Pacific Gas and Electric Company; Notice of Intent To Prepare an Environmental Assessment, 53957 [2021-21155]
Download as PDF
53957
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices
any filing should include docket
number P–2207–050. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, it must also
serve a copy of the document on that
resource agency.
k. Description of Request: The
licensee proposes to replace the Unit
No. 1 runner with a runner of the same
fixed-blade propeller design and outer
diameter, and update the project’s
automation, including replacing the
Unit No. 1 governor, installing a SCADA
system, and installing video systems for
remote monitoring. The proposal would
increase the installed capacity of Unit
No. 1 from 1,800 to 2,250 kilowatts
(kW). The licensee is not proposing
changes to the other two units, and no
ground disturbing activity would occur.
Under the proposed amendment, the
project’s authorized installed capacity
would increase from 3,050 to 3,500 kW,
and the total hydraulic capacity would
increase from 2,250 to 2,720 cubic feet
per second.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at FERCOnline
Support@ferc.gov or call toll-free, (886)
208–3676 or TYY, (202) 502–8659.
Agencies may obtain copies of the
application directly from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
VerDate Sep<11>2014
18:22 Sep 28, 2021
Jkt 253001
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting, or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to relicense the Phoenix
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
draft EA.
Comments on draft
EA.
Commission issues
final EA.
Target date
May 2022.
June 2022.
September 2022 1.
Any questions regarding this notice
may be directed to Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21155 Filed 9–28–21; 8:45 am]
[FR Doc. 2021–21154 Filed 9–28–21; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[Project No. 1061–103]
Pacific Gas and Electric Company;
Notice of Intent To Prepare an
Environmental Assessment
On August 24, 2020, Pacific Gas and
Electric Company filed an application
for a major, new license for the 1.6
megawatts Phoenix Hydroelectric
Project (FERC No. 1061). The existing
project is located on the South Fork
Stanislaus River and in the Tuolumne
River Basin, in Tuolumne County,
California. The project occupies 26.99
acres of federal land administered by
the U.S. Forest Service and 0.59 acres
administered by the Bureau of Land
Management.
In accordance with the Commission’s
regulations, on July 2, 2021,
Commission staff issued a notice that
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2148–004.
Applicants: Lexington Chenoa Wind
Farm LLC.
Description: Refund Report: Refund
Report Under Docket ER20–2148–000 to
be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923–5041.
Comment Date: 5 p.m. ET 10/14/21.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare a draft and final EA for the Phoenix Project.
Therefore, in accordance with CEQ’s regulations,
the final EA must be issued within 1 year of the
issuance date of this notice.
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 86, Number 186 (Wednesday, September 29, 2021)]
[Notices]
[Page 53957]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21155]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1061-103]
Pacific Gas and Electric Company; Notice of Intent To Prepare an
Environmental Assessment
On August 24, 2020, Pacific Gas and Electric Company filed an
application for a major, new license for the 1.6 megawatts Phoenix
Hydroelectric Project (FERC No. 1061). The existing project is located
on the South Fork Stanislaus River and in the Tuolumne River Basin, in
Tuolumne County, California. The project occupies 26.99 acres of
federal land administered by the U.S. Forest Service and 0.59 acres
administered by the Bureau of Land Management.
In accordance with the Commission's regulations, on July 2, 2021,
Commission staff issued a notice that the project was ready for
environmental analysis (REA Notice). Based on the information in the
record, including comments filed on the REA Notice, staff does not
anticipate that licensing the project would constitute a major federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare a draft and final Environmental
Assessment (EA) on the application to relicense the Phoenix Project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare a draft and
final EA for the Phoenix Project. Therefore, in accordance with
CEQ's regulations, the final EA must be issued within 1 year of the
issuance date of this notice.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues draft EA................ May 2022.
Comments on draft EA...................... June 2022.
Commission issues final EA................ September 2022 \1\.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Jim
Hastreiter at (503) 552-2760 or [email protected].
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21155 Filed 9-28-21; 8:45 am]