Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator Interconnection; Supplemental Notice of Technical Conference, 62165 [2021-24476]

Download as PDF 62165 Federal Register / Vol. 86, No. 214 / Tuesday, November 9, 2021 / Notices Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Motions to intervene must be served on the applicant either by mail or email at: Kevin M. Sweeney, Legal Counsel, Golden Pass Products, LLC, Law Office of Kevin M. Sweeney, 1625 K Street NW, Suite 1100, Washington, DC 20006, or by phone at 202–609–7709, or email at ksweeney@kmsenergylaw.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Dated: November 3, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–24479 Filed 11–8–21; 8:45 am] BILLING CODE 6717–01–P Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention and Scoping Comments Deadline: 5:00 p.m. Eastern Time on November 24, 2021. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM21–17–000] Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator Interconnection; Supplemental Notice of Technical Conference As first announced in the Notice of Technical Conference issued in this proceeding on September 16, 2021, the Federal Energy Regulatory Commission (Commission) will convene a staff-led technical conference in the abovereferenced proceeding on Monday, November 15, 2021, from 10:00 a.m. to 4:30 p.m. Eastern Time. The conference will be held electronically. Attached to this Supplemental Notice is an agenda for the technical conference. Discussions at the conference may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: Docket Nos. jspears on DSK121TN23PROD with NOTICES1 Duke Energy Florida v. Florida Power and Light, et al ..................................................................................... NYISO ................................................................................................................................................................ Neptune Regional Transmission System, LLC and Long Island Power Authority v. PJM ............................... PPL Electric Utilities Corporation & PJM Interconnection, LLC ........................................................................ SOO Green HVDC Link Project Co, LLC v. PJM Interconnection, LLC ........................................................... California Independent System Operator Corporation ...................................................................................... NECEC Transmission LLC and Avangrid, Inc. v. NextEra Energy Resources, LLC ........................................ ISO New England Inc ........................................................................................................................................ The conference will be open for the public to attend electronically. There is no fee for attendance. Registration for the conference is not required. Information on this technical conference, including a link to the webcast, will be posted on the conference’s event page on the Commission’s website, https:// www.ferc.gov/news-events/events/ technical-conference-building-futurethrough-electric-regional-transmission, prior to the event. The conference will be transcribed. Transcripts of the conference will be 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. VerDate Sep<11>2014 17:00 Nov 08, 2021 Jkt 256001 available for a fee from Ace-Federal Reporters, Inc. (202) 347–3700. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, call toll free (866) 208–3372 (voice) or (202) 208–8659 (TTY), or send a fax to (202) 208–2106 with the required accommodations. For more information about this technical conference, please contact: David Tobenkin (Technical Information), Office of Energy Policy 8 18 9 18 PO 00000 EL21–93–000 ER21–1647–002, EL21–66–001 ER21–39–000 ER21–2282–001 EL21–85–000 ER21–2530–000 EL21–6–000 EL21–94–000 and Innovation, (202) 502–6445, david.tobenkin@ferc.gov Lina Naik (Legal Information), Office of General Counsel, (202) 502–8882, Lina.Naik@ferc.gov Sarah McKinley (Logistical Information), Office of External Affairs, (202) 502–8004, Sarah.Mckinley@ferc.gov Dated: November 3, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–24476 Filed 11–8–21; 8:45 am] BILLING CODE 6717–01–P CFR 385.214(c)(1). CFR 385.214(b)(3) and (d). Frm 00025 Fmt 4703 Sfmt 9990 E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 86, Number 214 (Tuesday, November 9, 2021)]
[Notices]
[Page 62165]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-24476]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RM21-17-000]


Building for the Future Through Electric Regional Transmission 
Planning and Cost Allocation and Generator Interconnection; 
Supplemental Notice of Technical Conference

    As first announced in the Notice of Technical Conference issued in 
this proceeding on September 16, 2021, the Federal Energy Regulatory 
Commission (Commission) will convene a staff-led technical conference 
in the above-referenced proceeding on Monday, November 15, 2021, from 
10:00 a.m. to 4:30 p.m. Eastern Time. The conference will be held 
electronically. Attached to this Supplemental Notice is an agenda for 
the technical conference.
    Discussions at the conference may involve issues raised in 
proceedings that are currently pending before the Commission. These 
proceedings include, but are not limited to:

------------------------------------------------------------------------
                                                     Docket Nos.
------------------------------------------------------------------------
Duke Energy Florida v. Florida Power and     EL21-93-000
 Light, et al.
NYISO......................................  ER21-1647-002, EL21-66-001
Neptune Regional Transmission System, LLC    ER21-39-000
 and Long Island Power Authority v. PJM.
PPL Electric Utilities Corporation & PJM     ER21-2282-001
 Interconnection, LLC.
SOO Green HVDC Link Project Co, LLC v. PJM   EL21-85-000
 Interconnection, LLC.
California Independent System Operator       ER21-2530-000
 Corporation.
NECEC Transmission LLC and Avangrid, Inc.    EL21-6-000
 v. NextEra Energy Resources, LLC.
ISO New England Inc........................  EL21-94-000
------------------------------------------------------------------------

    The conference will be open for the public to attend 
electronically. There is no fee for attendance. Registration for the 
conference is not required. Information on this technical conference, 
including a link to the webcast, will be posted on the conference's 
event page on the Commission's website, https://www.ferc.gov/news-events/events/technical-conference-building-future-through-electric-regional-transmission, prior to the event.
    The conference will be transcribed. Transcripts of the conference 
will be available for a fee from Ace-Federal Reporters, Inc. (202) 347-
3700.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an email to [email protected], call toll free (866) 208-3372 
(voice) or (202) 208-8659 (TTY), or send a fax to (202) 208-2106 with 
the required accommodations.
    For more information about this technical conference, please 
contact:

David Tobenkin (Technical Information), Office of Energy Policy and 
Innovation, (202) 502-6445, [email protected]
Lina Naik (Legal Information), Office of General Counsel, (202) 502-
8882, [email protected]
Sarah McKinley (Logistical Information), Office of External Affairs, 
(202) 502-8004, [email protected]

    Dated: November 3, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-24476 Filed 11-8-21; 8:45 am]
BILLING CODE 6717-01-P