
Amended and Restated LGIA Filing to
be effective 8/31/2021.
Filed Date: 11/4/21.
Accession Number: 20211104–5077.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER21–2884–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–11–04_SA 3438 Entergy ArkansasLong Lake Solar Sub 1st Rev GIA (J663
J834) to be effective 9/8/2021.
Filed Date: 11/4/21.
Accession Number: 20211104–5071.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER22–109–001.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Tariff Amendment:
Amendment Jurisdictional Agreement
Filing to be effective 12/31/9998.
Filed Date: 11/3/21.
Accession Number: 20211103–5155.
Comment Date: 5 p.m. ET 11/24/21.
Docket Numbers: ER22–335–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–11–04_SA 3616 Entergy
Louisiana-St. Jacques Solar 1st Rev GIA
(J1076) to be effective 10/29/2021.
Filed Date: 11/4/21.
Accession Number: 20211104–5073.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER22–336–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3864
Seven Cowboy Wind Project Interim
GIA to be effective 10/15/2021.
Filed Date: 11/4/21.
Accession Number: 20211104–5117.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER22–337–000.
Applicants: Bio Energy (Ohio II), LLC.
Description: Baseline eTariff Filing:
Bio Energy (Ohio II), LLC FERC MBR
Application to be effective 11/5/2021.
Filed Date: 11/4/21.
Accession Number: 20211104–5122.
Comment Date: 5 p.m. ET 11/26/21.
Docket Numbers: ER22–338–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement Nos. 344 and 345,
Agreement with CSE and S&R to be
effective 1/3/2022.
Filed Date: 11/4/21.
E:\FR\FM\10NON1.SGM
10NON1
Agencies
[Federal Register Volume 86, Number 215 (Wednesday, November 10, 2021)]
[Notices]
[Pages 62522-62523]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-24594]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP07-414-000; CP07-415-000; CP07-416-000]
Golden Triangle Storage, Inc.; Notice of Request for Extension of
Time
Take notice that on October 29, 2021, Golden Triangle Storage, Inc.
(GTS) requested that the Federal Energy Regulatory Commission
(Commission) grant an extension of time, until December 31, 2024, in
order to development of Storage Caverns 1 and 2 up to their maximum
certificated storage capacities in Jefferson and Orange Counties,
Texas. In a December 31, 2007 Order Issuing Certificates the Commission
Approved the construction and operation of the GTS project (2007 Order)
\1\ The 2007 Order required Golden Triangle Storage, Inc to complete
construction and make the facilities available for service within six
years of the certificate order, that is, by December 13, 2013, pursuant
to section 157.20(b) of the Commission's regulations.
---------------------------------------------------------------------------
\1\ Golden Triangle Storage, Inc., 121 FERC ] 61,313 (2007).
---------------------------------------------------------------------------
In its October 29, 2021 request GTS had stated the 2007 Order
recognized that after the caverns are placed in service, they will
undergo additional solution mining to increase the working gas capacity
of each cavern to its total certificated capacity. On October 15, 2013,
GTS filed a request for an extension of time for an additional four
years, until December 31, 2017, to complete the project.\2\ On November
15, 2013, the Commission granted an extension of time until and
including December 31, 2017, to complete construction of the
facilities.\3\ Due to the capacity of the leaching facilities, GTS
states that it must alternate the solution mining of each cavern, thus
GTS has requested by its August 29, 2017 letter an additional four year
extension of time to complete the leaching of their storage caverns to
their maximum certificated capacities.\4\ The Commission, on November
1, 2017, granted an additional extension of time until and including
December 31, 2021,
[[Page 62523]]
to complete construction of the facilities.\5\
---------------------------------------------------------------------------
\2\ Golden Triangle Storage, Inc., Docket Nos. CP07-414-000, et
al., Request for Extension of Time filed October 15, 2013.
\3\ Golden Triangle Storage, Inc., Docket Nos. CP07-414-000, et
al., (unpublished delegated letter order issued November 15, 2013,
granting request for extension of time).
\4\ Golden Triangle Storage, Inc., Docket Nos. CP07-414-000, et
al., Request for Extension of Time to Complete Construction of
Jurisdictional Facilities filed August 29, 2017.
\5\ Golden Triangle Storage, Inc., Docket Nos. CP07-414-000, et
al., (unpublished delegated letter order issued November 1, 2017,
granting request for extension of time).
---------------------------------------------------------------------------
Now on October 29, 2021 GTS requested an additional four-year
extension of time to require additional rewatering cycles to reach its
maximum certificated storage capacity cycle and recover any capacity
lost to gradual creep since the most recent prior rewatering.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on Golden Triangle
Storage, Inc request for an extension of time may do so. No reply
comments or answers will be considered. If you wish to obtain legal
status by becoming a party to the proceedings for this request, you
should, on or before the comment date stated below, file a motion to
intervene in accordance with the requirements of the Commission's Rules
of Practice and Procedure (18 CFR 385.214 or 385.211) and the
Regulations under the Natural Gas Act (18 CFR 157.10).\6\
---------------------------------------------------------------------------
\6\ Only motions to intervene from entities that were party to
the underlying proceeding will be accepted. Algonquin Gas
Transmission, LLC, 170 FERC ] 61,144, at P 39 (2020).
---------------------------------------------------------------------------
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for Natural
Gas Act facilities when such requests are contested before order
issuance. For those extension requests that are contested,\7\ the
Commission will aim to issue an order acting on the request within 45
days.\8\ The Commission will address all arguments relating to whether
the applicant has demonstrated there is good cause to grant the
extension.\9\ The Commission will not consider arguments that re-
litigate the issuance of the certificate order, including whether the
Commission properly found the project to be in the public convenience
and necessity and whether the Commission's environmental analysis for
the certificate complied with the National Environmental Policy
Act.\10\ At the time a pipeline requests an extension of time, orders
on certificates of public convenience and necessity are final and the
Commission will not re-litigate their issuance.\11\ The OEP Director,
or his or her designee, will act on all of those extension requests
that are uncontested.
---------------------------------------------------------------------------
\7\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1) (2019).
\8\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
\9\ Id. at P 40.
\10\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\11\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Hand delivered submissions in
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on November 19, 2021.
Dated: November 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-24594 Filed 11-9-21; 8:45 am]
BILLING CODE 6717-01-P