Download as PDF Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices lotter on DSK11XQN23PROD with NOTICES1 public comment addressing the following issues: (1) Is this collection necessary to the proper functions of the Department; (2) will this information be processed and used in a timely manner; (3) is the estimate of burden accurate; (4) how might the Department enhance the quality, utility, and clarity of the information to be collected; and (5) how might the Department minimize the burden of this collection on the respondents, including through the use of information technology. Please note that written comments received in response to this notice will be considered public records. Title of Collection: Higher Education Emergency Relief Fund (HEERF) I, II and III Data Collection Form. OMB Control Number: 1840–0850. Type of Review: Revision of a currently approved collection. Respondents/Affected Public: State, Local, and Tribal Governments; Private Sector. Total Estimated Number of Annual Responses: 4,879. Total Estimated Number of Annual Burden Hours: 195,160. Abstract: This information collection requests approval for a revision to a previously approved collection that includes annual reporting requirements for the Higher Education Emergency Relief Fund (HEERF) program and obtains information on how the funds were used. Under the current unprecedented national health emergency, the legislative and executive branches of government have come together to offer relief to those individuals and industries affected by the COVID–19 virus under the Coronavirus Aid, Relief, and Economic Security (CARES) Act, the Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA), and the American Rescue Plan (ARP). Targeted relief to institutions of higher education (IHEs) has been made available under the HEERF program. HEERF, originally established by Section 18004(a) of the CARES Act, Public Law 116–136 (March 27, 2020) and expanded through CRRSAA and ARP, authorizes the Secretary of Education to allocate formula grant funds to participating IHEs to address impacts of the COVID– 19 virus. Dated: October 1, 2021. Kate Mullan, PRA Coordinator, Strategic Collections and Clearance, Governance and Strategy Division, Office of Chief Data Officer, Office of Planning, Evaluation and Policy Development. [FR Doc. 2021–21874 Filed 10–6–21; 8:45 am] BILLING CODE 4000–01–P VerDate Sep<11>2014 23:02 Oct 06, 2021 Jkt 256001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–134–000. Applicants: SR Perry, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of SR Perry, LLC. Filed Date: 9/30/21. Accession Number: 20210930–5279. Comment Date: 5 p.m. ET 10/21/21. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–264–000. Applicants: PGR 2021 Lessee 1, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of PGR 2021 Lessee 1, LLC. Filed Date: 9/30/21. Accession Number: 20210930–5208. Comment Date: 5 p.m. ET 10/21/21. Docket Numbers: EG21–265–000. Applicants: NET Power, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of NET Power, LLC. Filed Date: 9/30/21. Accession Number: 20210930–5254. Comment Date: 5 p.m. ET 10/21/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–2349–002. Applicants: AR Searcy Project Company, LLC. Description: Tariff Amendment: AR Searcy Supplement to be effective 9/1/ 2021. Filed Date: 9/30/21. Accession Number: 20210930–5194. Comment Date: 5 p.m. ET 10/7/21. Docket Numbers: ER21–2350–002. Applicants: MS Sunflower Project Company, LLC. Description: Tariff Amendment: MS Sunflower Deficiency Response to be effective 9/1/2021. Filed Date: 9/30/21. Accession Number: 20210930–5195. Comment Date: 5 p.m. ET 10/21/21. Docket Numbers: ER21–2526–001. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: NYISO compliance errata to its 7/27/21 filing re: Order No. 676 NAESB WEQ to be effective 12/31/9998. Filed Date: 10/1/21. Accession Number: 20211001–5149. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 55833 Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER21–2986–000. Applicants: Arizona Public Service Company. Description: Notice of Cancellation of Service Agreement No. 234 with PacifiCorp of Arizona Public Service Company. Filed Date: 9/29/21. Accession Number: 20210929–5184. Comment Date: 5 p.m. ET 10/20/21. Docket Numbers: ER21–2987–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEP–NCEMPA Revisions to Rate Schedule No. 200 to be effective 10/1/ 2021. Filed Date: 9/30/21. Accession Number: 20210930–5183. Comment Date: 5 p.m. ET 10/21/21. Docket Numbers: ER21–2988–000. Applicants: Public Service Company of New Mexico. Description: § 205(d) Rate Filing: PNM Modifications to OATT Schedule 2 to be effective 3/31/2021. Filed Date: 9/30/21.. Accession Number: 20210930–5188. Comment Date: 5 p.m. ET 10/21/21. Docket Numbers: ER21–2991–000. Applicants: Consumers Energy Company. Description: Notice of Cancellation of Market Based Rate Tariff of Exeter Entergy Limited Partnership. Filed Date: 9/30/21. Accession Number: 20210930–5209. Comment Date: 5 p.m. ET 10/21/21. Docket Numbers: ER22–1–000. Applicants: Alliant Energy Corporate Services, Inc. Description: § 205(d) Rate Filing: AECS Schedule 2 Update (Burlington) to be effective 11/30/2021. Filed Date: 10/1/21. Accession Number: 20211001–5013. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–10–000. Applicants: Maverick Wind Project, LLC. Description: Tariff Amendment: FERC Electric Tariff No. 1 to be effective 10/ 1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5074. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–11–000. Applicants: Janis Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5075. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–12–000. Applicants: Puckett Solar, LLC. E:\FR\FM\07OCN1.SGM 07OCN1 lotter on DSK11XQN23PROD with NOTICES1 55834 Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5080. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–13–000. Applicants: Regan Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5083. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–14–000. Applicants: Darby Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5084. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–15–000. Applicants: ELP Stillwater Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5085. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–16–000. Applicants: Pattersonville Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5086. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–17–000. Applicants: Southern California Edison Company. Description: Tariff Amendment: Third Amendment LGIA Aratina Solar Center 1 SA No. 198 TOT773 to be effective 10/ 2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5092. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–18–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2021–10–01 PSCo-OMID–E&P–662– 0.0.0 to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5104. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–19–000. Applicants: Stanly Solar, LLC. Description: Baseline eTariff Filing: Stanly Solar, LLC MBR Tariff to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5110. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–2–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company. VerDate Sep<11>2014 17:46 Oct 06, 2021 Jkt 256001 Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021–10–01_ITC Depreciation Rate Filing to be effective 1/1/2022. Filed Date: 10/1/21. Accession Number: 20211001–5029. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–20–000. Applicants: PGR 2021 Lessee 1, LLC. Description: Baseline eTariff Filing: PGR 2021 Lessee 1, LLC MBR Tariff to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5111. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–21–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: UMPA TSOA Rev 6 to be effective 11/ 1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5115. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–22–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: BPA NITSA—(Idaho Falls Power) Rev 5 to be effective 10/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5146. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–23–000. Applicants: Public Service Company of New Mexico. Description: § 205(d) Rate Filing: Proposed Modifications to PNM’s Open Access Transmission Tariff to be effective 12/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5153. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–24–000. Applicants: System Energy Resources, Inc. Description: § 205(d) Rate Filing: SERI UPSA Pension Filing to be effective 12/ 1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5162. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–25–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2021–10–01 EIM Entity Agreement— Bonneville Power Admin to be effective 12/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5166. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–3–000. Applicants: Midcontinent Independent System Operator, Inc., ITC Midwest LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021–10–01_ITCM Depreciation Rate Filing to be effective 1/1/2022. Filed Date: 10/1/21. Accession Number: 20211001–5031. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–4–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company, LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021–10–01_METC Depreciation Rate Filing to be effective 1/1/2022. Filed Date: 10/1/21. Accession Number: 20211001–5032. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–5–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: CCSF Appendix E Revision to Extend Unmetered Load Eligibility (SA 275) to be effective 12/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5044. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–6–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA 6203; Queue No. AF2– 398 to be effective 9/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5060. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–7–000. Applicants: Branscomb Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5065. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–8–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1628R19 Western Farmers Electric Cooperative NITSA NOA to be effective 9/1/2021. Filed Date: 10/1/21. Accession Number: 20211001–5068. Comment Date: 5 p.m. ET 10/22/21. Docket Numbers: ER22–9–000. Applicants: Grissom Solar, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/2/2021. Filed Date: 10/1/21. Accession Number: 20211001–5069. Comment Date: 5 p.m. ET 10/22/21. The filings are accessible in the Commission’s eLibrary system (https:// E:\FR\FM\07OCN1.SGM 07OCN1 Federal Register / Vol. 86, No. 192 / Thursday, October 7, 2021 / Notices elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 1, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–21943 Filed 10–6–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–10–000] Modernizing Electricity Market Design; Supplemental Notice of Technical Conference on Energy and Ancillary Services in the Evolving Electricity Sector As first announced in the Notice of Technical Conference issued in this 55835 proceeding on July 14, 2021, the Federal Energy Regulatory Commission (Commission) will convene a staff-led technical conference in the abovereferenced proceeding on October 12, 2021, from approximately 9:00 a.m. to 5:00 p.m. Eastern time. The conference will be held remotely. Attached to this Supplemental Notice is an agenda for the technical conference, which includes the final conference program and expected speakers. Commissioners may attend and participate in the technical conference. Discussions at the conference may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: Docket No. Tenaska Virginia Partners, L.P ................................................................................................................................................ Tenaska Power Services Co ................................................................................................................................................... Wheelbrator Frackville Energy Company, Inc ......................................................................................................................... Calpine Vineland Solar, LLC ................................................................................................................................................... Calpine New Jersey Generation, LLC ..................................................................................................................................... Calpine Mid Merit, LLC ............................................................................................................................................................ Calpine Mid-Atlantic Generation, LLC ..................................................................................................................................... Zion Energy LLC ...................................................................................................................................................................... Calpine Bethlehem, LLC .......................................................................................................................................................... Bayonne Energy Center, LLC ................................................................................................................................................. TAQA Gen X LLC .................................................................................................................................................................... Wheelbrator Baltimore, L.P ..................................................................................................................................................... Red Oak Power, LLC .............................................................................................................................................................. Wheelbrator Falls, Inc .............................................................................................................................................................. LQA, LLC ................................................................................................................................................................................. Calpine Mid Merit II, LLC ......................................................................................................................................................... Tenaska Pennsylvania Partners, LLC ..................................................................................................................................... California Independent System Operator Corporation ............................................................................................................ New York Independent System Operator, Inc ........................................................................................................................ Midcontinent Independent System Operator, Inc .................................................................................................................... PJM Interconnection, L.L.C ..................................................................................................................................................... Midcontinent Independent System Operator, Inc .................................................................................................................... Southwest Power Pool, Inc ..................................................................................................................................................... Midcontinent Independent System Operator, Inc .................................................................................................................... Midcontinent Independent System Operator, Inc .................................................................................................................... California Independent System Operator Corporation ............................................................................................................ Midcontinent Independent System Operator, Inc .................................................................................................................... Midcontinent Independent System Operator, Inc .................................................................................................................... Midcontinent Independent System Operator, Inc .................................................................................................................... American Electric Power Service Corporation v. Midcontinent Independent System Operator, Inc., Southwest Power Pool, Inc. PJM Interconnection, L.L.C ..................................................................................................................................................... lotter on DSK11XQN23PROD with NOTICES1 City of Prescott, Arkansas v. Southwestern Electric Power Company, Midcontinent Independent System Operator, Inc ... PJM Interconnection, L.L.C ..................................................................................................................................................... Basin Electric Power Cooperative and North Iowa Municipal Cooperative Association v. Southwest Power Pool. Inc ........ The conference will be open for the public to attend remotely. There is no fee for attendance. Information on this technical conference, including a link to the webcast, will be posted on the conference’s event page on the Commission’s website (https:// www.ferc.gov/news-events/events/ technical-conference-regarding-energy- VerDate Sep<11>2014 17:46 Oct 06, 2021 Jkt 256001 and-ancillary-services-markets10122021) prior to the event. The conference will be transcribed. Transcripts will be available for a fee from Ace Reporting (202–347–3700). Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 ER10–1626–012. ER10–1632–018. ER10–3237–011. ER10–2036–011. ER10–2040–010. ER10–2041–010. ER10–2043–010. ER10–2044–010. ER10–2051–010. ER11–3460–012. ER11–4393–008. ER13–1485–011. ER14–477–002. ER14–1777–010. ER16–733–007. ER18–1321–003. ER18–1960–003. ER21–2455–000. ER21–2460–000. ER21–2486–000; ER21–2487–000. ER21–2582–000. ER21–2620–000. ER21–2676–000. ER21–2677–000. ER21–2720–000. ER21–2779–000. ER21–2788–000. ER21–2797–000. ER21–2801–000. EL17–89–000. EL19–58, et al.; ER19–1486, et al. EL19–60–000. EL21–78–000, et al. EL21–90–000. send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. For more information about this technical conference, please contact Emma Nicholson at emma.nicholson@ ferc.gov or (202) 502–8741, or Alexander E:\FR\FM\07OCN1.SGM 07OCN1

Agencies

[Federal Register Volume 86, Number 192 (Thursday, October 7, 2021)]
[Notices]
[Pages 55833-55835]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21943]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC21-134-000.
    Applicants: SR Perry, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of SR Perry, LLC.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5279.
    Comment Date: 5 p.m. ET 10/21/21.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG21-264-000.
    Applicants: PGR 2021 Lessee 1, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of PGR 2021 Lessee 1, LLC.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5208.
    Comment Date: 5 p.m. ET 10/21/21.

    Docket Numbers: EG21-265-000.
    Applicants: NET Power, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of NET Power, LLC.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5254.
    Comment Date: 5 p.m. ET 10/21/21.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER21-2349-002.
    Applicants: AR Searcy Project Company, LLC.
    Description: Tariff Amendment: AR Searcy Supplement to be effective 
9/1/2021.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5194.
    Comment Date: 5 p.m. ET 10/7/21.

    Docket Numbers: ER21-2350-002.
    Applicants: MS Sunflower Project Company, LLC.
    Description: Tariff Amendment: MS Sunflower Deficiency Response to 
be effective 9/1/2021.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5195.
    Comment Date: 5 p.m. ET 10/21/21.

    Docket Numbers: ER21-2526-001.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: NYISO compliance errata to its 7/
27/21 filing re: Order No. 676 NAESB WEQ to be effective 12/31/9998.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5149.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER21-2986-000.
    Applicants: Arizona Public Service Company.
    Description: Notice of Cancellation of Service Agreement No. 234 
with PacifiCorp of Arizona Public Service Company.
    Filed Date: 9/29/21.
    Accession Number: 20210929-5184.
    Comment Date: 5 p.m. ET 10/20/21.

    Docket Numbers: ER21-2987-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Sec.  205(d) Rate Filing: DEP-NCEMPA Revisions to Rate 
Schedule No. 200 to be effective 10/1/2021.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5183.
    Comment Date: 5 p.m. ET 10/21/21.

    Docket Numbers: ER21-2988-000.
    Applicants: Public Service Company of New Mexico.
    Description: Sec.  205(d) Rate Filing: PNM Modifications to OATT 
Schedule 2 to be effective 3/31/2021.
    Filed Date: 9/30/21..
    Accession Number: 20210930-5188.
    Comment Date: 5 p.m. ET 10/21/21.

    Docket Numbers: ER21-2991-000.
    Applicants: Consumers Energy Company.
    Description: Notice of Cancellation of Market Based Rate Tariff of 
Exeter Entergy Limited Partnership.
    Filed Date: 9/30/21.
    Accession Number: 20210930-5209.
    Comment Date: 5 p.m. ET 10/21/21.

    Docket Numbers: ER22-1-000.
    Applicants: Alliant Energy Corporate Services, Inc.
    Description: Sec.  205(d) Rate Filing: AECS Schedule 2 Update 
(Burlington) to be effective 11/30/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5013.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-10-000.
    Applicants: Maverick Wind Project, LLC.
    Description: Tariff Amendment: FERC Electric Tariff No. 1 to be 
effective 10/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5074.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-11-000.
    Applicants: Janis Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5075.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-12-000.
    Applicants: Puckett Solar, LLC.

[[Page 55834]]

    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5080.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-13-000.
    Applicants: Regan Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5083.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-14-000.
    Applicants: Darby Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5084.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-15-000.
    Applicants: ELP Stillwater Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5085.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-16-000.
    Applicants: Pattersonville Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5086.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-17-000.
    Applicants: Southern California Edison Company.
    Description: Tariff Amendment: Third Amendment LGIA Aratina Solar 
Center 1 SA No. 198 TOT773 to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5092.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-18-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: 2021-10-01 PSCo-OMID-E&P-
662-0.0.0 to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5104.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-19-000.
    Applicants: Stanly Solar, LLC.
    Description: Baseline eTariff Filing: Stanly Solar, LLC MBR Tariff 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5110.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-2-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
International Transmission Company.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_ITC Depreciation Rate Filing to be effective 1/1/2022.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5029.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-20-000.
    Applicants: PGR 2021 Lessee 1, LLC.
    Description: Baseline eTariff Filing: PGR 2021 Lessee 1, LLC MBR 
Tariff to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5111.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-21-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: UMPA TSOA Rev 6 to be 
effective 11/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5115.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-22-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: BPA NITSA--(Idaho Falls 
Power) Rev 5 to be effective 10/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5146.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-23-000.
    Applicants: Public Service Company of New Mexico.
    Description: Sec.  205(d) Rate Filing: Proposed Modifications to 
PNM's Open Access Transmission Tariff to be effective 12/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5153.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-24-000.
    Applicants: System Energy Resources, Inc.
    Description: Sec.  205(d) Rate Filing: SERI UPSA Pension Filing to 
be effective 12/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5162.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-25-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2021-10-01 EIM Entity 
Agreement--Bonneville Power Admin to be effective 12/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5166.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-3-000.
    Applicants: Midcontinent Independent System Operator, Inc., ITC 
Midwest LLC.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_ITCM Depreciation Rate Filing to be effective 1/1/2022.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5031.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-4-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Michigan Electric Transmission Company, LLC.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2021-
10-01_METC Depreciation Rate Filing to be effective 1/1/2022.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5032.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-5-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: CCSF Appendix E Revision to 
Extend Unmetered Load Eligibility (SA 275) to be effective 12/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5044.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-6-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA 6203; Queue 
No. AF2-398 to be effective 9/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5060.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-7-000.
    Applicants: Branscomb Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5065.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-8-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1628R19 Western Farmers 
Electric Cooperative NITSA NOA to be effective 9/1/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5068.
    Comment Date: 5 p.m. ET 10/22/21.

    Docket Numbers: ER22-9-000.
    Applicants: Grissom Solar, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/2/2021.
    Filed Date: 10/1/21.
    Accession Number: 20211001-5069.
    Comment Date: 5 p.m. ET 10/22/21.

    The filings are accessible in the Commission's eLibrary system 
(https://

[[Page 55835]]

elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying the 
docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 1, 2021.
Kimberly D. Bose,
Secretary.