Combined Notice of Filings #1, 53957-53958 [2021-21149]
Download as PDF
53957
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices
any filing should include docket
number P–2207–050. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, it must also
serve a copy of the document on that
resource agency.
k. Description of Request: The
licensee proposes to replace the Unit
No. 1 runner with a runner of the same
fixed-blade propeller design and outer
diameter, and update the project’s
automation, including replacing the
Unit No. 1 governor, installing a SCADA
system, and installing video systems for
remote monitoring. The proposal would
increase the installed capacity of Unit
No. 1 from 1,800 to 2,250 kilowatts
(kW). The licensee is not proposing
changes to the other two units, and no
ground disturbing activity would occur.
Under the proposed amendment, the
project’s authorized installed capacity
would increase from 3,050 to 3,500 kW,
and the total hydraulic capacity would
increase from 2,250 to 2,720 cubic feet
per second.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at FERCOnline
Support@ferc.gov or call toll-free, (886)
208–3676 or TYY, (202) 502–8659.
Agencies may obtain copies of the
application directly from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
VerDate Sep<11>2014
18:22 Sep 28, 2021
Jkt 253001
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting, or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to relicense the Phoenix
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
draft EA.
Comments on draft
EA.
Commission issues
final EA.
Target date
May 2022.
June 2022.
September 2022 1.
Any questions regarding this notice
may be directed to Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21155 Filed 9–28–21; 8:45 am]
[FR Doc. 2021–21154 Filed 9–28–21; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[Project No. 1061–103]
Pacific Gas and Electric Company;
Notice of Intent To Prepare an
Environmental Assessment
On August 24, 2020, Pacific Gas and
Electric Company filed an application
for a major, new license for the 1.6
megawatts Phoenix Hydroelectric
Project (FERC No. 1061). The existing
project is located on the South Fork
Stanislaus River and in the Tuolumne
River Basin, in Tuolumne County,
California. The project occupies 26.99
acres of federal land administered by
the U.S. Forest Service and 0.59 acres
administered by the Bureau of Land
Management.
In accordance with the Commission’s
regulations, on July 2, 2021,
Commission staff issued a notice that
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2148–004.
Applicants: Lexington Chenoa Wind
Farm LLC.
Description: Refund Report: Refund
Report Under Docket ER20–2148–000 to
be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923–5041.
Comment Date: 5 p.m. ET 10/14/21.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare a draft and final EA for the Phoenix Project.
Therefore, in accordance with CEQ’s regulations,
the final EA must be issued within 1 year of the
issuance date of this notice.
E:\FR\FM\29SEN1.SGM
29SEN1
lotter on DSK11XQN23PROD with NOTICES1
53958
Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices
Docket Numbers: ER20–2446–004.
Applicants: Bitter Ridge Wind Farm,
LLC.
Description: Refund Report: Refund
Report Under Docket ER20–2446–000 to
be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923–5042.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER20–2503–003.
Applicants: Paulding Wind Farm IV
LLC.
Description: Refund Report: Refund
Report Under Docket ER20–2503 to be
effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923–5051.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER20–2953–003.
Applicants: Lone Tree Wind, LLC.
Description: Refund Report: Refund
Report Under Docket ER20–2953 to be
effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923–5053.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2570–001.
Applicants: TC Energy Marketing Inc.
Description: Tariff Amendment:
Amended MBR Tariff and Application
(ER21–2570–) to be effective 9/30/2021.
Filed Date: 9/23/21.
Accession Number: 20210923–5097.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2925–000.
Applicants: Grand Ridge Energy LLC.
Description: Initial rate filing: Filing
of Reactive Power Rate Schedule to be
effective 11/1/2021.
Filed Date: 9/23/21.
Accession Number: 20210923–5111.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2926–000.
Applicants: Caddo Wind, LLC.
Description: § 205(d) Rate Filing:
Supplement to Application for MarketBased Rate Authorization to be effective
10/11/2021.
Filed Date: 9/23/21.
Accession Number: 20210923–5113.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21–2927–000.
Applicants: Optimum Power
Investments, LLC.
Description: Tariff Amendment:
Notice of Cancellation to be effective 9/
30/2021.
Filed Date: 9/23/21.
Accession Number: 20210923–5118.
Comment Date: 5 p.m. ET 10/14/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
VerDate Sep<11>2014
18:22 Sep 28, 2021
Jkt 253001
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Federal Energy Regulatory
Commission
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to
Francisco Tarin, Director, Regulatory,
Mojave Pipeline Company, L.L.C., P.O.
Box 1087, Colorado Springs, Colorado
80944, by telephone (719) 667–7517, or
by email at Francisco_Tarin@
kindermorgan.com.
[Docket No. CP21–495–000]
Public Participation
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21149 Filed 9–28–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Mojave Pipeline Company, L.L.C.;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on September 13,
2021, Mojave Pipeline Company, L.L.C.
(Mojave), Post Office Box 1087,
Colorado Springs, Colorado 80944, filed
in the above referenced docket a prior
notice pursuant to Sections 157.203,
157.205, and 157.211 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
and the blanket certificates issued to
Mojave by the Commission in Docket
Nos. CP89–1–000 and CP89–2–000
seeking for authorization to construct a
delivery point located in Kern County,
California. Mojave states that delivery
point will permit the transportation and
delivery of natural gas to CalPortland
Company. Mojave states that the
delivery meter facility will be designed
and constructed to permit delivery
flows of up to 17,000 Mcf per day and
that the estimated cost of the proposed
delivery station is $391,696. The
proposed delivery point will serve as a
bypass of the existing service of Pacific
Gas and Electric Company, the local
distribution company, all as more fully
set forth in the request which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on November 22, 2021.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 86, Number 186 (Wednesday, September 29, 2021)]
[Notices]
[Pages 53957-53958]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21149]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-2148-004.
Applicants: Lexington Chenoa Wind Farm LLC.
Description: Refund Report: Refund Report Under Docket ER20-2148-
000 to be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923-5041.
Comment Date: 5 p.m. ET 10/14/21.
[[Page 53958]]
Docket Numbers: ER20-2446-004.
Applicants: Bitter Ridge Wind Farm, LLC.
Description: Refund Report: Refund Report Under Docket ER20-2446-
000 to be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923-5042.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER20-2503-003.
Applicants: Paulding Wind Farm IV LLC.
Description: Refund Report: Refund Report Under Docket ER20-2503 to
be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923-5051.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER20-2953-003.
Applicants: Lone Tree Wind, LLC.
Description: Refund Report: Refund Report Under Docket ER20-2953 to
be effective N/A.
Filed Date: 9/23/21.
Accession Number: 20210923-5053.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2570-001.
Applicants: TC Energy Marketing Inc.
Description: Tariff Amendment: Amended MBR Tariff and Application
(ER21-2570-) to be effective 9/30/2021.
Filed Date: 9/23/21.
Accession Number: 20210923-5097.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2925-000.
Applicants: Grand Ridge Energy LLC.
Description: Initial rate filing: Filing of Reactive Power Rate
Schedule to be effective 11/1/2021.
Filed Date: 9/23/21.
Accession Number: 20210923-5111.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2926-000.
Applicants: Caddo Wind, LLC.
Description: Sec. 205(d) Rate Filing: Supplement to Application
for Market-Based Rate Authorization to be effective 10/11/2021.
Filed Date: 9/23/21.
Accession Number: 20210923-5113.
Comment Date: 5 p.m. ET 10/14/21.
Docket Numbers: ER21-2927-000.
Applicants: Optimum Power Investments, LLC.
Description: Tariff Amendment: Notice of Cancellation to be
effective 9/30/2021.
Filed Date: 9/23/21.
Accession Number: 20210923-5118.
Comment Date: 5 p.m. ET 10/14/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21149 Filed 9-28-21; 8:45 am]
BILLING CODE 6717-01-P