City of North Little Rock; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 53956 [2021-21156]
Download as PDF
53956
Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21150 Filed 9–28–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15226–000]
lotter on DSK11XQN23PROD with NOTICES1
City of North Little Rock; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 28, 2021, the City of North
Little Rock filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Toad Suck
Ferry Lock & Dam Hydroelectric Project
No. 15226–000 (Toad Suck Ferry
Project, or project), a run-of-river project
to be located at the existing U.S. Army
Corps of Engineers’ Toad Suck Ferry
Lock and Dam in Faulkner County,
Arkansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An existing reservoir
with a maximum water surface
elevation of 265.3 feet mean sea level;
(2) an existing, 1,450-foot-long lock and
dam, including a 1,120-foot-long
spillway section with 16, 60-foot-long
by 27-foot-high tainter gates; (3) a new
headrace intake channel; (4) a new
concrete powerhouse housing one, 40megawatt horizontal turbine-generator
unit; (5) a new discharge penstock; (6)
a new tailrace receiving flow from the
penstock; (7) a new interconnection line
to either the existing, 69 kilo-Volt (kV)
VerDate Sep<11>2014
18:22 Sep 28, 2021
Jkt 253001
Bigelow substation, or the existing, 115kV Mayflower substation; and (8)
appurtenant facilities.
Applicant Contact: Scott Springer,
1400 W Maryland Ave., North Little
Rock, Arkansas, 72120; phone: (501)
372–0100.
FERC Contact: Navreet Deo; phone:
(202) 502–6304; email: navreet.deo@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. In lieu of electronic
filing, you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15226–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15226) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21156 Filed 9–28–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2207–050]
Ahlstrom-Munksjo Specialty Solutions,
LLC; Notice of Application Accepted
for Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-Capacity
Amendment of License.
b. Project No.: 2207–050.
c. Date Filed: August 2, 2021, as
supplemented on September 22, 2021.
d. Applicant: Ahlstrom-Munksjo
Specialty Solutions, LLC.
e. Name of Project: Mosinee
Hydroelectric Project.
f. Location: The project is located on
the Wisconsin River, in the town of
Mosinee, Marathon County, Wisconsin,
and does not occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Andy
Cychosz, Environmental Manager, 100
Main Street, Mosinee, WI 54455, (715)
692–3330, Andy.Cychosz@AhlstromMunksjo.com.
i. FERC Contact: Chris Chaney, (202)
502–6778, christopher.chaney@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 86, Number 186 (Wednesday, September 29, 2021)]
[Notices]
[Page 53956]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21156]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15226-000]
City of North Little Rock; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On June 28, 2021, the City of North Little Rock filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Toad Suck
Ferry Lock & Dam Hydroelectric Project No. 15226-000 (Toad Suck Ferry
Project, or project), a run-of-river project to be located at the
existing U.S. Army Corps of Engineers' Toad Suck Ferry Lock and Dam in
Faulkner County, Arkansas. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) An
existing reservoir with a maximum water surface elevation of 265.3 feet
mean sea level; (2) an existing, 1,450-foot-long lock and dam,
including a 1,120-foot-long spillway section with 16, 60-foot-long by
27-foot-high tainter gates; (3) a new headrace intake channel; (4) a
new concrete powerhouse housing one, 40-megawatt horizontal turbine-
generator unit; (5) a new discharge penstock; (6) a new tailrace
receiving flow from the penstock; (7) a new interconnection line to
either the existing, 69 kilo-Volt (kV) Bigelow substation, or the
existing, 115-kV Mayflower substation; and (8) appurtenant facilities.
Applicant Contact: Scott Springer, 1400 W Maryland Ave., North
Little Rock, Arkansas, 72120; phone: (501) 372-0100.
FERC Contact: Navreet Deo; phone: (202) 502-6304; email:
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15226-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15226) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21156 Filed 9-28-21; 8:45 am]
BILLING CODE 6717-01-P