Ampersand Christine Falls Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 56927-56928 [2021-22227]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
Federal Register / Vol. 86, No. 195 / Wednesday, October 13, 2021 / Notices
rock ledge adjacent to the dam with 2.5foot-high pipe-supported flashboards;
(3) a reservoir with a surface area of 4.8
acres with a normal water surface
elevation of 350 feet mean sea level; (4)
an intake structure; (5) a divided, 45foot-long, reinforced concrete penstock;
(6) a powerhouse containing two
turbine-generator units of 1.5 megawatts
and 0.6 megawatts; (7) a substation; (8)
a 1,500-foot-long, 46.0-kilovolt buried
transmission line; and (9) appurtenant
facilities.
The Alice Falls Project is operated in
a run-of-river mode with an average
annual generation of 4,021 megawatthours.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)
November 2021
Request Additional Information
November 2021
Issue Acceptance Letter February 2022
Issue Scoping Document 1 for
comments March 2022
Request Additional Information (if
necessary) May 2022
Issue Scoping Document 2 June 2022
Issue Notice of Ready for Environmental
Analysis June 2022
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: October 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22185 Filed 10–12–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:01 Oct 12, 2021
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC22–2–000.
Applicants: Stanly Solar, LLC, PGR
2021 Lessee 1, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Stanly Solar, LLC,
et al.
Filed Date: 10/1/21.
Accession Number: 20211001–5377.
Comment Date: 5 p.m. ET 10/22/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–1280–003.
Applicants: Southern California
Edison Company.
Description: Compliance filing: SCE
Refile Compliance Filing—Morongo
WOD Formula Rate Protocols to be
effective 5/5/2021.
Filed Date: 10/6/21.
Accession Number: 20211006–5076.
Comment Date: 5 p.m. ET 10/20/21.
Docket Numbers: ER21–2819–001.
Applicants: South Field Energy LLC.
Description: Tariff Amendment:
Supplemental Filing of South Field
Energy LLC and Request for Waiver to
be effective 10/1/2021.
Filed Date: 10/6/21.
Accession Number: 20211006–5113.
Comment Date: 5 p.m. ET 10/27/21.
Docket Numbers: ER21–2944–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Service Agreement for Gilroy Energy
Center, LLC, Service Agreement (No. 25)
of Pacific Gas and Electric Company.
Filed Date: 9/24/21.
Accession Number: 20210924–5182.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER22–48–000.
Applicants: Gridflex Generation, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate to be
effective 12/6/2021.
Filed Date: 10/5/21.
Accession Number: 20211005–5107.
Comment Date: 5 p.m. ET 10/26/21.
Docket Numbers: ER22–49–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Rate Schedule No. 335
to be effective 12/6/2021.
Filed Date: 10/6/21.
Accession Number: 20211006–5018.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
56927
Comment Date: 5 p.m. ET 10/27/21.
Docket Numbers: ER22–50–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Annual Calculation of
the Cost of New Entry value (‘‘Cone’’)
for each Local Resource Zone (‘‘LRZ’’)
in the MISO Region of Midcontinent
Independent System Operator, Inc.
Filed Date: 10/4/21.
Accession Number: 20211004–5267.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–51–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 6191; Queue No.
P11 to be effective 9/9/2021.
Filed Date: 10/6/21.
Accession Number: 20211006–5086.
Comment Date: 5 p.m. ET 10/27/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 6, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–22219 Filed 10–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4639–033]
Ampersand Christine Falls Hydro, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
E:\FR\FM\13OCN1.SGM
13OCN1
jspears on DSK121TN23PROD with NOTICES1
56928
Federal Register / Vol. 86, No. 195 / Wednesday, October 13, 2021 / Notices
a. Type of Application: Subsequent
Minor License.
b. Project No.: 4639–033.
c. Date Filed: September 29, 2021.
d. Applicant: Ampersand Christine
Falls Hydro, LLC.
e. Name of Project: Christine Falls
Hydroelectric Project (Christine Falls
Project).
f. Location: On the Sacandaga River
near the Village of Speculator, Hamilton
County, New York. The project does not
occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Mr. Sayad
Moudachirou, Licensing Manager,
Ampersand Christine Falls Hydro LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111, Phone: 617–933–7206,
Email: sayad@ampersandenergy.com;
and Mr. Jason Huang, Asset Manager,
Ampersand Christine Falls Hydro LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111, Phone: 773–919–0923,
Email: jasonh@ampersandenergy.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660; or email at
andrew.bernick@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 28, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
VerDate Sep<11>2014
18:01 Oct 12, 2021
Jkt 256001
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Christine Falls Project
(P–4639–033).
m. This application is not ready for
environmental analysis at this time.
n. The Christine Falls Project consists
of the following existing facilities: (1) A
15-foot-high, 165-foot-long concrete
gravity dam, with 3-foot-high wooden
flashboards installed along the crest of
the 135-foot-long spillway; (2) a 1.1-acre
reservoir with a normal water surface
elevation of 1,699.7 feet at mean sea
level; (3) an intake structure; (4) a 650foot-long steel penstock with a diameter
of 72 inches; (5) a brick powerhouse
containing two turbine-generator units
(i.e., one 275-kilowatt (kW) unit and one
575-kW unit) with a total capacity of
850 kW; (6) a tailrace with a minimum
depth of 21 feet; (7) a 610-foot-long
bypassed reach; (8) an approximately
1.6-mile-long, 4.16/13.2-kilovolt
underground transmission line
connecting the powerhouse to a point of
interconnection; and (9) appurtenant
facilities.
The Christine Falls Project is operated
in a run-of-river mode with an average
annual generation of 2,478 megawatthours.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
November 2021
Request Additional Information—
November 2021
Issue Acceptance Letter—February 2022
Issue Scoping Document 1 for
comments—March 2022
Request Additional Information (if
necessary)—May 2022
Issue Scoping Document 2—June 2022
Issue Notice of Ready for Environmental
Analysis—June 2022
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: October 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22227 Filed 10–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2001–000]
Pacific Gas and Electric Company;
Notice of Filing
Take notice that on September 15,
2021, Pacific Gas and Electric Company
(PG&E) requested confirmation of an
ongoing extension of the due date for
the submission of a portion of PG&E’s
Electric Quarterly Report data relating to
bilateral contracts and transactions.1
Specifically, PG&E seeks confirmation
of its practice of submitting transaction
information received from the California
Independent System Operator
Corporation for a given quarter by the
filing deadline for the following quarter.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
1 The Commission granted PG&E’s market-based
rate authority in Docket No. ER03–198–000
effective December 19, 2002.
E:\FR\FM\13OCN1.SGM
13OCN1
Agencies
[Federal Register Volume 86, Number 195 (Wednesday, October 13, 2021)]
[Notices]
[Pages 56927-56928]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-22227]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4639-033]
Ampersand Christine Falls Hydro, LLC; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
[[Page 56928]]
a. Type of Application: Subsequent Minor License.
b. Project No.: 4639-033.
c. Date Filed: September 29, 2021.
d. Applicant: Ampersand Christine Falls Hydro, LLC.
e. Name of Project: Christine Falls Hydroelectric Project
(Christine Falls Project).
f. Location: On the Sacandaga River near the Village of Speculator,
Hamilton County, New York. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Mr. Sayad Moudachirou, Licensing Manager,
Ampersand Christine Falls Hydro LLC, 717 Atlantic Avenue, Suite 1A,
Boston, MA 02111, Phone: 617-933-7206, Email:
[email protected]; and Mr. Jason Huang, Asset Manager,
Ampersand Christine Falls Hydro LLC, 717 Atlantic Avenue, Suite 1A,
Boston, MA 02111, Phone: 773-919-0923, Email:
[email protected].
i. FERC Contact: Andy Bernick at (202) 502-8660; or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: November 28, 2021.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Christine Falls
Project (P-4639-033).
m. This application is not ready for environmental analysis at this
time.
n. The Christine Falls Project consists of the following existing
facilities: (1) A 15-foot-high, 165-foot-long concrete gravity dam,
with 3-foot-high wooden flashboards installed along the crest of the
135-foot-long spillway; (2) a 1.1-acre reservoir with a normal water
surface elevation of 1,699.7 feet at mean sea level; (3) an intake
structure; (4) a 650-foot-long steel penstock with a diameter of 72
inches; (5) a brick powerhouse containing two turbine-generator units
(i.e., one 275-kilowatt (kW) unit and one 575-kW unit) with a total
capacity of 850 kW; (6) a tailrace with a minimum depth of 21 feet; (7)
a 610-foot-long bypassed reach; (8) an approximately 1.6-mile-long,
4.16/13.2-kilovolt underground transmission line connecting the
powerhouse to a point of interconnection; and (9) appurtenant
facilities.
The Christine Falls Project is operated in a run-of-river mode with
an average annual generation of 2,478 megawatt-hours.
o. A copy of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact FERC Online Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--November 2021
Request Additional Information--November 2021
Issue Acceptance Letter--February 2022
Issue Scoping Document 1 for comments--March 2022
Request Additional Information (if necessary)--May 2022
Issue Scoping Document 2--June 2022
Issue Notice of Ready for Environmental Analysis--June 2022
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: October 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-22227 Filed 10-12-21; 8:45 am]
BILLING CODE 6717-01-P