North Baja Pipeline, LLC; Notice of Availability of the Final Environmental Impact Statement for the Proposed North Baja XPress Project, 59702-59703 [2021-23482]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
59702
Federal Register / Vol. 86, No. 206 / Thursday, October 28, 2021 / Notices
35.13(a)(2)(iii: Joint Section 205 filing of
TPIA among NYISO, ConEdison and
Transco SA No. 2654 to be effective 10/
8/2021.
Filed Date: 10/22/21.
Accession Number: 20211022–5128.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER22–190–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–10–22 Joint Owned Unit Pilot
Agreement to be effective 12/22/2021.
Filed Date: 10/22/21.
Accession Number: 20211022–5131.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER22–191–000.
Applicants: Tidal Energy Marketing
(U.S.) L.L.C.
Description: Baseline eTariff Filing:
Application for MBR Authorization to
be effective 12/22/2021.
Filed Date: 10/22/21.
Accession Number: 20211022–5144.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER22–192–000.
Applicants: Evolugen Trading and
Marketing LP.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 12/22/2021.
Filed Date: 10/22/21.
Accession Number: 20211022–5158.
Comment Date: 5 p.m. ET 11/12/21.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES22–14–000.
Applicants: LS Power Grid California,
LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of LS
Power Grid California, LLC.
Filed Date: 10/21/21.
Accession Number: 20211021–5164.
Comment Date: 5 p.m. ET 11/12/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
VerDate Sep<11>2014
17:34 Oct 27, 2021
Jkt 256001
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23480 Filed 10–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–27–000]
North Baja Pipeline, LLC; Notice of
Availability of the Final Environmental
Impact Statement for the Proposed
North Baja XPress Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the North Baja XPress Project
(Project), proposed by North Baja
Pipeline, LLC (North Baja) in the abovereferenced docket. North Baja requests
authorization to modify an existing
compressor station in La Paz County,
Arizona, as well as install additional
flow measurement facilities and piping
modifications at two existing meter
stations in La Paz County, Arizona and
Imperial County, California,
respectively. North Baja states that the
purpose of the Project is enable the
transport of 495,000 dekatherms per day
of natural gas to the United States/
Mexico border for its shipper, Sempra
LNG international, LLC.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act. The final EIS
is not a decision document. It presents
Commission staff’s independent
analysis of the environmental issues for
the Commission to consider when
addressing the merits of all issues in
this proceeding.
The final EIS responds to comments
that were received on the Commission’s
September 8, 2020 Environmental
Assessment (EA) and July 9, 2021 draft
EIS 1 and discloses downstream
greenhouse gas emissions for the
Project. With the exception of climate
change impacts, FERC staff concludes
that approval of the proposed Project,
with the mitigation measures
recommended in the EIS, would not
1 The Project’s EA is available on eLibrary under
accession no. 20200908–3009, and the draft EIS is
available under accession no. 20210709–3005.
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
result in significant environmental
impacts. FERC staff continues to be
unable to determine significance with
regards to climate change impacts.
The U.S. Department of the Interior
Bureau of Land Management (BLM)
participated as a cooperating agency in
the preparation of the EA and the EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the National
Environmental Policy Act analysis. The
BLM may adopt and use the EA and EIS
to consider the issuance of a right-ofway grant for the use of a temporary
workspace requested by North Baja on
BLM-administered public lands
adjacent to the Ogilby Meter Station in
Imperial County, California.
The final EIS incorporates the abovereferenced EA, which addressed the
potential environmental effects of the
construction and operation of the
following Project facilities:
• One new 31,900-horsepower
compressor unit and restaging of two
existing 7,700-horsepower compressor
units at North Baja’s existing Ehrenberg
Compressor Station in La Paz County,
Arizona; and
• flow measurement facilities and
piping modifications at North Baja’s
existing El Paso and Ogilby Meter
Stations in La Paz County, Arizona and
Imperial County, California,
respectively.
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Proposed North Baja XPress Project to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the final EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search) select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field
(i.e. CP20–27–000). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
E:\FR\FM\28OCN1.SGM
28OCN1
Federal Register / Vol. 86, No. 206 / Thursday, October 28, 2021 / Notices
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: October 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23482 Filed 10–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2883–000]
jspears on DSK121TN23PROD with NOTICES1
Aquenergy Systems, LLC; Notice of
Authorization for Continued Project
Operation
On May 30, 2018, Aquenergy
Systems, LLC, licensee for the Fries
Hydroelectric Project No.2883, filed an
Application for a New Major License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Fries Hydroelectric
Project is located on the New River in
the Town of Fries, Grayson County,
Virginia.
The license for Project No. 2883 was
issued for a period ending May 31,
2020. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee(s)
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
VerDate Sep<11>2014
17:34 Oct 27, 2021
Jkt 256001
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2883
is issued to Aquenergy Systems, LLC for
a period effective June 1, 2020 through
May 31, 2021 or until the issuance of a
new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before May 31, 2021, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Aquenergy Systems, LLC is
authorized to continue operation of the
Fries Hydroelectric Project, until such
time as the Commission acts on its
application for a new major license.
Dated: October 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23486 Filed 10–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR22–2–000.
Applicants: Southern California Gas
Company.
Description: Submits tariff filing per
284.123(b),(e)+(g): Offshore_Delivery_
Service_Rate_Revision_October_2021 to
be effective 10/1/2021 under PR22–2
Filing.
Filed Date: 10/22/2021.
Accession Number: 20211022–5000.
Comments Due: 5 p.m. ET 11/12/21.
284.123(g) Protests Due: 5 p.m. ET 12/
21/21.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
59703
Docket Numbers: RP22–67–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing:
TETLP OFO October 2021 Penalty
Disbursement Report to be effective N/
A.
Filed Date: 10/20/21.
Accession Number: 20211020–5105.
Comment Date: 5 p.m. ET 11/1/21.
Docket Numbers: RP22–68–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
10.21.21 Negotiated Rates—Castleton
Commodities Merchant Trading H–
4010–89 to be effective 11/1/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5025.
Comment Date: 5 p.m. ET 11/2/21.
Docket Numbers: RP22–69–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
10.21.21 Negotiated Rates—Castleton
Commodities Merchant Trading R–
4010–30 to be effective 11/1/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5026.
Comment Date: 5 p.m. ET 11/2/21.
Docket Numbers: RP22–70–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
10.21.21 Negotiated Rates—Freepoint
Commodities LLC R–7250–39 to be
effective 11/1/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5027.
Comment Date: 5 p.m. ET 11/2/21.
Docket Numbers: RP22–71–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
10.21.21 Negotiated Rates—Freepoint
Commodities LLC R–7250–40 to be
effective 11/1/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5028.
Comment Date: 5 p.m. ET 11/2/21.
Docket Numbers: RP22–72–000.
Applicants: Egan Hub Storage, LLC.
Description: Compliance filing: Egan
Hub Order 587–Z (Docket No. RM96–1–
042) Compliance Filing to be effective 6/
1/2022.
Filed Date: 10/21/21.
Accession Number: 20211021–5032.
Comment Date: 5 p.m. ET 11/2/21.
Docket Numbers: RP22–73–000.
Applicants: Bobcat Gas Storage.
Description: Compliance filing: BGS
Order 587–Z (Docket No. RM96–1–042)
Compliance Filing to be effective 6/1/
2022.
Filed Date: 10/21/21.
Accession Number: 20211021–5039.
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 86, Number 206 (Thursday, October 28, 2021)]
[Notices]
[Pages 59702-59703]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-23482]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-27-000]
North Baja Pipeline, LLC; Notice of Availability of the Final
Environmental Impact Statement for the Proposed North Baja XPress
Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared a final environmental impact statement (EIS)
for the North Baja XPress Project (Project), proposed by North Baja
Pipeline, LLC (North Baja) in the above-referenced docket. North Baja
requests authorization to modify an existing compressor station in La
Paz County, Arizona, as well as install additional flow measurement
facilities and piping modifications at two existing meter stations in
La Paz County, Arizona and Imperial County, California, respectively.
North Baja states that the purpose of the Project is enable the
transport of 495,000 dekatherms per day of natural gas to the United
States/Mexico border for its shipper, Sempra LNG international, LLC.
The final EIS assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act. The final EIS is
not a decision document. It presents Commission staff's independent
analysis of the environmental issues for the Commission to consider
when addressing the merits of all issues in this proceeding.
The final EIS responds to comments that were received on the
Commission's September 8, 2020 Environmental Assessment (EA) and July
9, 2021 draft EIS \1\ and discloses downstream greenhouse gas emissions
for the Project. With the exception of climate change impacts, FERC
staff concludes that approval of the proposed Project, with the
mitigation measures recommended in the EIS, would not result in
significant environmental impacts. FERC staff continues to be unable to
determine significance with regards to climate change impacts.
---------------------------------------------------------------------------
\1\ The Project's EA is available on eLibrary under accession
no. 20200908-3009, and the draft EIS is available under accession
no. 20210709-3005.
---------------------------------------------------------------------------
The U.S. Department of the Interior Bureau of Land Management (BLM)
participated as a cooperating agency in the preparation of the EA and
the EIS. Cooperating agencies have jurisdiction by law or special
expertise with respect to resources potentially affected by the
proposal and participate in the National Environmental Policy Act
analysis. The BLM may adopt and use the EA and EIS to consider the
issuance of a right-of-way grant for the use of a temporary workspace
requested by North Baja on BLM-administered public lands adjacent to
the Ogilby Meter Station in Imperial County, California.
The final EIS incorporates the above-referenced EA, which addressed
the potential environmental effects of the construction and operation
of the following Project facilities:
One new 31,900-horsepower compressor unit and restaging of
two existing 7,700-horsepower compressor units at North Baja's existing
Ehrenberg Compressor Station in La Paz County, Arizona; and
flow measurement facilities and piping modifications at
North Baja's existing El Paso and Ogilby Meter Stations in La Paz
County, Arizona and Imperial County, California, respectively.
The Commission mailed a copy of the Notice of Availability of the
Final Environmental Impact Statement for the Proposed North Baja XPress
Project to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
Project area. The final EIS is only available in electronic format. It
may be viewed and downloaded from the FERC's website (www.ferc.gov), on
the natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In
addition, the final EIS may be accessed by using the eLibrary link on
the FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search) select ``General Search'' and enter
the docket number in the ``Docket Number'' field (i.e. CP20-27-000). Be
sure you have selected an appropriate date range. For assistance,
please contact FERC Online Support at [email protected] or
toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
[[Page 59703]]
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/ferc-online/overview to
register for eSubscription.
Dated: October 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-23482 Filed 10-27-21; 8:45 am]
BILLING CODE 6717-01-P