Joint Federal-State Task Force on Electric Transmission; Notice of Meeting, 60457 [2021-23864]

Download as PDF 60457 Federal Register / Vol. 86, No. 209 / Tuesday, November 2, 2021 / Notices A. Number of respondents B. Annual number of responses per respondent D. Average hour burden & cost per response 3 C. Total number of responses (column A × column B) 70 ........................................... 1 70 Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 1 hour; $87.00 ....................... Dated: October 27, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–23861 Filed 11–1–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–15–000] Joint Federal-State Task Force on Electric Transmission; Notice of Meeting As first announced in the Commission’s August 30, 2021 order in E. Total annual burden hours & total annual cost F. Cost per respondent ($) (column C × column D) (column E ÷ column A) 70 hours; $6,090 ................... $87.00 the above-captioned docket,1 the first public meeting of the Joint Federal-State Task Force on Electric Transmission (Task Force) will be held on Wednesday, November 10, 2021, from approximately 1:00 p.m. to 6:00 p.m. Eastern time. The meeting will be held at the Omni Louisville Hotel in Louisville, Kentucky. Commissioners may attend and participate in this meeting. Attached to this Notice is an agenda for the meeting. Discussions at the meeting may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: Docket No. jspears on DSK121TN23PROD with NOTICES1 NextEra Energy SeaBrook, LLC .......................................................................................................................................................... NECEC Transmission LLC and Avangrid, Inc. v. NextEra Energy Resources, LLC ......................................................................... Neptune Regional Transmission System, LLC and Long Island Power Authority v. PJM Interconnection, L.L.C ............................ SOO Green HVDC Link ProjectCo, LLC v. PJM Interconnection, L.L.C ............................................................................................ Duke Energy Florida, LLC v. Florida Power & Light Co. and Florida Power & Light Co. d/b/a Gulf Power ..................................... ISO New England Inc .......................................................................................................................................................................... The meeting will be open to the public for listening and observing and on the record. There is no fee for attendance and registration is not required. The public may attend in person or via audio Webcast.2 In light of the ongoing National Emergency concerning the Novel Coronavirus Disease (COVID–19), in-person seating for the conference will be limited and not guaranteed. Therefore, the public is encouraged to attend via audio Webcast. This conference will be transcribed. Transcripts will be available for a fee from Ace Reporting, 202–347–3700. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. 3 Commission staff estimates that the average industry hourly cost for this information collection is approximated by the current FERC 2021 average VerDate Sep<11>2014 17:42 Nov 01, 2021 Jkt 256001 More information about the Task Force, including frequently asked questions, is available here: https:// www.ferc.gov/TFSOET. For more information about this meeting, please contact: Gretchen Kershaw, 202–502– 8213, gretchen.kershaw@ferc.gov; or Jennifer Murphy, 202–898–1350, jmurphy@naruc.org. For information related to logistics, please contact Benjamin Williams, 202–502–8506, benjamin.williams@ferc.gov; or Rob Thormeyer, 202–502–8694, robert.thormeyer@ferc.gov. Dated: October 27, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–23864 Filed 11–1–21; 8:45 am] BILLING CODE 6717–01–P hourly costs for wages and benefits, i.e., $87.00/ hour. 1 Joint Federal-State Task Force on Electric Transmission, 176 FERC ¶ 61,131 (2021). PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 EL21–3–000 EL21–6–000 EL21–39–000 EL21–85–000 EL21–93–000 EL21–94–000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–6–000] Spire Storage West, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Clear Creek Expansion Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Clear Creek Expansion Project, proposed by Spire Storage West, LLC (Spire) in the above-referenced docket. Spire requests authorization to construct, expand, and operate natural gas transmission and storage facilities at Spire’s existing Clear Creek Storage Field in order to increase the certificated gas capacities from 4.0 billion cubic feet (Bcf) to 20 Bcf, and 2 A link to the Webcast will be available here on the day of the event: https://www.ferc.gov/TFSOET. E:\FR\FM\02NON1.SGM 02NON1

Agencies

[Federal Register Volume 86, Number 209 (Tuesday, November 2, 2021)]
[Notices]
[Page 60457]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-23864]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD21-15-000]


Joint Federal-State Task Force on Electric Transmission; Notice 
of Meeting

    As first announced in the Commission's August 30, 2021 order in the 
above-captioned docket,\1\ the first public meeting of the Joint 
Federal-State Task Force on Electric Transmission (Task Force) will be 
held on Wednesday, November 10, 2021, from approximately 1:00 p.m. to 
6:00 p.m. Eastern time. The meeting will be held at the Omni Louisville 
Hotel in Louisville, Kentucky. Commissioners may attend and participate 
in this meeting. Attached to this Notice is an agenda for the meeting.
---------------------------------------------------------------------------

    \1\ Joint Federal-State Task Force on Electric Transmission, 176 
FERC ] 61,131 (2021).
---------------------------------------------------------------------------

    Discussions at the meeting may involve issues raised in proceedings 
that are currently pending before the Commission. These proceedings 
include, but are not limited to:

------------------------------------------------------------------------
                                                            Docket No.
------------------------------------------------------------------------
NextEra Energy SeaBrook, LLC............................      EL21-3-000
NECEC Transmission LLC and Avangrid, Inc. v. NextEra          EL21-6-000
 Energy Resources, LLC..................................
Neptune Regional Transmission System, LLC and Long           EL21-39-000
 Island Power Authority v. PJM Interconnection, L.L.C...
SOO Green HVDC Link ProjectCo, LLC v. PJM                    EL21-85-000
 Interconnection, L.L.C.................................
Duke Energy Florida, LLC v. Florida Power & Light Co.        EL21-93-000
 and Florida Power & Light Co. d/b/a Gulf Power.........
ISO New England Inc.....................................     EL21-94-000
------------------------------------------------------------------------

    The meeting will be open to the public for listening and observing 
and on the record. There is no fee for attendance and registration is 
not required. The public may attend in person or via audio Webcast.\2\ 
In light of the ongoing National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), in-person seating for the conference 
will be limited and not guaranteed. Therefore, the public is encouraged 
to attend via audio Webcast. This conference will be transcribed. 
Transcripts will be available for a fee from Ace Reporting, 202-347-
3700.
---------------------------------------------------------------------------

    \2\ A link to the Webcast will be available here on the day of 
the event: https://www.ferc.gov/TFSOET.
_____________________________________-

    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an email to [email protected] or call toll free 1-866-208-
3372 (voice) or 202-208-8659 (TTY), or send a fax to 202-208-2106 with 
the required accommodations.
    More information about the Task Force, including frequently asked 
questions, is available here: https://www.ferc.gov/TFSOET. For more 
information about this meeting, please contact: Gretchen Kershaw, 202-
502-8213, [email protected]; or Jennifer Murphy, 202-898-1350, 
[email protected]. For information related to logistics, please contact 
Benjamin Williams, 202-502-8506, [email protected]; or Rob 
Thormeyer, 202-502-8694, [email protected].

    Dated: October 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-23864 Filed 11-1-21; 8:45 am]
BILLING CODE 6717-01-P