Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 54180-54181 [2021-21269]

Download as PDF LOTTER on DSK11XQN23PROD with NOTICES1 54180 Federal Register / Vol. 86, No. 187 / Thursday, September 30, 2021 / Notices Accession Number: 20210923–5134. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2767–001. Applicants: Skipjack Solar Center, LLC. Description: Tariff Amendment: Skipjack Solar Center, LLC MBR Supplement to be effective 10/1/2021. Filed Date: 9/23/21. Accession Number: 20210923–5133. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2928–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA No. 6182; Queue No. AD2– 163 to be effective 8/25/2021. Filed Date: 9/24/21. Accession Number: 20210924–5014. Comment Date: 5 p.m. ET 10/15/21. Docket Numbers: ER21–2929–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Submission of Revisions to Western Joint Dispatch Agreements to be effective 10/1/2021. Filed Date: 9/24/21. Accession Number: 20210924–5041. Comment Date: 5 p.m. ET 10/15/21. Docket Numbers: ER21–2930–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: Tariff Amendment: 2021–09–24 NSP–MMPA–Meter Upgrade–CIAC–677–NOC to be effective 9/25/2021. Filed Date: 9/24/21. Accession Number: 20210924–5068. Comment Date: 5 p.m. ET 10/15/21. Docket Numbers: ER21–2931–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2021–09–24_SA 3170 Crossett Solar— EAI 1st Rev GIA (J680) to be effective 9/ 7/2021. Filed Date: 9/24/21. Accession Number: 20210924–5072. Comment Date: 5 p.m. ET 10/15/21. Docket Numbers: ER21–2932–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2021–09–24 Transferred Frequency Response Agmt—BPA to be effective 12/ 1/2021. Filed Date: 9/24/21. Accession Number: 20210924–5087. Comment Date: 5 p.m. ET 10/15/21. Docket Numbers: ER21–2933–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: VerDate Sep<11>2014 18:15 Sep 29, 2021 Jkt 253001 MAIT submits One ECSA, SA No. 6049 to be effective 11/24/2021. Filed Date: 9/24/21. Accession Number: 20210924–5112. Comment Date: 5 p.m. ET 10/15/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 24, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–21298 Filed 9–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Public Participation [Docket No. CP21–497–000] Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on September 16, 2021Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056–5310, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA) and Texas Eastern’s blanket certificate issued in Docket No. CP82– 535–000, for authorization to construct, own, and operate a new receipt metering and regulating station along its existing Line 41 Pipeline and an associated permanent access road in Beauregard Parish, Louisiana. Specifically, Texas Eastern proposes to install facilities for the receipt of up to 500 million cubic feet per day of natural gas from the Acadian Gas Pipeline System. Texas Eastern states that the proposed activities will have no impact PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 on the certificated capacity of its system, and there will be no abandonment or reduction in service to any customer of Texas Eastern as a result of the project, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this prior notice request should be directed to Arthur Diestel, Director of Regulatory Affairs, Texas Eastern Transmission, LP, P.O. Box 1642, Houston, Texas 77251– 1642 at (713) 627–5116 or at arthur.diestel@enbridge.com. There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on November 23, 2021. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons E:\FR\FM\30SEN1.SGM 30SEN1 LOTTER on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 86, No. 187 / Thursday, September 30, 2021 / Notices authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is November 23, 2021. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. of all documents filed by the applicant and by all other parties. Interventions How To File Protests, Interventions, and Comments Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is November 23, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 VerDate Sep<11>2014 18:15 Sep 29, 2021 Jkt 253001 Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before November 23, 2021. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–497–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below.7 Your submission must reference the Project docket number CP21–497– 000. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: 1001 Louisiana Street, Houston, Texas 77002 or email (with a link to the document) at debbie_ kalisek@kindermorgan.com. Any subsequent submissions by an intervenor must be served on the 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. 7 Hand-delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 54181 applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: September 24, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–21269 Filed 9–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14513–003] Idaho Irrigation District and New Sweden Irrigation District; Notice of Intent To Prepare an Environmental Assessment On September 29, 2020, the Idaho Irrigation District and New Sweden Irrigation District filed an application for an original license to construct and operate the 2.5-megawatt County Line Road Hydroelectric Project No. 14513 (project). The proposed project would be located on the Snake River in Bonneville and Jefferson Counties, Idaho. The project would not occupy federal lands. In accordance with the Commission’s regulations, on July 14, 2021, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major federal E:\FR\FM\30SEN1.SGM 30SEN1

Agencies

[Federal Register Volume 86, Number 187 (Thursday, September 30, 2021)]
[Notices]
[Pages 54180-54181]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21269]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-497-000]


Texas Eastern Transmission, LP; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on September 16, 2021Texas Eastern Transmission, 
LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310, 
filed in the above referenced docket, a prior notice request pursuant 
to sections 157.205 and 157.208 of the Commission's regulations under 
the Natural Gas Act (NGA) and Texas Eastern's blanket certificate 
issued in Docket No. CP82-535-000, for authorization to construct, own, 
and operate a new receipt metering and regulating station along its 
existing Line 41 Pipeline and an associated permanent access road in 
Beauregard Parish, Louisiana. Specifically, Texas Eastern proposes to 
install facilities for the receipt of up to 500 million cubic feet per 
day of natural gas from the Acadian Gas Pipeline System. Texas Eastern 
states that the proposed activities will have no impact on the 
certificated capacity of its system, and there will be no abandonment 
or reduction in service to any customer of Texas Eastern as a result of 
the project, all as more fully set forth in the application which is on 
file with the Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this prior notice request should be 
directed to Arthur Diestel, Director of Regulatory Affairs, Texas 
Eastern Transmission, LP, P.O. Box 1642, Houston, Texas 77251-1642 at 
(713) 627-5116 or at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: You can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on November 23, 2021. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be

[[Page 54181]]

authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is November 23, 2021. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is November 23, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before November 23, 2021. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-497-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below.\7\ Your submission must reference the Project docket 
number CP21-497-000.
---------------------------------------------------------------------------

    \7\ Hand-delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
    Protests and motions to intervene must be served on the applicant 
either by mail at: 1001 Louisiana Street, Houston, Texas 77002 or email 
(with a link to the document) at [email protected]. Any 
subsequent submissions by an intervenor must be served on the applicant 
and all other parties to the proceeding. Contact information for 
parties can be downloaded from the service list at the eService link on 
FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: September 24, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21269 Filed 9-29-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.