PacifiCorp; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 59375 [2021-23419]
Download as PDF
Federal Register / Vol. 86, No. 205 / Wednesday, October 27, 2021 / Notices
Applicants: Fairbanks Solar Energy
Center LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 12/21/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5115.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER22–176–000.
Applicants: Fairbanks Solar Holdings
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 12/21/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5116.
Comment Date: 5 p.m. ET 11/12/21.
Docket Numbers: ER22–177–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Interim ISA, Service Agreement No.
6211; Queue No. AE1–155 to be
effective 9/29/2021.
Filed Date: 10/21/21.
Accession Number: 20211021–5127.
Comment Date: 5 p.m. ET 11/12/21.
lotter on DSK11XQN23PROD with NOTICES1
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 21, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–23420 Filed 10–26–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:47 Oct 26, 2021
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15240–000]
PacifiCorp; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 13, 2021, PacifiCorp filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Dry Canyon Pumped
Storage Project (Dry Canyon Project or
project) to be located on Mud Lake, near
Saint Charles, Bear Lake County, Idaho.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A roller-compacted
concrete dam with a height of 530 feet
and a crest length of 2,900 feet; (2) a
rock-armored earthen levee with an
average height of 22 feet above the
bottom of the Mud Lake and a length of
24,242 feet with two inlet/outlet
structures; (3) an upper reservoir with a
surface area of 182 acres and a storage
volume of approximately 26,880 acrefeet; (4) three 22-foot-diameter, 6,650foot-long concrete and steel penstocks;
(5) a 660-foot-long and 110-foot-wide
underground generating/pumping
station chamber with six 300-megawatt
generating/pumping units; (6) three 22foot-diameter, 2,200-foot-long concretelined tailrace tunnels; (7) a lower
reservoir with a surface area of 1,390
acres and a storage volume of 30,680
acre-feet; (8) a 500 kilovolt transmission
line from the powerhouse to a new
substation that would interconnect to
PacifiCorp’s existing or planned
transmission lines; and, (9) appurtenant
facilities. The estimated annual
generation of the Dry Canyon Project
would be 5.4 terawatt-hours.
Applicant Contact: Mark Stenberg,
License Program Manager, PacifiCorp,
822 Grace Power Plant Rd., Grace, ID
83241; email: mark.stenberg@
pacificorp.com; phone: (208) 339–9552.
FERC Contact: Ryan Hansen; email:
ryan.hansen@ferc.gov; phone: (202)
502–8074.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
59375
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. In lieu of electronic
filing, you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15240–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15420) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: October 21, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–23419 Filed 10–26–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14861–002]
FFP Project 101, LLC; Notice of
Meeting
a. Project Name and Number:
Goldendale Energy Storage Project No.
14861–002.
b. Applicant: FFP Project 101, LLC.
c. Date and Time of Meeting:
November 10, 2021 at 12:00 p.m. EST.
d. FERC Contact: Michael Tust, (202)
502–6522, michael.tust@ferc.gov.
e. Purpose of Meeting: Commission
staff will hold a virtual meeting with
staff from the Confederated Tribes and
Bands of the Yakama Nation (Yakama
Tribe) to discuss the Commission’s role
E:\FR\FM\27OCN1.SGM
27OCN1
Agencies
[Federal Register Volume 86, Number 205 (Wednesday, October 27, 2021)]
[Notices]
[Page 59375]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-23419]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15240-000]
PacifiCorp; Notice of Preliminary Permit Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On October 13, 2021, PacifiCorp filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Dry Canyon Pumped Storage
Project (Dry Canyon Project or project) to be located on Mud Lake, near
Saint Charles, Bear Lake County, Idaho. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A roller-
compacted concrete dam with a height of 530 feet and a crest length of
2,900 feet; (2) a rock-armored earthen levee with an average height of
22 feet above the bottom of the Mud Lake and a length of 24,242 feet
with two inlet/outlet structures; (3) an upper reservoir with a surface
area of 182 acres and a storage volume of approximately 26,880 acre-
feet; (4) three 22-foot-diameter, 6,650-foot-long concrete and steel
penstocks; (5) a 660-foot-long and 110-foot-wide underground
generating/pumping station chamber with six 300-megawatt generating/
pumping units; (6) three 22-foot-diameter, 2,200-foot-long concrete-
lined tailrace tunnels; (7) a lower reservoir with a surface area of
1,390 acres and a storage volume of 30,680 acre-feet; (8) a 500
kilovolt transmission line from the powerhouse to a new substation that
would interconnect to PacifiCorp's existing or planned transmission
lines; and, (9) appurtenant facilities. The estimated annual generation
of the Dry Canyon Project would be 5.4 terawatt-hours.
Applicant Contact: Mark Stenberg, License Program Manager,
PacifiCorp, 822 Grace Power Plant Rd., Grace, ID 83241; email:
[email protected]; phone: (208) 339-9552.
FERC Contact: Ryan Hansen; email: [email protected]; phone:
(202) 502-8074.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15240-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15420) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: October 21, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-23419 Filed 10-26-21; 8:45 am]
BILLING CODE 6717-01-P