Pacific Gas and Electric Company; Notice of Filing, 56928-56929 [2021-22228]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
56928
Federal Register / Vol. 86, No. 195 / Wednesday, October 13, 2021 / Notices
a. Type of Application: Subsequent
Minor License.
b. Project No.: 4639–033.
c. Date Filed: September 29, 2021.
d. Applicant: Ampersand Christine
Falls Hydro, LLC.
e. Name of Project: Christine Falls
Hydroelectric Project (Christine Falls
Project).
f. Location: On the Sacandaga River
near the Village of Speculator, Hamilton
County, New York. The project does not
occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Mr. Sayad
Moudachirou, Licensing Manager,
Ampersand Christine Falls Hydro LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111, Phone: 617–933–7206,
Email: sayad@ampersandenergy.com;
and Mr. Jason Huang, Asset Manager,
Ampersand Christine Falls Hydro LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111, Phone: 773–919–0923,
Email: jasonh@ampersandenergy.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660; or email at
andrew.bernick@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 28, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
VerDate Sep<11>2014
18:01 Oct 12, 2021
Jkt 256001
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Christine Falls Project
(P–4639–033).
m. This application is not ready for
environmental analysis at this time.
n. The Christine Falls Project consists
of the following existing facilities: (1) A
15-foot-high, 165-foot-long concrete
gravity dam, with 3-foot-high wooden
flashboards installed along the crest of
the 135-foot-long spillway; (2) a 1.1-acre
reservoir with a normal water surface
elevation of 1,699.7 feet at mean sea
level; (3) an intake structure; (4) a 650foot-long steel penstock with a diameter
of 72 inches; (5) a brick powerhouse
containing two turbine-generator units
(i.e., one 275-kilowatt (kW) unit and one
575-kW unit) with a total capacity of
850 kW; (6) a tailrace with a minimum
depth of 21 feet; (7) a 610-foot-long
bypassed reach; (8) an approximately
1.6-mile-long, 4.16/13.2-kilovolt
underground transmission line
connecting the powerhouse to a point of
interconnection; and (9) appurtenant
facilities.
The Christine Falls Project is operated
in a run-of-river mode with an average
annual generation of 2,478 megawatthours.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
November 2021
Request Additional Information—
November 2021
Issue Acceptance Letter—February 2022
Issue Scoping Document 1 for
comments—March 2022
Request Additional Information (if
necessary)—May 2022
Issue Scoping Document 2—June 2022
Issue Notice of Ready for Environmental
Analysis—June 2022
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: October 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22227 Filed 10–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2001–000]
Pacific Gas and Electric Company;
Notice of Filing
Take notice that on September 15,
2021, Pacific Gas and Electric Company
(PG&E) requested confirmation of an
ongoing extension of the due date for
the submission of a portion of PG&E’s
Electric Quarterly Report data relating to
bilateral contracts and transactions.1
Specifically, PG&E seeks confirmation
of its practice of submitting transaction
information received from the California
Independent System Operator
Corporation for a given quarter by the
filing deadline for the following quarter.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
1 The Commission granted PG&E’s market-based
rate authority in Docket No. ER03–198–000
effective December 19, 2002.
E:\FR\FM\13OCN1.SGM
13OCN1
Federal Register / Vol. 86, No. 195 / Wednesday, October 13, 2021 / Notices
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Time on November 5, 2021.
Dated: October 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22228 Filed 10–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK121TN23PROD with NOTICES1
[Project No. 3472–024]
Aspinook Hydro, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
VerDate Sep<11>2014
18:01 Oct 12, 2021
Jkt 256001
b. Project No.: 3472–024.
c. Date Filed: April 30, 2020.
d. Applicant: Aspinook Hydro, LLC
(Aspinook Hydro).
e. Name of Project: Wyre Wynd
Hydroelectric Project (Wyre Wynd
Project).
f. Location: On the Quinebaug River
in New London and Windham Counties,
Connecticut. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mark
Boumansour, Chief Operating Officer,
Gravity Renewables, Inc., 1401 Walnut
Street, Boulder, CO 80302; Phone at
(303) 440–3378, or email at mark@
gravityrenewables.com.
i. FERC Contact: Kristine Sillett at
(202) 502–6575, or kristine.sillett@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–3472–
024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
56929
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed Wyre Wynd Project.
Commission staff intends to conduct its
NEPA review in accordance with CEQ’s
new regulations.
l. The Wyre Wynd Project consists of
the following existing facilities: (1) A
538-foot-long dam that includes: (a) A
473-foot-long central spillway with 2foot-high flashboards, and one sluice
gate; (b) a 55-foot-long east abutment
that includes a headgate structure with
five gates; and (c) a 10-foot-long west
abutment; (2) a 333-acre impoundment
at a normal elevation of 97.3 feet NGVD
29; 1 (3) a 170-foot-long forebay that
includes: (a) An auxiliary spillway; and
(b) two outlet gates; (4) a powerhouse
intake that includes: (a) A trash rack
structure with 2.6 inch bar spacing; and
(b) a 16-foot-long penstock that extends
to the main, 2.7-megawatt (MW)
turbine-generator unit within the
powerhouse; (5) a 450-foot-long tailrace
that receives discharges from the main
unit; (6) a second intake structure
branching off the forebay that includes:
(a) A 4-foot-diameter intake opening; (b)
a trash rack structure with 1.5-inch bar
spacing; and (c) a 45-foot-long penstock
that extends to an in-line mini, 0.08–
MW turbine-generator unit; (7) a 350foot-long tailrace that receives
discharges from the mini unit; (8) a 600volt (V), 10-foot-long main generator
lead, and a 600–V, 200-foot-long mini
lead; (9) an 80-foot-long, 600–V
transmission line; and (10) appurtenant
facilities. The project generates an
average of 11,000 megawatt-hours
annually.
Aspinook Hydro proposes to: (1)
Operate the project in a run-of-river
mode with a 1-inch impoundment
fluctuation band; (2) provide a
continuous minimum flow of 84-cubic
feet per second to the bypassed reach;
1 National
E:\FR\FM\13OCN1.SGM
Geodetic Vertical Datum of 1929.
13OCN1
Agencies
[Federal Register Volume 86, Number 195 (Wednesday, October 13, 2021)]
[Notices]
[Pages 56928-56929]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-22228]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER02-2001-000]
Pacific Gas and Electric Company; Notice of Filing
Take notice that on September 15, 2021, Pacific Gas and Electric
Company (PG&E) requested confirmation of an ongoing extension of the
due date for the submission of a portion of PG&E's Electric Quarterly
Report data relating to bilateral contracts and transactions.\1\
Specifically, PG&E seeks confirmation of its practice of submitting
transaction information received from the California Independent System
Operator Corporation for a given quarter by the filing deadline for the
following quarter.
---------------------------------------------------------------------------
\1\ The Commission granted PG&E's market-based rate authority in
Docket No. ER03-198-000 effective December 19, 2002.
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy
[[Page 56929]]
of that document on the Applicant. On or before the comment date, it is
not necessary to serve motions to intervene or protests on persons
other than the Applicant.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Hand delivered submissions in
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on November 5, 2021.
Dated: October 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-22228 Filed 10-12-21; 8:45 am]