ANR Pipeline Company; Great Lakes Transmission Limited Partnership; Notice of Availability of the Final Environmental Impact Statement for the Proposed Alberta Xpress and Lease Capacity Abandonment Project, 60806 [2021-24106]
Download as PDF
60806
Federal Register / Vol. 86, No. 211 / Thursday, November 4, 2021 / Notices
Dated: November 1, 2021.
Juliana Pearson,
PRA Coordinator, Strategic Collections and
Clearance Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2021–24096 Filed 11–3–21; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–484–000; CP20–485–000]
lotter on DSK11XQN23PROD with NOTICES1
ANR Pipeline Company; Great Lakes
Transmission Limited Partnership;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Alberta Xpress and
Lease Capacity Abandonment Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Alberta Xpress and Lease
Capacity Abandonment Projects,
proposed by ANR Pipeline Company
(ANR) and Great Lakes Gas
Transmission Limited Partnership
(GLGT) in Docket Nos. CP20–484–000
and CP20–485–000, respectively. ANR
proposes to construct and operate one
new greenfield compressor station
(designated as the Turkey Creek
Compressor Station) and modify a
mainline valve in Evangeline Parish,
Louisiana, and acquire a lease
agreement between ANR and GLGT.
ANR has executed binding precedent
agreements with two shippers to
transport up to 165,000 dekatherms per
day of natural gas. GLGT proposes to
abandon firm capacity by a lease
agreement with ANR. No new
construction is proposed as part of the
Lease Capacity Abandonment Project;
however, this is related to the
application filed by ANR to construct
and operate the Alberta Xpress Project.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
proposed facilities in accordance with
the requirements of the National
Environmental Policy Act. The final EIS
is not a decision document. It presents
Commission staff’s independent
analysis of the environmental issues for
the Commission to consider when
addressing the merits of all issues in
this proceeding.
The final EIS responds to comments
that were received on the Commission’s
December 4, 2020 environmental
assessment (EA) and July 30, 2021 draft
VerDate Sep<11>2014
17:57 Nov 03, 2021
Jkt 256001
EIS,1 and discloses downstream
greenhouse gas emissions for the
projects. With the exception of climate
change impacts, the FERC staff
concludes that approval of the proposed
projects, with the mitigation measures
recommended in this EIS, would not
result in significant environmental
impacts. FERC staff continues to be
unable to determine significance with
regards to climate change impacts.
The final EIS incorporates the abovereferenced EA, which addressed the
potential environmental effects of the
construction and operation of the
Turkey Creek Compressor Station and
modifications to a mainline valve. The
Turkey Creek Compressor Station would
include the following facilities:
• One 15,900 horsepower gas-fired
turbine compressor;
• three inlet filter separators;
• three discharge gas cooling bays;
• 36-inch-diameter suction and
discharge piping;
• 16-inch-diameter cold recycle
valves and piping;
• 16-inch-diameter unit control valve
and bypass piping; and
• related appurtenant facilities.
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Proposed Alberta Xpress and Lease
Capacity Abandonment Projects to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Alberta Xpress Project area. The final
EIS is only available in electronic
format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the natural gas
environmental documents page (https://
www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the draft EIS
may be accessed by using the eLibrary
link on the FERC’s website. Click on the
eLibrary link (https://elibrary.ferc.gov/
eLibrary/search), select ‘‘General
Search,’’ and enter the docket number in
the ‘‘Docket Number’’ field (i.e., CP20–
484 and CP20–485). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Additional information about the
projects are available from the
1 The project’s EA is available on eLibrary under
accession no. 20201204–3004 and the draft EIS is
available under accession no. 20210730–3017.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: October 29, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–24106 Filed 11–3–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–12–000.
Applicants: Calhoun Power Company,
LLC, Alabama Power Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Calhoun Power
Company, LLC, et al.
Filed Date: 10/29/21.
Accession Number: 20211029–5156.
Comment Date: 5 p.m. ET 11/19/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1828–002.
Applicants: PacifiCorp.
Description: Compliance filing: OATT
Order 864 Compliance Filing—Second
Deficiency Response to be effective N/
A.
Filed Date: 10/29/21.
Accession Number: 20211029–5177.
Comment Date: 5 p.m. ET 11/19/21.
Docket Numbers: ER21–1875–002.
Applicants: Arizona Public Service
Company.
Description: Tariff Amendment:
Response to Deficiency Letter to be
effective 7/10/2021.
Filed Date: 10/29/21.
Accession Number: 20211029–5002.
Comment Date: 5 p.m. ET 11/19/21.
E:\FR\FM\04NON1.SGM
04NON1
Agencies
[Federal Register Volume 86, Number 211 (Thursday, November 4, 2021)]
[Notices]
[Page 60806]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-24106]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-484-000; CP20-485-000]
ANR Pipeline Company; Great Lakes Transmission Limited
Partnership; Notice of Availability of the Final Environmental Impact
Statement for the Proposed Alberta Xpress and Lease Capacity
Abandonment Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared a final environmental impact statement (EIS)
for the Alberta Xpress and Lease Capacity Abandonment Projects,
proposed by ANR Pipeline Company (ANR) and Great Lakes Gas Transmission
Limited Partnership (GLGT) in Docket Nos. CP20-484-000 and CP20-485-
000, respectively. ANR proposes to construct and operate one new
greenfield compressor station (designated as the Turkey Creek
Compressor Station) and modify a mainline valve in Evangeline Parish,
Louisiana, and acquire a lease agreement between ANR and GLGT. ANR has
executed binding precedent agreements with two shippers to transport up
to 165,000 dekatherms per day of natural gas. GLGT proposes to abandon
firm capacity by a lease agreement with ANR. No new construction is
proposed as part of the Lease Capacity Abandonment Project; however,
this is related to the application filed by ANR to construct and
operate the Alberta Xpress Project.
The final EIS assesses the potential environmental effects of the
construction and operation of the proposed facilities in accordance
with the requirements of the National Environmental Policy Act. The
final EIS is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
The final EIS responds to comments that were received on the
Commission's December 4, 2020 environmental assessment (EA) and July
30, 2021 draft EIS,\1\ and discloses downstream greenhouse gas
emissions for the projects. With the exception of climate change
impacts, the FERC staff concludes that approval of the proposed
projects, with the mitigation measures recommended in this EIS, would
not result in significant environmental impacts. FERC staff continues
to be unable to determine significance with regards to climate change
impacts.
---------------------------------------------------------------------------
\1\ The project's EA is available on eLibrary under accession
no. 20201204-3004 and the draft EIS is available under accession no.
20210730-3017.
---------------------------------------------------------------------------
The final EIS incorporates the above-referenced EA, which addressed
the potential environmental effects of the construction and operation
of the Turkey Creek Compressor Station and modifications to a mainline
valve. The Turkey Creek Compressor Station would include the following
facilities:
One 15,900 horsepower gas-fired turbine compressor;
three inlet filter separators;
three discharge gas cooling bays;
36-inch-diameter suction and discharge piping;
16-inch-diameter cold recycle valves and piping;
16-inch-diameter unit control valve and bypass piping; and
related appurtenant facilities.
The Commission mailed a copy of the Notice of Availability of the
Final Environmental Impact Statement for the Proposed Alberta Xpress
and Lease Capacity Abandonment Projects to federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; and newspapers and libraries in the Alberta Xpress Project
area. The final EIS is only available in electronic format. It may be
viewed and downloaded from the FERC's website (www.ferc.gov), on the
natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In
addition, the draft EIS may be accessed by using the eLibrary link on
the FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), select ``General Search,'' and
enter the docket number in the ``Docket Number'' field (i.e., CP20-484
and CP20-485). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
Additional information about the projects are available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/ferc-online/overview to
register for eSubscription.
Dated: October 29, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-24106 Filed 11-3-21; 8:45 am]