Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 55016-55021 [2021-20848]
Download as PDF
55016
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
LICENSE AMENDMENT ISSUANCE(S)—Continued
Amendment Date ................................................
ADAMS Accession No ........................................
Amendment No(s) ...............................................
Brief Description of Amendment(s) ....................
Public Comments Received as to Proposed
NSHC (Yes/No).
August 30, 2021.
ML21214A139.
318, 341, and 301.
The amendments modified Technical Specification 3.8.6, ‘‘Battery Cell Parameters,’’ to clarify
the operability requirements for the Unit, Shutdown Board, and Diesel Generator batteries.
No.
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS
Docket No(s) .......................................................
Amendment Date ................................................
ADAMS Accession No ........................................
Amendment No(s) ...............................................
Brief Description of Amendment(s) ....................
Public Comments Received as to Proposed
NSHC (Yes/No).
Dated: September 27, 2021.
For the Nuclear Regulatory Commission.
Michael I. Dudek,
Acting Deputy Director, Division of Operating
Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2021–21334 Filed 10–4–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0176]
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information
Nuclear Regulatory
Commission.
ACTION: License amendment request;
notice of opportunity to comment,
request a hearing, and petition for leave
to intervene; order imposing
procedures.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
considering approval of two amendment
requests. The amendment requests are
for Donald C. Cook Nuclear Plant, Unit
2, and Monticello Nuclear Generating
Plant. For each amendment request, the
NRC proposes to determine that they
involve no significant hazards
consideration (NSHC). Because each
amendment request contains sensitive
unclassified non-safeguards information
(SUNSI), an order imposes procedures
to obtain access to SUNSI for contention
preparation by persons who file a
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
50–482.
September 3, 2021.
ML21210A247.
230.
The amendment revised Technical Specification 3.6.3, ‘‘Containment Isolation Valves,’’ Condition D, to allow the use of a blind flange for Required Action D.1. In addition, the amendment changed Surveillance Requirement 3.6.3.1 to allow the use of a blind flange.
No.
hearing request or petition for leave to
intervene.
DATES: Comments must be filed by
November 4, 2021. A request for a
hearing or petitions for leave to
intervene must be filed by December 6,
2021. Any potential party as defined in
section 2.4 of title 10 of the Code of
Federal Regulations (10 CFR) who
believes access to SUNSI is necessary to
respond to this notice must request
document access by October 15, 2021.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal Rulemaking website:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0176. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Karen Zeleznock, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
1118, email: Karen.Zeleznock@nrc.gov.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2021–
0176, facility name, unit number(s),
docket number(s), application date, and
subject when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0176.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call
1–800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. Eastern
Time (ET), Monday through Friday,
except Federal holidays.
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal Rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2021–0176, facility
E:\FR\FM\05OCN1.SGM
05OCN1
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
name, unit number(s), docket
number(s), application date, and
subject, in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
lotter on DSK11XQN23PROD with NOTICES1
II. Background
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the NRC is publishing this
notice. The Act requires the
Commission to publish notice of any
amendments issued or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license or combined
license, as applicable, upon a
determination by the Commission that
such amendment involves NSHC,
notwithstanding the pendency before
the Commission of a request for a
hearing from any person.
This notice includes notices of
amendments containing SUNSI.
III. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
NSHC. Under the Commission’s
regulations in 10 CFR 50.92, this means
that operation of the facility in
accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated, or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated, or
(3) involve a significant reduction in a
margin of safety. The basis for this
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
proposed determination for each
amendment request is shown in this
document.
The Commission is seeking public
comments on these proposed
determinations. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determinations.
Normally, the Commission will not
issue the amendments until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue any of these
license amendments before expiration of
the 60-day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue any of these
amendments prior to the expiration of
the 30-day comment period if
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. If the Commission takes action
on any of these amendments prior to the
expiration of either the comment period
or the notice period, it will publish a
notice of issuance in the Federal
Register. If the Commission makes a
final no significant hazards
consideration determination for any of
these amendments, any hearing will
take place after issuance. The
Commission expects that the need to
take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any person
(petitioner) whose interest may be
affected by any of these actions may file
a request for a hearing and petition for
leave to intervene (petition) with respect
to that action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. If a petition is filed, the
Commission or a presiding officer will
rule on the petition and, if appropriate,
a notice of a hearing will be issued.
As required by 10 CFR 2.309(d), the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
55017
the nature of the petitioner’s right to be
made a party to the proceeding; (3) the
nature and extent of the petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions that the petitioner
seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion that support the contention and
on which the petitioner intends to rely
in proving the contention at the hearing.
The petitioner must also provide
references to the specific sources and
documents on which the petitioner
intends to rely to support its position on
the issue. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one that, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of NSHC, the
Commission will make a final
determination on the issue of NSHC.
The final determination will serve to
E:\FR\FM\05OCN1.SGM
05OCN1
lotter on DSK11XQN23PROD with NOTICES1
55018
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
establish when the hearing is held. If the
final determination is that the
amendment request involves NSHC, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or Federally
recognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federally
recognized Indian Tribe, or agency
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a petition is submitted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings including
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
documents filed by an interested State,
local governmental body, Federally
recognized Indian Tribe, or designated
agency thereof that requests to
participate under 10 CFR 2.315(c), must
be filed in accordance with 10 CFR
2.302. The E-Filing process requires
participants to submit and serve all
adjudicatory documents over the
internet, or in some cases, to mail copies
on electronic storage media, unless an
exemption permitting an alternative
filing method, as discussed below, is
granted. Detailed guidance on electronic
submissions is located in the Guidance
for Electronic Submissions to the NRC
(ADAMS Accession No. ML13031A056)
and on the NRC website at https://
www.nrc.gov/site-help/esubmittals.html.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. After a digital ID
certificate is obtained and a docket
created, the participant must submit
adjudicatory documents in Portable
Document Format. Guidance on
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. (ET) on the due date. Upon receipt
of a transmission, the E-Filing system
timestamps the document and sends the
submitter an email confirming receipt of
the document. The E-Filing system also
distributes an email that provides access
to the document to the NRC’s Office of
the General Counsel and any others who
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed to obtain access to
the documents via the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., (ET),
Monday through Friday, excluding
government holidays.
Participants who believe that they
have good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted in accordance with
10 CFR 2.302(b)–(d). Participants filing
adjudicatory documents in this manner
are responsible for serving their
documents on all other participants.
Participants granted an exemption
under 10 CFR 2.302(g)(2) must still meet
the electronic formatting requirement in
10 CFR 2.302(g)(1), unless the
participant also seeks and is granted an
exemption from 10 CFR 2.302(g)(1).
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket, which is
publicly available at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the presiding
officer. If you do not have an NRCissued digital ID certificate as described
above, click ‘‘cancel’’ when the link
requests certificates and you will be
automatically directed to the NRC’s
electronic hearing dockets where you
will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information such as social
security numbers, home addresses, or
personal phone numbers in their filings
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
E:\FR\FM\05OCN1.SGM
05OCN1
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
adjudicatory filings and would
constitute a Fair Use application,
participants should not include
55019
copyrighted materials in their
submission.
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 2; Berrien County, MI
Docket No(s) .......................................................
Application Date ..................................................
ADAMS Accession No ........................................
Location in Application of NSHC ........................
Brief Description of Amendment(s) ....................
Proposed Determination .....................................
Name of Attorney for Licensee, Mailing Address
NRC Project Manager, Telephone Number .......
50–316.
June 15, 2021.
ML21210A278.
Pages 23–25 of Enclosure 2.
The requested amendment would revise the reactor coolant system heatup and cooldown
curves and low temperature overpressure protection (LTOP) requirements in Technical
Specification (TS) 3.4.3 and 3.4.12, respectively. The proposed changes to the LTOP requirements in TS 3.4.12 will also require changes to be made to TS 3.4.6, 3.4.7, and 3.4.10.
NSHC.
Robert B. Haemer, Senior Nuclear Counsel, Indiana Michigan Power Company, One Cook
Place, Bridgman, MI 49106.
Scott Wall, 301–415–2855.
Northern States Power Company; Monticello Nuclear Generating Plant; Wright County, MN
Docket No(s) .......................................................
Application Date ..................................................
ADAMS Accession No ........................................
Location in Application of NSHC ........................
Brief Description of Amendment(s) ....................
Proposed Determination .....................................
Name of Attorney for Licensee, Mailing Address
NRC Project Manager, Telephone Number .......
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
lotter on DSK11XQN23PROD with NOTICES1
Indiana Michigan Power Company;
Donald C. Cook Nuclear Plant, Unit 2;
Berrien County, MI
Northern States Power Company;
Monticello Nuclear Generating Plant;
Wright County, MN
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing SUNSI.
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request access to SUNSI. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
50–263.
July 29, 2021.
ML21211A594 (Package).
Pages 15–17 of Enclosure.
The amendment would revise the Technical Specification 5.6.3 ‘‘Core Operating Limits Report
(COLR),’’ to allow the application of advanced Framatome, Inc., methodologies for determining core operating limits in support of loading Framatome, Inc. ATRIUM 11 fuel type into
the Monticello Nuclear Generating Plant core and to incorporate a new long-term reactor
stability solution.
NSHC.
Peter M. Glass, Assistant General Counsel, Xcel Energy, 414 Nicollet Mall—401–8, Minneapolis, MN 55401.
Robert Kuntz, 301–415–3733
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Deputy
General Counsel for Hearings and
Administration, Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001. The expedited delivery or courier
mail address for both offices is: U.S.
Nuclear Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland
20852. The email address for the Office
of the Secretary and the Office of the
General Counsel are Hearing.Docket@
nrc.gov and
RidsOgcMailCenter.Resource@nrc.gov,
respectively.1 The request must include
the following information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
E:\FR\FM\05OCN1.SGM
05OCN1
55020
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after receipt of (or
access to) that information. However, if
more than 25 days remain between the
petitioner’s receipt of (or access to) the
information and the deadline for filing
all other contentions (as established in
the notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and requisite
need, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
(3) Further appeals of decisions under
this paragraph must be made pursuant
to 10 CFR 2.311.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed within 5 days of
the notification by the NRC staff of its
grant of access and must be filed with:
(a) The presiding officer designated in
this proceeding; (b) if no presiding
officer has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
The attachment to this Order
summarizes the general target schedule
for processing and resolving requests
under these procedures.
It is so ordered.
Dated: September 21, 2021.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 ........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
Supporting the standing of a potential party identified by name and address; describing the need for the information in order
for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requestor to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
10 ......................
60 ......................
20 ......................
25 ......................
30 ......................
40 ......................
A .......................
lotter on DSK11XQN23PROD with NOTICES1
A + 3 .................
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007, as amended at 77 FR
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
46562; August 3, 2012) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\05OCN1.SGM
05OCN1
Federal Register / Vol. 86, No. 190 / Tuesday, October 5, 2021 / Notices
55021
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
Event/activity
A + 28 ...............
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of opportunity to request a hearing and petition for leave to intervene), the petitioner may file its
SUNSI contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
A + 53 ...............
A + 60 ...............
>A + 60 .............
[FR Doc. 2021–20848 Filed 10–4–21; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2021–136 and CP2021–143]
New Postal Product
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
a negotiated service agreement. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: October 7,
2021.
SUMMARY:
Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
lotter on DSK11XQN23PROD with NOTICES1
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
request(s) may propose the addition or
removal of a negotiated service
agreement from the market dominant or
the competitive product list, or the
modification of an existing product
currently appearing on the market
dominant or the competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
VerDate Sep<11>2014
18:56 Oct 04, 2021
Jkt 256001
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
the interests of the general public in the
proceeding, pursuant to 39 U.S.C. 505
(Public Representative). Section II also
establishes comment deadline(s)
pertaining to each request.
The public portions of the Postal
Service’s request(s) can be accessed via
the Commission’s website (https://
www.prc.gov). Non-public portions of
the Postal Service’s request(s), if any,
can be accessed through compliance
with the requirements of 39 CFR
3011.301.1
The Commission invites comments on
whether the Postal Service’s request(s)
in the captioned docket(s) are consistent
with the policies of title 39. For
request(s) that the Postal Service states
concern market dominant product(s),
applicable statutory and regulatory
requirements include 39 U.S.C. 3622, 39
U.S.C. 3642, 39 CFR part 3030, and 39
CFR part 3040, subpart B. For request(s)
that the Postal Service states concern
competitive product(s), applicable
statutory and regulatory requirements
include 39 U.S.C. 3632, 39 U.S.C. 3633,
39 U.S.C. 3642, 39 CFR part 3035, and
39 CFR part 3040, subpart B. Comment
deadline(s) for each request appear in
section II.
II. Docketed Proceeding(s)
1. Docket No(s).: MC2021–136 and
CP2021–143; Filing Title: USPS Request
to Add Priority Mail & First-Class
Package Service Contract 203 to
Competitive Product List and Notice of
Filing Materials Under Seal; Filing
Acceptance Date: September 29, 2021;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3040.130 through 3040.135, and 39 CFR
3035.105; Public Representative:
Matthew Ashford; Comments Due:
October 7, 2021.
1 See Docket No. RM2018–3, Order Adopting
Final Rules Relating to Non-Public Information,
June 27, 2018, Attachment A at 19–22 (Order No.
4679).
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
This Notice will be published in the
Federal Register.
Erica A. Barker,
Secretary.
[FR Doc. 2021–21642 Filed 10–4–21; 8:45 am]
BILLING CODE 7710–FW–P
RAILROAD RETIREMENT BOARD
Privacy Act of 1974; System of
Records; (Railroad Retirement Board—
Office of Personnel Management)
AGENCY:
Railroad Retirement Board
(RRB).
Renewal of computer-matching
program.
ACTION:
As required by the Privacy
Act of 1974, as amended, the RRB is
issuing public notice of its renewal of an
ongoing computer-matching program
with the Office of Personnel
Management (OPM) that expired on
March 1, 2019. The purpose of this
notice is to advise individuals applying
for or receiving benefits under the
Railroad Retirement Act of the use made
by RRB of this information obtained
from OPM by means of a computer
match. We will file a report of this
computer-matching program with the
Committee on Homeland Security and
Governmental Affairs of the Senate; the
Committee on Oversight and
Government Reform of the House of
Representatives; and the Office of
Information and Regulatory Affairs,
Office of Management and Budget
(OMB).
SUMMARY:
This matching program will take
effect November 4, 2021. The matching
program will continue for 18 months
after the effective date and may be
extended for an additional 12 months, if
the conditions specified in 5 U.S.C.
552a(o)(2)(D) have been met, with an
expiration date of April 1, 2024.
ADDRESSES: Interested parties may
comment on this publication by writing
to Ms. Stephanie Hillyard, Secretary to
the Board, Railroad Retirement Board,
DATES:
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 86, Number 190 (Tuesday, October 5, 2021)]
[Notices]
[Pages 55016-55021]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20848]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0176]
Applications and Amendments to Facility Operating Licenses and
Combined Licenses Involving Proposed No Significant Hazards
Considerations and Containing Sensitive Unclassified Non-Safeguards
Information and Order Imposing Procedures for Access to Sensitive
Unclassified Non-Safeguards Information
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; notice of opportunity to comment,
request a hearing, and petition for leave to intervene; order imposing
procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
considering approval of two amendment requests. The amendment requests
are for Donald C. Cook Nuclear Plant, Unit 2, and Monticello Nuclear
Generating Plant. For each amendment request, the NRC proposes to
determine that they involve no significant hazards consideration
(NSHC). Because each amendment request contains sensitive unclassified
non-safeguards information (SUNSI), an order imposes procedures to
obtain access to SUNSI for contention preparation by persons who file a
hearing request or petition for leave to intervene.
DATES: Comments must be filed by November 4, 2021. A request for a
hearing or petitions for leave to intervene must be filed by December
6, 2021. Any potential party as defined in section 2.4 of title 10 of
the Code of Federal Regulations (10 CFR) who believes access to SUNSI
is necessary to respond to this notice must request document access by
October 15, 2021.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal Rulemaking website:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0176. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Karen Zeleznock, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, telephone: 301-415-1118, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0176, facility name, unit
number(s), docket number(s), application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly available information related to this
action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0176.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. Eastern Time (ET), Monday
through Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal Rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2021-0176, facility
[[Page 55017]]
name, unit number(s), docket number(s), application date, and subject,
in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the NRC is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves NSHC, notwithstanding the pendency before the
Commission of a request for a hearing from any person.
This notice includes notices of amendments containing SUNSI.
III. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve NSHC. Under the Commission's regulations in
10 CFR 50.92, this means that operation of the facility in accordance
with the proposed amendment would not (1) involve a significant
increase in the probability or consequences of an accident previously
evaluated, or (2) create the possibility of a new or different kind of
accident from any accident previously evaluated, or (3) involve a
significant reduction in a margin of safety. The basis for this
proposed determination for each amendment request is shown in this
document.
The Commission is seeking public comments on these proposed
determinations. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determinations.
Normally, the Commission will not issue the amendments until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue any of these license amendments before expiration
of the 60-day period provided that its final determination is that the
amendment involves no significant hazards consideration. In addition,
the Commission may issue any of these amendments prior to the
expiration of the 30-day comment period if circumstances change during
the 30-day comment period such that failure to act in a timely way
would result, for example, in derating or shutdown of the facility. If
the Commission takes action on any of these amendments prior to the
expiration of either the comment period or the notice period, it will
publish a notice of issuance in the Federal Register. If the Commission
makes a final no significant hazards consideration determination for
any of these amendments, any hearing will take place after issuance.
The Commission expects that the need to take this action will occur
very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
person (petitioner) whose interest may be affected by any of these
actions may file a request for a hearing and petition for leave to
intervene (petition) with respect to that action. Petitions shall be
filed in accordance with the Commission's ``Agency Rules of Practice
and Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed,
the Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d), the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right to be made a party
to the proceeding; (3) the nature and extent of the petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions that the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion that support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one that, if
proven, would entitle the petitioner to relief. A petitioner who fails
to satisfy the requirements at 10 CFR 2.309(f) with respect to at least
one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of NSHC, the Commission will make a final
determination on the issue of NSHC. The final determination will serve
to
[[Page 55018]]
establish when the hearing is held. If the final determination is that
the amendment request involves NSHC, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing would take place after issuance of
the amendment. If the final determination is that the amendment request
involves a significant hazards consideration, then any hearing held
would take place before the issuance of the amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
A State, local governmental body, Federally recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a petition is submitted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings including
documents filed by an interested State, local governmental body,
Federally recognized Indian Tribe, or designated agency thereof that
requests to participate under 10 CFR 2.315(c), must be filed in
accordance with 10 CFR 2.302. The E-Filing process requires
participants to submit and serve all adjudicatory documents over the
internet, or in some cases, to mail copies on electronic storage media,
unless an exemption permitting an alternative filing method, as
discussed below, is granted. Detailed guidance on electronic
submissions is located in the Guidance for Electronic Submissions to
the NRC (ADAMS Accession No. ML13031A056) and on the NRC website at
https://www.nrc.gov/site-help/e-submittals.html.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is
obtained and a docket created, the participant must submit adjudicatory
documents in Portable Document Format. Guidance on submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. (ET) on the due date. Upon receipt of a
transmission, the E-Filing system timestamps the document and sends the
submitter an email confirming receipt of the document. The E-Filing
system also distributes an email that provides access to the document
to the NRC's Office of the General Counsel and any others who have
advised the Office of the Secretary that they wish to participate in
the proceeding, so that the filer need not serve the document on those
participants separately. Therefore, applicants and other participants
(or their counsel or representative) must apply for and receive a
digital ID certificate before adjudicatory documents are filed to
obtain access to the documents via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., (ET), Monday through Friday, excluding government holidays.
Participants who believe that they have good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted in accordance with 10 CFR
2.302(b)-(d). Participants filing adjudicatory documents in this manner
are responsible for serving their documents on all other participants.
Participants granted an exemption under 10 CFR 2.302(g)(2) must still
meet the electronic formatting requirement in 10 CFR 2.302(g)(1),
unless the participant also seeks and is granted an exemption from 10
CFR 2.302(g)(1).
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
presiding officer. If you do not have an NRC-issued digital ID
certificate as described above, click ``cancel'' when the link requests
certificates and you will be automatically directed to the NRC's
electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information
such as social security numbers, home addresses, or personal phone
numbers in their filings unless an NRC regulation or other law requires
submission of such information. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the
[[Page 55019]]
adjudicatory filings and would constitute a Fair Use application,
participants should not include copyrighted materials in their
submission.
------------------------------------------------------------------------
------------------------------------------------------------------------
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 2;
Berrien County, MI
------------------------------------------------------------------------
Docket No(s)................. 50-316.
Application Date............. June 15, 2021.
ADAMS Accession No........... ML21210A278.
Location in Application of Pages 23-25 of Enclosure 2.
NSHC.
Brief Description of The requested amendment would revise the
Amendment(s). reactor coolant system heatup and
cooldown curves and low temperature
overpressure protection (LTOP)
requirements in Technical Specification
(TS) 3.4.3 and 3.4.12, respectively. The
proposed changes to the LTOP
requirements in TS 3.4.12 will also
require changes to be made to TS 3.4.6,
3.4.7, and 3.4.10.
Proposed Determination....... NSHC.
Name of Attorney for Robert B. Haemer, Senior Nuclear Counsel,
Licensee, Mailing Address. Indiana Michigan Power Company, One Cook
Place, Bridgman, MI 49106.
NRC Project Manager, Scott Wall, 301-415-2855.
Telephone Number.
------------------------------------------------------------------------
Northern States Power Company; Monticello Nuclear Generating Plant;
Wright County, MN
------------------------------------------------------------------------
Docket No(s)................. 50-263.
Application Date............. July 29, 2021.
ADAMS Accession No........... ML21211A594 (Package).
Location in Application of Pages 15-17 of Enclosure.
NSHC.
Brief Description of The amendment would revise the Technical
Amendment(s). Specification 5.6.3 ``Core Operating
Limits Report (COLR),'' to allow the
application of advanced Framatome, Inc.,
methodologies for determining core
operating limits in support of loading
Framatome, Inc. ATRIUM 11 fuel type into
the Monticello Nuclear Generating Plant
core and to incorporate a new long-term
reactor stability solution.
Proposed Determination....... NSHC.
Name of Attorney for Peter M. Glass, Assistant General
Licensee, Mailing Address. Counsel, Xcel Energy, 414 Nicollet Mall--
401-8, Minneapolis, MN 55401.
NRC Project Manager, Robert Kuntz, 301-415-3733
Telephone Number.
------------------------------------------------------------------------
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 2;
Berrien County, MI
Northern States Power Company; Monticello Nuclear Generating Plant;
Wright County, MN
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing SUNSI.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request access to SUNSI. A ``potential party'' is any person who
intends to participate as a party by demonstrating standing and filing
an admissible contention under 10 CFR 2.309. Requests for access to
SUNSI submitted later than 10 days after publication of this notice
will not be considered absent a showing of good cause for the late
filing, addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Deputy General Counsel
for Hearings and Administration, Office of the General Counsel, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001. The expedited
delivery or courier mail address for both offices is: U.S. Nuclear
Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852.
The email address for the Office of the Secretary and the Office of the
General Counsel are [email protected] and
[email protected], respectively.\1\ The request must
include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement
[[Page 55020]]
or Affidavit, or Protective Order \2\ setting forth terms and
conditions to prevent the unauthorized or inadvertent disclosure of
SUNSI by each individual who will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
receipt of (or access to) that information. However, if more than 25
days remain between the petitioner's receipt of (or access to) the
information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and requisite need, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an Administrative Law Judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
(3) Further appeals of decisions under this paragraph must be made
pursuant to 10 CFR 2.311.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed within 5 days of the notification by the
NRC staff of its grant of access and must be filed with: (a) The
presiding officer designated in this proceeding; (b) if no presiding
officer has been appointed, the Chief Administrative Judge, or if he or
she is unavailable, another administrative judge, or an Administrative
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if
another officer has been designated to rule on information access
issues, with that officer.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR part 2. The
attachment to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated: September 21, 2021.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
Supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding.
60....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; and (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention;
+7 petitioner/requestor reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requestor of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows need
for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
25....................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
petitioner/requestor to file a motion
seeking a ruling to reverse the NRC staff's
denial of access; NRC staff files copy of
access determination with the presiding
officer (or Chief Administrative Judge or
other designated officer, as appropriate).
If NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
A........................ If access granted: issuance of presiding
officer or other designated officer decision
on motion for protective order for access to
sensitive information (including schedule
for providing access and submission of
contentions) or decision reversing a final
adverse determination by the NRC staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI
consistent with decision issuing the
protective order.
[[Page 55021]]
A + 28................... Deadline for submission of contentions whose
development depends upon access to SUNSI.
However, if more than 25 days remain between
the petitioner's receipt of (or access to)
the information and the deadline for filing
all other contentions (as established in the
notice of opportunity to request a hearing
and petition for leave to intervene), the
petitioner may file its SUNSI contentions by
that later deadline.
A + 53................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI.
A + 60................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2021-20848 Filed 10-4-21; 8:45 am]