City of Nashua, New Hampshire; Notice of Effectiveness of Withdrawal of Exemption Amendment Application, 56261-56262 [2021-22065]
Download as PDF
Federal Register / Vol. 86, No. 193 / Friday, October 8, 2021 / Notices
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,5 and must be submitted by
the protest deadline, which is December
3, 2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
jspears on DSK121TN23PROD with NOTICES1
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 6 and the regulations under
the NGA 7 by the intervention deadline
for the project, which is December 3,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
5 18
CFR 157.205(e).
CFR 385.214.
7 18 CFR 157.10.
6 18
VerDate Sep<11>2014
17:07 Oct 07, 2021
Jkt 256001
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before December
3, 2021. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–499–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 8
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP21–499–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, or by phone at
832.320.5477, or by email at David_
alonzo@tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
8 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
56261
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: October 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22066 Filed 10–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7590–015]
City of Nashua, New Hampshire;
Notice of Effectiveness of Withdrawal
of Exemption Amendment Application
On June 1, 2021, the City of Nashua,
New Hampshire (City of Nashua) filed
an application to amend the exemption
from licensing for the Jackson Mills
Project No. 7590. On September 14,
2021, the City of Nashua notified the
Commission that it was withdrawing its
application.
No motion in opposition to the notice
of withdrawal has been filed, and the
Commission has taken no action to
disallow the withdrawal. Pursuant to
Rule 216(b) of the Commission’s Rules
of Practice and Procedure,1 the
withdrawal of the amendment
application became effective on
September 29, 2021, and this
proceeding is hereby terminated.
1 18
E:\FR\FM\08OCN1.SGM
CFR 385.216(b) (2020).
08OCN1
56262
Federal Register / Vol. 86, No. 193 / Friday, October 8, 2021 / Notices
Dated: October 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–22065 Filed 10–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–21–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Summary of Negotiated Rate Capacity
Release Agreements on 10–4–21 to be
effective 10/1/2021.
Filed Date: 10/4/21.
Accession Number: 20211004–5007.
Comment Date: 5 p.m. ET 10/18/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 04, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–22022 Filed 10–7–21; 8:45 am]
BILLING CODE 6717–01–P
jspears on DSK121TN23PROD with NOTICES1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–801–013.
VerDate Sep<11>2014
17:07 Oct 07, 2021
Jkt 256001
Applicants: Constellation Power
Source Generation, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 10/1/21.
Accession Number: 20211001–5182.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER17–803–005.
Applicants: Handsome Lake Energy,
LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 10/1/21.
Accession Number: 20211001–5180.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21–45–002.
Applicants: Calvert Cliffs Nuclear
Power Plant, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 10/1/21.
Accession Number: 20211001–5185.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21–45–002.
Applicants: Calvert Cliffs Nuclear
Power Plant, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 10/1/21.
Accession Number: 20211001–5185.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21–500–001.
Applicants: Exelon Generation
Company, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 10/1/21.
Accession Number: 20211001–5188.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21–2330–000;
ER21–2331–000; ER21–2333–000;
ER21–2336–000.
Applicants: Tecolote Wind LLC, Red
Cloud Wind LLC, Duran Mesa LLC,
Clines Corners Wind Farm LLC.
Description: Supplement to July 1,
2021 Clines Corners Wind Farm LLC, et
al. tariff filing.
Filed Date: 9/29/21.
Accession Number: 20210929–5183.
Comment Date: 5 p.m. ET 10/13/21.
Docket Numbers: ER21–2877–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing Compliance Filing in
ER21–2877 to be effective 9/2/2021.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Filed Date: 10/4/21.
Accession Number: 20211004–5026.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–26–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Administrative Cost
Recovery Charges to be effective 12/2/
2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5184.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–27–000.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: § 205(d) Rate Filing: 2022
Rate Change Filing to be effective 1/1/
2022.
Filed Date: 10/4/21.
Accession Number: 20211004–5003.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–28–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2021–10–04_SA 3713
WAPA–OTP FCA (Devils Lake) to be
effective 9/30/2021.
Filed Date: 10/4/21.
Accession Number: 20211004–5018.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–29–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2021–10–04_SA 3715
Ameren Missouri-Hannibal
Construction Agreement to be effective
12/4/2021.
Filed Date: 10/4/21.
Accession Number: 20211004–5023.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–30–000.
Applicants: Alabama Power
Company.
Description: Tariff Amendment:
Urban Grid Solar Projects (Chase Solar)
LGIA Termination Filing to be effective
10/4/2021.
Filed Date: 10/4/21.
Accession Number: 20211004–5025.
Comment Date: 5 p.m. ET 10/25/21.
Docket Numbers: ER22–31–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Wadley Solar Amended and Restated
LGIA Filing to be effective 9/20/2021.
Filed Date: 10/4/21.
Accession Number: 20211004–5030.
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 86, Number 193 (Friday, October 8, 2021)]
[Notices]
[Pages 56261-56262]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-22065]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7590-015]
City of Nashua, New Hampshire; Notice of Effectiveness of
Withdrawal of Exemption Amendment Application
On June 1, 2021, the City of Nashua, New Hampshire (City of Nashua)
filed an application to amend the exemption from licensing for the
Jackson Mills Project No. 7590. On September 14, 2021, the City of
Nashua notified the Commission that it was withdrawing its application.
No motion in opposition to the notice of withdrawal has been filed,
and the Commission has taken no action to disallow the withdrawal.
Pursuant to Rule 216(b) of the Commission's Rules of Practice and
Procedure,\1\ the withdrawal of the amendment application became
effective on September 29, 2021, and this proceeding is hereby
terminated.
---------------------------------------------------------------------------
\1\ 18 CFR 385.216(b) (2020).
[[Page 56262]]
---------------------------------------------------------------------------
Dated: October 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-22065 Filed 10-7-21; 8:45 am]
BILLING CODE 6717-01-P