Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants, 56295-56296 [2021-22020]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
Federal Register / Vol. 86, No. 193 / Friday, October 8, 2021 / Notices
welcomes any and all input. Examples
of materials could include, but are not
limited to: (1) Codes of conduct; (2) Sets
of standards used for implementation of
codes in specific industries or locations
or among particular labor populations;
(3) Auditing/monitoring systems, or
components of such systems, as well as
related systems for enforcement of labor
standards across a supply chain; (4)
Strategies for monitoring sub-tier
suppliers, informal workplaces,
homework, and other challenging
environments; (5) Training modules and
other mechanisms for communicating
expectations to stakeholders which
incorporate worker input; (6)
Traceability models or experiences; (7)
Remediation strategies for children and/
or adults found in conditions of forced
or child labor; (8) Reporting-related
practices and practices related to
independent review; (9) Projects at the
grassroots level which address
underlying issues or root causes of child
labor or forced labor; (10) and/or any
other relevant practices.
In addition, ILAB is seeking
information on current practices of
governments to collaborate with private
sector actors through public-private
partnerships to reduce the likelihood of
child labor and forced labor in the
production of goods. Submissions may
include policy documents, reports,
statistics, case studies, and many other
formats. In addition, ILAB welcomes
submissions of reports, analyses,
guidance, toolkits, and other documents
in which such practices have been
compiled or analyzed by third-party
groups. Information should be
submitted to the addresses and within
the time period set forth above. DOL
seeks information that can be used to
inform the development of tools and
resources to be disseminated publicly
on the DOL website and/or in other
publications. However, in disseminating
information, DOL will conceal, to the
extent permitted by law, the identity of
the submitter and/or the individual or
company using the practice in question,
upon request. Internal, confidential
documents that cannot be shared with
the public will not be used.
Submissions containing confidential or
personal information may be redacted
by DOL before being made available to
the public, in accordance with
applicable laws and regulations. DOL
does not commit to responding directly
to submissions or returning submissions
to the submitters, but DOL may
communicate with the submitter
regarding any matters relating to the
submission.
This notice is a general solicitation of
comments from the public.
VerDate Sep<11>2014
17:07 Oct 07, 2021
Jkt 256001
56295
Authority: 22 U.S.C. 7112(b)(2)(C) &
(D) and 19 U.S.C. 2464; Executive Order
13126.
Delegation of Authority to Close
Advisory Committee Meetings, dated
April 15, 2016.
Signed at Washington, DC, this first day of
October, 2021.
Thea Mei Lee,
Deputy Undersecretary.
Dated: October 5, 2021.
Samuel Roth,
Attorney-Advisor, National Endowment for
the Humanities.
[FR Doc. 2021–21977 Filed 10–7–21; 8:45 am]
[FR Doc. 2021–22051 Filed 10–7–21; 8:45 am]
BILLING CODE 4510–28–P
BILLING CODE 7536–01–P
NATIONAL FOUNDATION ON THE
ARTS AND THE HUMANITIES
NEIGHBORHOOD REINVESTMENT
CORPORATION
Federal Council on the Arts and the
Humanities
Sunshine Act Meetings
1:30 p.m., Monday,
October 18, 2021.
PLACE: Via Conference Call.
STATUS: This meeting will be closed to
the public.
MATTERS TO BE CONSIDERED: Special
Audit Committee meeting
TIME AND DATE:
Arts and Artifacts Indemnity Panel
Advisory Committee
Federal Council on the Arts
and the Humanities; National
Foundation on the Arts and the
Humanities.
ACTION: Notice of meeting.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, notice is
hereby given that the Federal Council
on the Arts and the Humanities will
hold a meeting of the Arts and Artifacts
International Indemnity Panel.
DATES: The meeting will be held on
Wednesday, November 17, 2021, from
12:00 p.m. until adjourned.
ADDRESSES: The meeting will be held by
videoconference originating at the
National Endowment for the Arts,
Washington, DC 20506.
FOR FURTHER INFORMATION CONTACT:
Elizabeth Voyatzis, Committee
Management Officer, 400 7th Street SW,
Room 4060, Washington, DC 20506,
(202) 606–8322; evoyatzis@neh.gov.
SUPPLEMENTARY INFORMATION: The
purpose of the meeting is for panel
review, discussion, evaluation, and
recommendation on applications for
Certificates of Indemnity submitted to
the Federal Council on the Arts and the
Humanities, for exhibitions beginning
on or after January 1, 2022. Because the
meeting will consider proprietary
financial and commercial data provided
in confidence by indemnity applicants,
and material that is likely to disclose
trade secrets or other privileged or
confidential information, and because it
is important to keep the values of
objects to be indemnified and the
methods of transportation and security
measures confidential, I have
determined that that the meeting will be
closed to the public pursuant to
subsection (c)(4) of section 552b of Title
5, United States Code. I have made this
determination under the authority
granted me by the Chairman’s
SUMMARY:
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
Agenda
I. CALL TO ORDER
II. Sunshine Act Vote to Close Meeting
III. Executive Session
IV. Other Matter
V. Adjournment
CONTACT PERSON FOR MORE INFORMATION:
Lakeyia Thompson, Special Assistant,
(202) 524–9940; lthompson@nw.org.
Lakeyia Thompson,
Special Assistant.
[FR Doc. 2021–22089 Filed 10–6–21; 11:15 am]
BILLING CODE 7570–02–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0035]
Information Collection: Requirements
for Renewal of Operating Licenses for
Nuclear Power Plants
Nuclear Regulatory
Commission.
ACTION: Notice of submission to the
Office of Management and Budget;
request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has recently
submitted a request for renewal of an
existing collection of information to the
Office of Management and Budget
(OMB) for review. The information
collection is entitled, ‘‘Requirements for
Renewal of Operating Licenses for
Nuclear Power Plants.’’
DATES: Submit comments by November
8, 2021. Comments received after this
date will be considered if it is practical
to do so, but the Commission is able to
SUMMARY:
E:\FR\FM\08OCN1.SGM
08OCN1
56296
Federal Register / Vol. 86, No. 193 / Friday, October 8, 2021 / Notices
ensure consideration only for comments
received on or before this date.
Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
David C. Cullison, NRC Clearance
Officer, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2084; email:
Infocollects.Resource@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
jspears on DSK121TN23PROD with NOTICES1
A. Obtaining Information
Please refer to Docket ID NRC–2021–
0035 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2021–0035.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The supporting statement is
available in ADAMS under Accession
No. ML21168A068.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call 1–
800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (ET),
Monday through Friday, except Federal
holidays.
• NRC’s Clearance Officer: A copy of
the collection of information and related
instructions may be obtained without
charge by contacting the NRC’s
Clearance Officer, David C. Cullison,
Office of the Chief Information Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
Infocollects.Resource@nrc.gov.
VerDate Sep<11>2014
17:07 Oct 07, 2021
Jkt 256001
B. Submitting Comments
Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov/ and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the OMB, then you
should inform those persons not to
include identifying or contact
information that they do not want to be
publicly disclosed in their comment
submission. Your request should state
that comment submissions are not
routinely edited to remove such
information before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the NRC recently
submitted a request for renewal of an
existing collection of information to
OMB for review entitled, Part 54 of title
10 of the Code of Federal Regulations
(10 CFR), ‘‘Requirements for Renewal of
Operating Licenses for Nuclear Power
Plants.’’ The NRC hereby informs
potential respondents that an agency
may not conduct or sponsor, and that a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
May 19, 2021 (86 FR 27119). On August
23, 2021, the NRC published a Federal
Register notice with a 30-day comment
period (86 FR 47166). The NRC was
delayed in submitting the renewal to
OMB, therefore, the NRC is reissuing
this information collection to provide
the public the full 30 days to submit
comments.
1. The title of the information
collection: 10 CFR part 54
‘‘Requirements for Renewal of Operating
Licenses for Nuclear Power Plants.’’
PO 00000
Frm 00058
Fmt 4703
Sfmt 9990
2. OMB approval number: 3150–0155.
3. Type of submission: Extension.
4. The form number, if applicable:
Not Applicable.
5. How often the collection is required
or requested: There is a one-time
application for any licensee wishing to
renew the operating license for its
nuclear power plant. There is a one-time
requirement for each licensee with a
renewed operating license to submit a
letter documenting the completion of
inspection and testing activities. All
holders of renewed licenses must
perform yearly record keeping.
6. Who will be required or asked to
respond: Commercial nuclear power
plant licensees who wish to renew their
operating licenses and holders of
renewed licenses.
7. The estimated number of annual
responses: 66 (11 reporting responses +
55 recordkeepers).
8. The estimated number of annual
respondents: 62 (1 initial license
renewal application + 1 subsequent
license renewal application + 5
completion letters + 55 recordkeepers).
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
request: 216,700 (160,200 hours
reporting + 56,500 hours
recordkeeping).
10. Abstract: 10 CFR part 54
establishes license renewal
requirements for commercial nuclear
power plants and describes the
information that licensees must submit
to the NRC when applying for a license
renewal. The application must contain
information on how the licensee will
manage the detrimental effects of agerelated degradation on certain plant
systems, structures, and components to
continue the plant’s safe operation
during the renewal term. The NRC
needs this information to determine
whether the licensee’s actions will be
effective in assuring the plants’
continued safe operation during the
period of extended operation. Holders of
renewed licenses must retain in an
auditable and retrievable form, for the
term of the renewed operating license,
all information and documentation
required to document compliance with
10 CFR part 54. The NRC needs access
to this information for continuing
effective regulatory oversight.
Dated: October 5, 2021.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2021–22020 Filed 10–7–21; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 86, Number 193 (Friday, October 8, 2021)]
[Notices]
[Pages 56295-56296]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-22020]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0035]
Information Collection: Requirements for Renewal of Operating
Licenses for Nuclear Power Plants
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of submission to the Office of Management and Budget;
request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has recently
submitted a request for renewal of an existing collection of
information to the Office of Management and Budget (OMB) for review.
The information collection is entitled, ``Requirements for Renewal of
Operating Licenses for Nuclear Power Plants.''
DATES: Submit comments by November 8, 2021. Comments received after
this date will be considered if it is practical to do so, but the
Commission is able to
[[Page 56296]]
ensure consideration only for comments received on or before this date.
ADDRESSES: Written comments and recommendations for the proposed
information collection should be sent within 30 days of publication of
this notice to https://www.reginfo.gov/public/do/PRAMain. Find this
particular information collection by selecting ``Currently under
Review--Open for Public Comments'' or by using the search function.
FOR FURTHER INFORMATION CONTACT: David C. Cullison, NRC Clearance
Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-2084; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0035 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2021-0035.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The supporting statement is available
in ADAMS under Accession No. ML21168A068.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through
Friday, except Federal holidays.
NRC's Clearance Officer: A copy of the collection of
information and related instructions may be obtained without charge by
contacting the NRC's Clearance Officer, David C. Cullison, Office of
the Chief Information Officer, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-2084; email:
[email protected].
B. Submitting Comments
Written comments and recommendations for the proposed information
collection should be sent within 30 days of publication of this notice
to https://www.reginfo.gov/public/do/PRAMain. Find this particular
information collection by selecting ``Currently under Review--Open for
Public Comments'' or by using the search function.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed in your comment submission. All comment submissions are
posted at https://www.regulations.gov/ and entered into ADAMS. Comment
submissions are not routinely edited to remove identifying or contact
information.
If you are requesting or aggregating comments from other persons
for submission to the OMB, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that comment submissions are not routinely edited to remove such
information before making the comment submissions available to the
public or entering the comment into ADAMS.
II. Background
Under the provisions of the Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the NRC recently submitted a request for renewal of
an existing collection of information to OMB for review entitled, Part
54 of title 10 of the Code of Federal Regulations (10 CFR),
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants.'' The NRC hereby informs potential respondents that an agency
may not conduct or sponsor, and that a person is not required to
respond to, a collection of information unless it displays a currently
valid OMB control number.
The NRC published a Federal Register notice with a 60-day comment
period on this information collection on May 19, 2021 (86 FR 27119). On
August 23, 2021, the NRC published a Federal Register notice with a 30-
day comment period (86 FR 47166). The NRC was delayed in submitting the
renewal to OMB, therefore, the NRC is reissuing this information
collection to provide the public the full 30 days to submit comments.
1. The title of the information collection: 10 CFR part 54
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants.''
2. OMB approval number: 3150-0155.
3. Type of submission: Extension.
4. The form number, if applicable: Not Applicable.
5. How often the collection is required or requested: There is a
one-time application for any licensee wishing to renew the operating
license for its nuclear power plant. There is a one-time requirement
for each licensee with a renewed operating license to submit a letter
documenting the completion of inspection and testing activities. All
holders of renewed licenses must perform yearly record keeping.
6. Who will be required or asked to respond: Commercial nuclear
power plant licensees who wish to renew their operating licenses and
holders of renewed licenses.
7. The estimated number of annual responses: 66 (11 reporting
responses + 55 recordkeepers).
8. The estimated number of annual respondents: 62 (1 initial
license renewal application + 1 subsequent license renewal application
+ 5 completion letters + 55 recordkeepers).
9. The estimated number of hours needed annually to comply with the
information collection requirement or request: 216,700 (160,200 hours
reporting + 56,500 hours recordkeeping).
10. Abstract: 10 CFR part 54 establishes license renewal
requirements for commercial nuclear power plants and describes the
information that licensees must submit to the NRC when applying for a
license renewal. The application must contain information on how the
licensee will manage the detrimental effects of age-related degradation
on certain plant systems, structures, and components to continue the
plant's safe operation during the renewal term. The NRC needs this
information to determine whether the licensee's actions will be
effective in assuring the plants' continued safe operation during the
period of extended operation. Holders of renewed licenses must retain
in an auditable and retrievable form, for the term of the renewed
operating license, all information and documentation required to
document compliance with 10 CFR part 54. The NRC needs access to this
information for continuing effective regulatory oversight.
Dated: October 5, 2021.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2021-22020 Filed 10-7-21; 8:45 am]