turbine with an International
Organization for Standardization (ISO)
rating of 11,107 horsepower and
auxiliary facilities;
• modifications at existing
Compressor Station 325 in Sussex
County, New Jersey, including
installation of one Solar Titan 130
turbine with an ISO rating of 20,500
horsepower and auxiliary facilities; and
• construction of the new Compressor
Station 327 equipped with a single
19,000-horsepower electric-driven
compressor unit and associated
auxiliary facilities in Passaic County,
New Jersey.
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Proposed East 300 Upgrade Project to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the final EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search), select
‘‘General Search,’’ and enter the docket
number in the ‘‘Docket Number’’ field
(i.e., CP20–493). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
VerDate Sep<11>2014
18:15 Sep 29, 2021
Jkt 253001
Dated: September 24, 2021.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2021–21265 Filed 9–29–21; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. AD21–11–000]
Reliability Technical Conference;
Supplemental Notice of Technical
Conference
As announced in the Notice of
Technical Conference and the
Supplemental Notice of Technical
Conference issued in this proceeding on
March 5, 2021 and August 6, 2021
respectively, the Federal Energy
Regulatory Commission (Commission)
will convene its annual Commissionerled Reliability Technical Conference on
Thursday, September 30, 2021 from
approximately 8:30 a.m. to 5:00 p.m.
Eastern time. The purpose of this
conference is to discuss policy issues
related to the reliability of the BulkPower System. The conference will be
held virtually via WebEx.
The final agenda with confirmed
speakers for this event is attached. The
conference will be open for the public
to attend virtually, and there is no fee
for attendance. Information on the
technical conference will also be posted
on the Calendar of Events on the
Commission’s website, https://
www.ferc.gov, prior to the event. The
conference will be transcribed.
Transcripts of the conference will be
available for a fee from Ace-Federal
Reporters, Inc. (202) 347–3700.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
call toll-free (866) 208–3372 (voice) or
(202) 208–8659 (TTY), or send a fax to
(202) 208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
Lodie White at Lodie.White@ferc.gov or
(202) 502–8453. For information related
to logistics, please contact Sarah
McKinley at Sarah.Mckinley@ferc.gov or
(202) 502–8368.
Dated: September 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21266 Filed 9–29–21; 8:45 am]
BILLING CODE 6717–01–P
Frm 00031
Fmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
DEPARTMENT OF ENERGY
PO 00000
54179
Sfmt 4703
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL21–103–000.
Applicants: SOO Green HVDC Link
ProjectCo, LLC v. PJM Interconnection,
L.L.C.
Description: Complaint of SOO Green
HVDC Link ProjectCo, LLC v. PJM
Interconnection, L.L.C.
Filed Date: 9/21/21.
Accession Number: 20210921–5137.
Comment Date: 5 p.m. ET 10/12/21.
Docket Numbers: EL21–104–000.
Applicants: Carlos H. Diaz-Rivera.
Description: Petition for Enforcement
of Carlos H. Diaz-Rivera.
Filed Date: 9/22/21.
Accession Number: 20210922–5133.
Comment Date: 5 p.m. ET 10/12/21.
Docket Numbers: EL21–105–000.
Applicants: George R. Cotter.
Description: Complaint of George R
Cotter, ESQ on FERC Notice of Proposed
Rule Cybersecurity Incentives dated
December 17, 2020.
Filed Date: 9/10/21.
Accession Number: 20210910–5156.
Comment Date: 5 p.m. ET 10/14/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–190–016;
ER18–1343–011; ER10–2034–007.
Applicants: Duke Energy Indiana,
Inc., Carolina Solar Power, LLC, Duke
Energy Renewable Services, LLC.
Description: Third Amendment to
December 18, 2020 Triennial Market
Power Analysis for Central Region of
Duke Companies.
Filed Date: 9/23/21.
Accession Number: 20210923–5141.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21–486–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO Notice of Effective Date for TCC
Credit requirement to be effective 10/12/
2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5094.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2652–001.
Applicants: Caddo Wind, LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
10/11/2021.
Filed Date: 9/23/21.
E:\FR\FM\30SEN1.SGM
30SEN1
LOTTER on DSK11XQN23PROD with NOTICES1
54180
Federal Register / Vol. 86, No. 187 / Thursday, September 30, 2021 / Notices
Accession Number: 20210923–5134.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2767–001.
Applicants: Skipjack Solar Center,
LLC.
Description: Tariff Amendment:
Skipjack Solar Center, LLC MBR
Supplement to be effective 10/1/2021.
Filed Date: 9/23/21.
Accession Number: 20210923–5133.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2928–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA No. 6182; Queue No. AD2–
163 to be effective 8/25/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5014.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2929–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Submission of Revisions to Western
Joint Dispatch Agreements to be
effective 10/1/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5041.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2930–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Tariff Amendment:
2021–09–24 NSP–MMPA–Meter
Upgrade–CIAC–677–NOC to be effective
9/25/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5068.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2931–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–09–24_SA 3170 Crossett Solar—
EAI 1st Rev GIA (J680) to be effective 9/
7/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5072.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2932–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2021–09–24 Transferred Frequency
Response Agmt—BPA to be effective 12/
1/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5087.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21–2933–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC
submits tariff filing per 35.13(a)(2)(iii:
VerDate Sep<11>2014
18:15 Sep 29, 2021
Jkt 253001
MAIT submits One ECSA, SA No. 6049
to be effective 11/24/2021.
Filed Date: 9/24/21.
Accession Number: 20210924–5112.
Comment Date: 5 p.m. ET 10/15/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 24, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–21298 Filed 9–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Public Participation
[Docket No. CP21–497–000]
Texas Eastern Transmission, LP;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on September 16,
2021Texas Eastern Transmission, LP
(Texas Eastern), 5400 Westheimer Court,
Houston, Texas 77056–5310, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.208 of the Commission’s
regulations under the Natural Gas Act
(NGA) and Texas Eastern’s blanket
certificate issued in Docket No. CP82–
535–000, for authorization to construct,
own, and operate a new receipt
metering and regulating station along its
existing Line 41 Pipeline and an
associated permanent access road in
Beauregard Parish, Louisiana.
Specifically, Texas Eastern proposes to
install facilities for the receipt of up to
500 million cubic feet per day of natural
gas from the Acadian Gas Pipeline
System. Texas Eastern states that the
proposed activities will have no impact
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
on the certificated capacity of its
system, and there will be no
abandonment or reduction in service to
any customer of Texas Eastern as a
result of the project, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
Arthur Diestel, Director of Regulatory
Affairs, Texas Eastern Transmission, LP,
P.O. Box 1642, Houston, Texas 77251–
1642 at (713) 627–5116 or at
arthur.diestel@enbridge.com.
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on November 23, 2021.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 86, Number 187 (Thursday, September 30, 2021)]
[Notices]
[Pages 54179-54180]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21298]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL21-103-000.
Applicants: SOO Green HVDC Link ProjectCo, LLC v. PJM
Interconnection, L.L.C.
Description: Complaint of SOO Green HVDC Link ProjectCo, LLC v. PJM
Interconnection, L.L.C.
Filed Date: 9/21/21.
Accession Number: 20210921-5137.
Comment Date: 5 p.m. ET 10/12/21.
Docket Numbers: EL21-104-000.
Applicants: Carlos H. Diaz-Rivera.
Description: Petition for Enforcement of Carlos H. Diaz-Rivera.
Filed Date: 9/22/21.
Accession Number: 20210922-5133.
Comment Date: 5 p.m. ET 10/12/21.
Docket Numbers: EL21-105-000.
Applicants: George R. Cotter.
Description: Complaint of George R Cotter, ESQ on FERC Notice of
Proposed Rule Cybersecurity Incentives dated December 17, 2020.
Filed Date: 9/10/21.
Accession Number: 20210910-5156.
Comment Date: 5 p.m. ET 10/14/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-190-016; ER18-1343-011; ER10-2034-007.
Applicants: Duke Energy Indiana, Inc., Carolina Solar Power, LLC,
Duke Energy Renewable Services, LLC.
Description: Third Amendment to December 18, 2020 Triennial Market
Power Analysis for Central Region of Duke Companies.
Filed Date: 9/23/21.
Accession Number: 20210923-5141.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER21-486-002.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: NYISO Notice of Effective Date for
TCC Credit requirement to be effective 10/12/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5094.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2652-001.
Applicants: Caddo Wind, LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 10/11/2021.
Filed Date: 9/23/21.
[[Page 54180]]
Accession Number: 20210923-5134.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2767-001.
Applicants: Skipjack Solar Center, LLC.
Description: Tariff Amendment: Skipjack Solar Center, LLC MBR
Supplement to be effective 10/1/2021.
Filed Date: 9/23/21.
Accession Number: 20210923-5133.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2928-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA No. 6182; Queue
No. AD2-163 to be effective 8/25/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5014.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2929-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Submission of Revisions to
Western Joint Dispatch Agreements to be effective 10/1/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5041.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2930-000.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Tariff Amendment: 2021-09-24 NSP-MMPA-Meter Upgrade-
CIAC-677-NOC to be effective 9/25/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5068.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2931-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-09-24_SA 3170 Crossett
Solar--EAI 1st Rev GIA (J680) to be effective 9/7/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5072.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2932-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2021-09-24 Transferred
Frequency Response Agmt--BPA to be effective 12/1/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5087.
Comment Date: 5 p.m. ET 10/15/21.
Docket Numbers: ER21-2933-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Mid-Atlantic Interstate
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT
submits One ECSA, SA No. 6049 to be effective 11/24/2021.
Filed Date: 9/24/21.
Accession Number: 20210924-5112.
Comment Date: 5 p.m. ET 10/15/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 24, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-21298 Filed 9-29-21; 8:45 am]
BILLING CODE 6717-01-P