Columbia Gulf Transmission, LLC; Notice of Request for Extension of Time, 61203-61204 [2021-24229]
Download as PDF
Federal Register / Vol. 86, No. 212 / Friday, November 5, 2021 / Notices
interventions, and comments will also
be available electronically by going to
the following DOE Web address: https://
www.energy.gov/fecm/division-naturalgas-regulation.
A decisional record on the
Application will be developed through
responses to this Notice by parties,
including the parties’ written comments
and replies thereto. Additional
procedures will be used as necessary to
achieve a complete understanding of the
facts and issues. If an additional
procedure is scheduled, notice will be
provided to all parties. If no party
requests additional procedures, a final
Opinion and Order may be issued based
on the official record, including the
Application and responses filed by
parties pursuant to this Notice, in
accordance with 10 CFR 590.316.
Signed in Washington, DC, on October 29,
2021.
Amy Sweeney,
Director, Office of Regulation, Analysis, and
Engagement, Office of Resource
Sustainability.
[FR Doc. 2021–24214 Filed 11–4–21; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL22–4–000]
jspears on DSK121TN23PROD with NOTICES1
Tri-State Generation and Transmission
Association, Inc.; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
On October 29, 2021, the Commission
issued an order in Docket No. EL22–4–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, instituting an investigation into
whether Tri-State Generation and
Transmission Association, Inc.’s
methodology and procedures for
determining a Contract Termination
Payment is unjust, unreasonable,
unduly discriminatory or preferential,
or otherwise unlawful. Tri-State
Generation and Transmission
Association, Inc., LLC, 177 FERC
¶ 61,059 (2021).
The refund effective date in Docket
No. EL22–4–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL22–4–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
VerDate Sep<11>2014
21:40 Nov 04, 2021
Jkt 256001
Procedure, 18 CFR 385.214 (2020),
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: November 1, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–24260 Filed 11–4–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–193–000]
Columbia Gulf Transmission, LLC;
Notice of Request for Extension of
Time
Take notice that on October 26, 2021,
Columbia Gulf Transmission, LLC
(Columbia Gulf) requested that the
Federal Energy Regulatory Commission
(Commission) grant an extension of
time, until November 15, 2022, in order
to place the replacement facilities of the
Mainline 100 and Mainline 200
Replacement Project (Project) into
service, in Menifee and Montgomery
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
61203
Counties, Kentucky, as authorized as
part of Columbia Gulf’s Project in the
November 15, 2019 Order Granting
Certificate and Approving
Abandonment 1 (November 15 Order).
The November 15 Order required
Columbia Gulf to complete construction
and make the facilities available for
service within one year of the order
date.
On July 7, 2020, Columbia Gulf
requested an extension of time until
November 15, 2021 to place the
replacement facilities into service, to
allow additional time for the U.S.
Department of Transportation (‘‘DOT’’)
to reach a decision on Columbia Gulf’s
application for a special permit. The
special permit would allow Columbia
Gulf to operate the segments of Mainline
100 and 200 proposed for replacement
as part of the Project at the current
MAOP without pipe replacement work
or further action to maintain compliance
with DOT regulations. On August 6,
2020, the Commission granted Columbia
Gulf an extension of time until
November 15, 2021.
The special permit application
Columbia Gulf submitted to DOT on
October 15, 2019 has yet to receive a
determination. In order to provide DOT
with additional time necessary to make
a determination on Columbia Gulf’s
special permit application, Columbia
Gulf respectfully requests a further
extension of time to and including
November 15, 2022, to place the
replacement facilities into service. Upon
receipt of the special permit, Columbia
Gulf would, pursuant to Rule 212 of the
Rules of Practice and Procedures of the
Commission, 18 CFR 385.212, Columbia
Gulf would submit a Motion to Vacate
the authorizations granted in the
November 15 Order with respect to the
Mainline 100 and Mainline 200
Replacement Project. If unsuccessful in
obtaining the special permit, Columbia
Gulf would notify the Commission of its
intent to begin construction of the
Project to comply with DOT
requirements and submit a revision to
its Implementation Plan reflecting an
updated construction schedule.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Columbia Gulf’s request for
an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
1 Columbia Gulf Transmission, LLC, 169 FERC
¶ 62,084 (2019).
E:\FR\FM\05NON1.SGM
05NON1
61204
Federal Register / Vol. 86, No. 212 / Friday, November 5, 2021 / Notices
jspears on DSK121TN23PROD with NOTICES1
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).2
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.6 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.7 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
2 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
4 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
5 Id. at P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
21:40 Nov 04, 2021
Jkt 256001
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on November 16, 2021.
Dated: November 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–24229 Filed 11–4–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–16–000.
Applicants: Dunns Bridge Solar
Center, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Dunns Bridge Solar
Center, LLC.
Filed Date: 10/22/21.
Accession Number: 20211022–5209.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: EG22–17–000.
Applicants: Jackson Generation, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Jackson Generation,
LLC.
Filed Date: 11/1/21.
Accession Number: 20211101–5116.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: EG22–18–000.
Applicants: MPH AL Pierce, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator status of MPH Al Pierce, LLC.
Filed Date: 10/29/21.
Accession Number: 20211029–5388.
Comment Date: 5 p.m. ET 11/19/21.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL22–6–000.
Applicants: LOUISIANA PUBLIC
SERVICE COMMISSION v. ENTERGY
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
CORPORATION, ENTERGY SERVICES,
LLC, ENTERGY LOUISIANA, LLC,
ENTERGY ARKANSAS, LLC, ENTERGY
MISSISSIPPI, LLC, ENTERGY NEW
ORLEANS, LLC, ENTERGY TEXAS,
INC.
Description: Complaint of the
Louisiana Public Service Commission.
Filed Date: 10/29/21.
Accession Number: 20211029–5333.
Comment Date: 5 p.m. ET 11/18/21.
Docket Numbers: EL22–7–000.
Applicants: Virginia Municipal
Electric Association v. Virginia Electric
and Power Co. d/b/a Dominion Virginia
Power.
Description: Complaint of Virginia
Municipal Electric Association against
Virginia Electric and Power Company,
doing business as Dominion Virginia
Power.
Filed Date: 10/29/21.
Accession Number: 20211029–5350.
Comment Date: 5 p.m. ET 11/18/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1428–005.
Applicants: Tilton Energy LLC.
Description: Informational Filing of
Tilton Energy LLC pursuant to Schedule
2 of the MISO Tariff.
Filed Date: 10/22/21.
Accession Number: 20211022–5207.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER20–1006–003.
Applicants: DATC Path 15, LLC.
Description: Compliance filing:
Amendment to 3000022 to be effective
6/13/2020.
Filed Date: 11/1/21.
Accession Number: 20211101–5249.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: ER21–2520–002.
Applicants: MATL LLP.
Description: Compliance filing: Order
No. 676 Second Revised Compliance
Filing to be effective 12/31/9998.
Filed Date: 11/1/21.
Accession Number: 20211101–5009.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: ER21–2581–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response in ER21–2581—
City of Independence, Missouri Formula
Rate to be effective 10/1/2021.
Filed Date: 11/1/21.
Accession Number: 20211101–5206.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: ER21–2652–000.
Applicants: Caddo Wind, LLC.
Description: Report Filing: Second
Supplement to Application for MarketBased Rate Authority to be effective N/
A.
E:\FR\FM\05NON1.SGM
05NON1
Agencies
[Federal Register Volume 86, Number 212 (Friday, November 5, 2021)]
[Notices]
[Pages 61203-61204]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-24229]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-193-000]
Columbia Gulf Transmission, LLC; Notice of Request for Extension
of Time
Take notice that on October 26, 2021, Columbia Gulf Transmission,
LLC (Columbia Gulf) requested that the Federal Energy Regulatory
Commission (Commission) grant an extension of time, until November 15,
2022, in order to place the replacement facilities of the Mainline 100
and Mainline 200 Replacement Project (Project) into service, in Menifee
and Montgomery Counties, Kentucky, as authorized as part of Columbia
Gulf's Project in the November 15, 2019 Order Granting Certificate and
Approving Abandonment \1\ (November 15 Order). The November 15 Order
required Columbia Gulf to complete construction and make the facilities
available for service within one year of the order date.
---------------------------------------------------------------------------
\1\ Columbia Gulf Transmission, LLC, 169 FERC ] 62,084 (2019).
---------------------------------------------------------------------------
On July 7, 2020, Columbia Gulf requested an extension of time until
November 15, 2021 to place the replacement facilities into service, to
allow additional time for the U.S. Department of Transportation
(``DOT'') to reach a decision on Columbia Gulf's application for a
special permit. The special permit would allow Columbia Gulf to operate
the segments of Mainline 100 and 200 proposed for replacement as part
of the Project at the current MAOP without pipe replacement work or
further action to maintain compliance with DOT regulations. On August
6, 2020, the Commission granted Columbia Gulf an extension of time
until November 15, 2021.
The special permit application Columbia Gulf submitted to DOT on
October 15, 2019 has yet to receive a determination. In order to
provide DOT with additional time necessary to make a determination on
Columbia Gulf's special permit application, Columbia Gulf respectfully
requests a further extension of time to and including November 15,
2022, to place the replacement facilities into service. Upon receipt of
the special permit, Columbia Gulf would, pursuant to Rule 212 of the
Rules of Practice and Procedures of the Commission, 18 CFR 385.212,
Columbia Gulf would submit a Motion to Vacate the authorizations
granted in the November 15 Order with respect to the Mainline 100 and
Mainline 200 Replacement Project. If unsuccessful in obtaining the
special permit, Columbia Gulf would notify the Commission of its intent
to begin construction of the Project to comply with DOT requirements
and submit a revision to its Implementation Plan reflecting an updated
construction schedule.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on Columbia Gulf's
request for an extension of time may do so. No reply comments or
answers will be considered. If you wish to obtain legal status by
becoming a party to the proceedings for this request, you should, on or
before the comment date stated below, file a motion to intervene
[[Page 61204]]
in accordance with the requirements of the Commission's Rules of
Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations
under the Natural Gas Act (18 CFR 157.10).\2\
---------------------------------------------------------------------------
\2\ Only motions to intervene from entities that were party to
the underlying proceeding will be accepted. Algonquin Gas
Transmission, LLC, 170 FERC ] 61,144, at P 39 (2020).
---------------------------------------------------------------------------
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for Natural
Gas Act facilities when such requests are contested before order
issuance. For those extension requests that are contested,\3\ the
Commission will aim to issue an order acting on the request within 45
days.\4\ The Commission will address all arguments relating to whether
the applicant has demonstrated there is good cause to grant the
extension.\5\ The Commission will not consider arguments that re-
litigate the issuance of the certificate order, including whether the
Commission properly found the project to be in the public convenience
and necessity and whether the Commission's environmental analysis for
the certificate complied with the National Environmental Policy Act.\6\
At the time a pipeline requests an extension of time, orders on
certificates of public convenience and necessity are final and the
Commission will not re-litigate their issuance.\7\ The OEP Director, or
his or her designee, will act on all of those extension requests that
are uncontested.
---------------------------------------------------------------------------
\3\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1) (2019).
\4\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
\5\ Id. at P 40.
\6\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\7\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Hand delivered submissions in
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on November 16, 2021.
Dated: November 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-24229 Filed 11-4-21; 8:45 am]
BILLING CODE 6717-01-P