Combined Notice of Filings #1, 55833-55835 [2021-21943]
Download as PDF
Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices
lotter on DSK11XQN23PROD with NOTICES1
public comment addressing the
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Higher Education
Emergency Relief Fund (HEERF) I, II
and III Data Collection Form.
OMB Control Number: 1840–0850.
Type of Review: Revision of a
currently approved collection.
Respondents/Affected Public: State,
Local, and Tribal Governments; Private
Sector.
Total Estimated Number of Annual
Responses: 4,879.
Total Estimated Number of Annual
Burden Hours: 195,160.
Abstract: This information collection
requests approval for a revision to a
previously approved collection that
includes annual reporting requirements
for the Higher Education Emergency
Relief Fund (HEERF) program and
obtains information on how the funds
were used. Under the current
unprecedented national health
emergency, the legislative and executive
branches of government have come
together to offer relief to those
individuals and industries affected by
the COVID–19 virus under the
Coronavirus Aid, Relief, and Economic
Security (CARES) Act, the Coronavirus
Response and Relief Supplemental
Appropriations Act (CRRSAA), and the
American Rescue Plan (ARP). Targeted
relief to institutions of higher education
(IHEs) has been made available under
the HEERF program. HEERF, originally
established by Section 18004(a) of the
CARES Act, Public Law 116–136 (March
27, 2020) and expanded through
CRRSAA and ARP, authorizes the
Secretary of Education to allocate
formula grant funds to participating
IHEs to address impacts of the COVID–
19 virus.
Dated: October 1, 2021.
Kate Mullan,
PRA Coordinator, Strategic Collections and
Clearance, Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2021–21874 Filed 10–6–21; 8:45 am]
BILLING CODE 4000–01–P
VerDate Sep<11>2014
23:02 Oct 06, 2021
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–134–000.
Applicants: SR Perry, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of SR Perry, LLC.
Filed Date: 9/30/21.
Accession Number: 20210930–5279.
Comment Date: 5 p.m. ET 10/21/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–264–000.
Applicants: PGR 2021 Lessee 1, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of PGR 2021 Lessee 1,
LLC.
Filed Date: 9/30/21.
Accession Number: 20210930–5208.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: EG21–265–000.
Applicants: NET Power, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of NET Power, LLC.
Filed Date: 9/30/21.
Accession Number: 20210930–5254.
Comment Date: 5 p.m. ET 10/21/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2349–002.
Applicants: AR Searcy Project
Company, LLC.
Description: Tariff Amendment: AR
Searcy Supplement to be effective 9/1/
2021.
Filed Date: 9/30/21.
Accession Number: 20210930–5194.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–2350–002.
Applicants: MS Sunflower Project
Company, LLC.
Description: Tariff Amendment: MS
Sunflower Deficiency Response to be
effective 9/1/2021.
Filed Date: 9/30/21.
Accession Number: 20210930–5195.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21–2526–001.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO compliance errata to its 7/27/21
filing re: Order No. 676 NAESB WEQ to
be effective 12/31/9998.
Filed Date: 10/1/21.
Accession Number: 20211001–5149.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
55833
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21–2986–000.
Applicants: Arizona Public Service
Company.
Description: Notice of Cancellation of
Service Agreement No. 234 with
PacifiCorp of Arizona Public Service
Company.
Filed Date: 9/29/21.
Accession Number: 20210929–5184.
Comment Date: 5 p.m. ET 10/20/21.
Docket Numbers: ER21–2987–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
DEP–NCEMPA Revisions to Rate
Schedule No. 200 to be effective 10/1/
2021.
Filed Date: 9/30/21.
Accession Number: 20210930–5183.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21–2988–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: PNM
Modifications to OATT Schedule 2 to be
effective 3/31/2021.
Filed Date: 9/30/21..
Accession Number: 20210930–5188.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21–2991–000.
Applicants: Consumers Energy
Company.
Description: Notice of Cancellation of
Market Based Rate Tariff of Exeter
Entergy Limited Partnership.
Filed Date: 9/30/21.
Accession Number: 20210930–5209.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER22–1–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Schedule 2 Update (Burlington)
to be effective 11/30/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5013.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–10–000.
Applicants: Maverick Wind Project,
LLC.
Description: Tariff Amendment: FERC
Electric Tariff No. 1 to be effective 10/
1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5074.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–11–000.
Applicants: Janis Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5075.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–12–000.
Applicants: Puckett Solar, LLC.
E:\FR\FM\07OCN1.SGM
07OCN1
lotter on DSK11XQN23PROD with NOTICES1
55834
Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5080.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–13–000.
Applicants: Regan Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5083.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–14–000.
Applicants: Darby Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5084.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–15–000.
Applicants: ELP Stillwater Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5085.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–16–000.
Applicants: Pattersonville Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5086.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–17–000.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment: Third
Amendment LGIA Aratina Solar Center
1 SA No. 198 TOT773 to be effective 10/
2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5092.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–18–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2021–10–01 PSCo-OMID–E&P–662–
0.0.0 to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5104.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–19–000.
Applicants: Stanly Solar, LLC.
Description: Baseline eTariff Filing:
Stanly Solar, LLC MBR Tariff to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5110.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–2–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
International Transmission Company.
VerDate Sep<11>2014
17:46 Oct 06, 2021
Jkt 256001
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2021–10–01_ITC
Depreciation Rate Filing to be effective
1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001–5029.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–20–000.
Applicants: PGR 2021 Lessee 1, LLC.
Description: Baseline eTariff Filing:
PGR 2021 Lessee 1, LLC MBR Tariff to
be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5111.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–21–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UMPA TSOA Rev 6 to be effective 11/
1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5115.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–22–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
NITSA—(Idaho Falls Power) Rev 5 to be
effective 10/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5146.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–23–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
Proposed Modifications to PNM’s Open
Access Transmission Tariff to be
effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5153.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–24–000.
Applicants: System Energy Resources,
Inc.
Description: § 205(d) Rate Filing: SERI
UPSA Pension Filing to be effective 12/
1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5162.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–25–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–10–01 EIM Entity Agreement—
Bonneville Power Admin to be effective
12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5166.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–3–000.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2021–10–01_ITCM
Depreciation Rate Filing to be effective
1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001–5031.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–4–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Michigan Electric Transmission
Company, LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2021–10–01_METC
Depreciation Rate Filing to be effective
1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001–5032.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–5–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
CCSF Appendix E Revision to Extend
Unmetered Load Eligibility (SA 275) to
be effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5044.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–6–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA 6203; Queue No. AF2–
398 to be effective 9/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5060.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–7–000.
Applicants: Branscomb Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5065.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–8–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1628R19 Western Farmers Electric
Cooperative NITSA NOA to be effective
9/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5068.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22–9–000.
Applicants: Grissom Solar, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001–5069.
Comment Date: 5 p.m. ET 10/22/21.
The filings are accessible in the
Commission’s eLibrary system (https://
E:\FR\FM\07OCN1.SGM
07OCN1
Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21943 Filed 10–6–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–10–000]
Modernizing Electricity Market Design;
Supplemental Notice of Technical
Conference on Energy and Ancillary
Services in the Evolving Electricity
Sector
As first announced in the Notice of
Technical Conference issued in this
55835
proceeding on July 14, 2021, the Federal
Energy Regulatory Commission
(Commission) will convene a staff-led
technical conference in the abovereferenced proceeding on October 12,
2021, from approximately 9:00 a.m. to
5:00 p.m. Eastern time. The conference
will be held remotely. Attached to this
Supplemental Notice is an agenda for
the technical conference, which
includes the final conference program
and expected speakers. Commissioners
may attend and participate in the
technical conference.
Discussions at the conference may
involve issues raised in proceedings that
are currently pending before the
Commission. These proceedings
include, but are not limited to:
Docket No.
Tenaska Virginia Partners, L.P ................................................................................................................................................
Tenaska Power Services Co ...................................................................................................................................................
Wheelbrator Frackville Energy Company, Inc .........................................................................................................................
Calpine Vineland Solar, LLC ...................................................................................................................................................
Calpine New Jersey Generation, LLC .....................................................................................................................................
Calpine Mid Merit, LLC ............................................................................................................................................................
Calpine Mid-Atlantic Generation, LLC .....................................................................................................................................
Zion Energy LLC ......................................................................................................................................................................
Calpine Bethlehem, LLC ..........................................................................................................................................................
Bayonne Energy Center, LLC .................................................................................................................................................
TAQA Gen X LLC ....................................................................................................................................................................
Wheelbrator Baltimore, L.P .....................................................................................................................................................
Red Oak Power, LLC ..............................................................................................................................................................
Wheelbrator Falls, Inc ..............................................................................................................................................................
LQA, LLC .................................................................................................................................................................................
Calpine Mid Merit II, LLC .........................................................................................................................................................
Tenaska Pennsylvania Partners, LLC .....................................................................................................................................
California Independent System Operator Corporation ............................................................................................................
New York Independent System Operator, Inc ........................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
PJM Interconnection, L.L.C .....................................................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
Southwest Power Pool, Inc .....................................................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
California Independent System Operator Corporation ............................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
Midcontinent Independent System Operator, Inc ....................................................................................................................
American Electric Power Service Corporation v. Midcontinent Independent System Operator, Inc., Southwest Power
Pool, Inc.
PJM Interconnection, L.L.C .....................................................................................................................................................
lotter on DSK11XQN23PROD with NOTICES1
City of Prescott, Arkansas v. Southwestern Electric Power Company, Midcontinent Independent System Operator, Inc ...
PJM Interconnection, L.L.C .....................................................................................................................................................
Basin Electric Power Cooperative and North Iowa Municipal Cooperative Association v. Southwest Power Pool. Inc ........
The conference will be open for the
public to attend remotely. There is no
fee for attendance. Information on this
technical conference, including a link to
the webcast, will be posted on the
conference’s event page on the
Commission’s website (https://
www.ferc.gov/news-events/events/
technical-conference-regarding-energy-
VerDate Sep<11>2014
17:46 Oct 06, 2021
Jkt 256001
and-ancillary-services-markets10122021) prior to the event. The
conference will be transcribed.
Transcripts will be available for a fee
from Ace Reporting (202–347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
ER10–1626–012.
ER10–1632–018.
ER10–3237–011.
ER10–2036–011.
ER10–2040–010.
ER10–2041–010.
ER10–2043–010.
ER10–2044–010.
ER10–2051–010.
ER11–3460–012.
ER11–4393–008.
ER13–1485–011.
ER14–477–002.
ER14–1777–010.
ER16–733–007.
ER18–1321–003.
ER18–1960–003.
ER21–2455–000.
ER21–2460–000.
ER21–2486–000;
ER21–2487–000.
ER21–2582–000.
ER21–2620–000.
ER21–2676–000.
ER21–2677–000.
ER21–2720–000.
ER21–2779–000.
ER21–2788–000.
ER21–2797–000.
ER21–2801–000.
EL17–89–000.
EL19–58, et al.;
ER19–1486, et al.
EL19–60–000.
EL21–78–000, et al.
EL21–90–000.
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
Emma Nicholson at emma.nicholson@
ferc.gov or (202) 502–8741, or Alexander
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 86, Number 192 (Thursday, October 7, 2021)]
[Notices]
[Pages 55833-55835]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21943]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-134-000.
Applicants: SR Perry, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of SR Perry, LLC.
Filed Date: 9/30/21.
Accession Number: 20210930-5279.
Comment Date: 5 p.m. ET 10/21/21.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-264-000.
Applicants: PGR 2021 Lessee 1, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of PGR 2021 Lessee 1, LLC.
Filed Date: 9/30/21.
Accession Number: 20210930-5208.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: EG21-265-000.
Applicants: NET Power, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of NET Power, LLC.
Filed Date: 9/30/21.
Accession Number: 20210930-5254.
Comment Date: 5 p.m. ET 10/21/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER21-2349-002.
Applicants: AR Searcy Project Company, LLC.
Description: Tariff Amendment: AR Searcy Supplement to be effective
9/1/2021.
Filed Date: 9/30/21.
Accession Number: 20210930-5194.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21-2350-002.
Applicants: MS Sunflower Project Company, LLC.
Description: Tariff Amendment: MS Sunflower Deficiency Response to
be effective 9/1/2021.
Filed Date: 9/30/21.
Accession Number: 20210930-5195.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21-2526-001.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: NYISO compliance errata to its 7/
27/21 filing re: Order No. 676 NAESB WEQ to be effective 12/31/9998.
Filed Date: 10/1/21.
Accession Number: 20211001-5149.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER21-2986-000.
Applicants: Arizona Public Service Company.
Description: Notice of Cancellation of Service Agreement No. 234
with PacifiCorp of Arizona Public Service Company.
Filed Date: 9/29/21.
Accession Number: 20210929-5184.
Comment Date: 5 p.m. ET 10/20/21.
Docket Numbers: ER21-2987-000.
Applicants: Duke Energy Progress, LLC.
Description: Sec. 205(d) Rate Filing: DEP-NCEMPA Revisions to Rate
Schedule No. 200 to be effective 10/1/2021.
Filed Date: 9/30/21.
Accession Number: 20210930-5183.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21-2988-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: PNM Modifications to OATT
Schedule 2 to be effective 3/31/2021.
Filed Date: 9/30/21..
Accession Number: 20210930-5188.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER21-2991-000.
Applicants: Consumers Energy Company.
Description: Notice of Cancellation of Market Based Rate Tariff of
Exeter Entergy Limited Partnership.
Filed Date: 9/30/21.
Accession Number: 20210930-5209.
Comment Date: 5 p.m. ET 10/21/21.
Docket Numbers: ER22-1-000.
Applicants: Alliant Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: AECS Schedule 2 Update
(Burlington) to be effective 11/30/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5013.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-10-000.
Applicants: Maverick Wind Project, LLC.
Description: Tariff Amendment: FERC Electric Tariff No. 1 to be
effective 10/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5074.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-11-000.
Applicants: Janis Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5075.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-12-000.
Applicants: Puckett Solar, LLC.
[[Page 55834]]
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5080.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-13-000.
Applicants: Regan Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5083.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-14-000.
Applicants: Darby Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5084.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-15-000.
Applicants: ELP Stillwater Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5085.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-16-000.
Applicants: Pattersonville Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5086.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-17-000.
Applicants: Southern California Edison Company.
Description: Tariff Amendment: Third Amendment LGIA Aratina Solar
Center 1 SA No. 198 TOT773 to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5092.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-18-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2021-10-01 PSCo-OMID-E&P-
662-0.0.0 to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5104.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-19-000.
Applicants: Stanly Solar, LLC.
Description: Baseline eTariff Filing: Stanly Solar, LLC MBR Tariff
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5110.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-2-000.
Applicants: Midcontinent Independent System Operator, Inc.,
International Transmission Company.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_ITC Depreciation Rate Filing to be effective 1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001-5029.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-20-000.
Applicants: PGR 2021 Lessee 1, LLC.
Description: Baseline eTariff Filing: PGR 2021 Lessee 1, LLC MBR
Tariff to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5111.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-21-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: UMPA TSOA Rev 6 to be
effective 11/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5115.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-22-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA NITSA--(Idaho Falls
Power) Rev 5 to be effective 10/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5146.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-23-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: Proposed Modifications to
PNM's Open Access Transmission Tariff to be effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5153.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-24-000.
Applicants: System Energy Resources, Inc.
Description: Sec. 205(d) Rate Filing: SERI UPSA Pension Filing to
be effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5162.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-25-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2021-10-01 EIM Entity
Agreement--Bonneville Power Admin to be effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5166.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-3-000.
Applicants: Midcontinent Independent System Operator, Inc., ITC
Midwest LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_ITCM Depreciation Rate Filing to be effective 1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001-5031.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-4-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Michigan Electric Transmission Company, LLC.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_METC Depreciation Rate Filing to be effective 1/1/2022.
Filed Date: 10/1/21.
Accession Number: 20211001-5032.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-5-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: CCSF Appendix E Revision to
Extend Unmetered Load Eligibility (SA 275) to be effective 12/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5044.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-6-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA 6203; Queue
No. AF2-398 to be effective 9/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5060.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-7-000.
Applicants: Branscomb Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5065.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-8-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1628R19 Western Farmers
Electric Cooperative NITSA NOA to be effective 9/1/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5068.
Comment Date: 5 p.m. ET 10/22/21.
Docket Numbers: ER22-9-000.
Applicants: Grissom Solar, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/2/2021.
Filed Date: 10/1/21.
Accession Number: 20211001-5069.
Comment Date: 5 p.m. ET 10/22/21.
The filings are accessible in the Commission's eLibrary system
(https://
[[Page 55835]]
elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21943 Filed 10-6-21; 8:45 am]
BILLING CODE 6717-01-P