Combined Notice of Filings #1, 53957-53958 [2021-21149]

Download as PDF 53957 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices any filing should include docket number P–2207–050. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, it must also serve a copy of the document on that resource agency. k. Description of Request: The licensee proposes to replace the Unit No. 1 runner with a runner of the same fixed-blade propeller design and outer diameter, and update the project’s automation, including replacing the Unit No. 1 governor, installing a SCADA system, and installing video systems for remote monitoring. The proposal would increase the installed capacity of Unit No. 1 from 1,800 to 2,250 kilowatts (kW). The licensee is not proposing changes to the other two units, and no ground disturbing activity would occur. Under the proposed amendment, the project’s authorized installed capacity would increase from 3,050 to 3,500 kW, and the total hydraulic capacity would increase from 2,250 to 2,720 cubic feet per second. l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnline Support@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the VerDate Sep<11>2014 18:22 Sep 28, 2021 Jkt 253001 requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified deadline date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting, or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: September 23, 2021. Kimberly D. Bose, Secretary. the project was ready for environmental analysis (REA Notice). Based on the information in the record, including comments filed on the REA Notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare a draft and final Environmental Assessment (EA) on the application to relicense the Phoenix Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Commission issues draft EA. Comments on draft EA. Commission issues final EA. Target date May 2022. June 2022. September 2022 1. Any questions regarding this notice may be directed to Jim Hastreiter at (503) 552–2760 or james.hastreiter@ ferc.gov. Dated: September 23, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–21155 Filed 9–28–21; 8:45 am] [FR Doc. 2021–21154 Filed 9–28–21; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings #1 [Project No. 1061–103] Pacific Gas and Electric Company; Notice of Intent To Prepare an Environmental Assessment On August 24, 2020, Pacific Gas and Electric Company filed an application for a major, new license for the 1.6 megawatts Phoenix Hydroelectric Project (FERC No. 1061). The existing project is located on the South Fork Stanislaus River and in the Tuolumne River Basin, in Tuolumne County, California. The project occupies 26.99 acres of federal land administered by the U.S. Forest Service and 0.59 acres administered by the Bureau of Land Management. In accordance with the Commission’s regulations, on July 2, 2021, Commission staff issued a notice that PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–2148–004. Applicants: Lexington Chenoa Wind Farm LLC. Description: Refund Report: Refund Report Under Docket ER20–2148–000 to be effective N/A. Filed Date: 9/23/21. Accession Number: 20210923–5041. Comment Date: 5 p.m. ET 10/14/21. 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare a draft and final EA for the Phoenix Project. Therefore, in accordance with CEQ’s regulations, the final EA must be issued within 1 year of the issuance date of this notice. E:\FR\FM\29SEN1.SGM 29SEN1 lotter on DSK11XQN23PROD with NOTICES1 53958 Federal Register / Vol. 86, No. 186 / Wednesday, September 29, 2021 / Notices Docket Numbers: ER20–2446–004. Applicants: Bitter Ridge Wind Farm, LLC. Description: Refund Report: Refund Report Under Docket ER20–2446–000 to be effective N/A. Filed Date: 9/23/21. Accession Number: 20210923–5042. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER20–2503–003. Applicants: Paulding Wind Farm IV LLC. Description: Refund Report: Refund Report Under Docket ER20–2503 to be effective N/A. Filed Date: 9/23/21. Accession Number: 20210923–5051. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER20–2953–003. Applicants: Lone Tree Wind, LLC. Description: Refund Report: Refund Report Under Docket ER20–2953 to be effective N/A. Filed Date: 9/23/21. Accession Number: 20210923–5053. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2570–001. Applicants: TC Energy Marketing Inc. Description: Tariff Amendment: Amended MBR Tariff and Application (ER21–2570–) to be effective 9/30/2021. Filed Date: 9/23/21. Accession Number: 20210923–5097. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2925–000. Applicants: Grand Ridge Energy LLC. Description: Initial rate filing: Filing of Reactive Power Rate Schedule to be effective 11/1/2021. Filed Date: 9/23/21. Accession Number: 20210923–5111. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2926–000. Applicants: Caddo Wind, LLC. Description: § 205(d) Rate Filing: Supplement to Application for MarketBased Rate Authorization to be effective 10/11/2021. Filed Date: 9/23/21. Accession Number: 20210923–5113. Comment Date: 5 p.m. ET 10/14/21. Docket Numbers: ER21–2927–000. Applicants: Optimum Power Investments, LLC. Description: Tariff Amendment: Notice of Cancellation to be effective 9/ 30/2021. Filed Date: 9/23/21. Accession Number: 20210923–5118. Comment Date: 5 p.m. ET 10/14/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings VerDate Sep<11>2014 18:22 Sep 28, 2021 Jkt 253001 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at:https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Francisco Tarin, Director, Regulatory, Mojave Pipeline Company, L.L.C., P.O. Box 1087, Colorado Springs, Colorado 80944, by telephone (719) 667–7517, or by email at Francisco_Tarin@ kindermorgan.com. [Docket No. CP21–495–000] Public Participation Dated: September 23, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–21149 Filed 9–28–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Mojave Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on September 13, 2021, Mojave Pipeline Company, L.L.C. (Mojave), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in the above referenced docket a prior notice pursuant to Sections 157.203, 157.205, and 157.211 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act and the blanket certificates issued to Mojave by the Commission in Docket Nos. CP89–1–000 and CP89–2–000 seeking for authorization to construct a delivery point located in Kern County, California. Mojave states that delivery point will permit the transportation and delivery of natural gas to CalPortland Company. Mojave states that the delivery meter facility will be designed and constructed to permit delivery flows of up to 17,000 Mcf per day and that the estimated cost of the proposed delivery station is $391,696. The proposed delivery point will serve as a bypass of the existing service of Pacific Gas and Electric Company, the local distribution company, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on November 22, 2021. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons E:\FR\FM\29SEN1.SGM 29SEN1

Agencies

[Federal Register Volume 86, Number 186 (Wednesday, September 29, 2021)]
[Notices]
[Pages 53957-53958]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21149]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER20-2148-004.
    Applicants: Lexington Chenoa Wind Farm LLC.
    Description: Refund Report: Refund Report Under Docket ER20-2148-
000 to be effective N/A.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5041.
    Comment Date: 5 p.m. ET 10/14/21.


[[Page 53958]]


    Docket Numbers: ER20-2446-004.
    Applicants: Bitter Ridge Wind Farm, LLC.
    Description: Refund Report: Refund Report Under Docket ER20-2446-
000 to be effective N/A.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5042.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER20-2503-003.
    Applicants: Paulding Wind Farm IV LLC.
    Description: Refund Report: Refund Report Under Docket ER20-2503 to 
be effective N/A.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5051.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER20-2953-003.
    Applicants: Lone Tree Wind, LLC.
    Description: Refund Report: Refund Report Under Docket ER20-2953 to 
be effective N/A.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5053.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER21-2570-001.
    Applicants: TC Energy Marketing Inc.
    Description: Tariff Amendment: Amended MBR Tariff and Application 
(ER21-2570-) to be effective 9/30/2021.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5097.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER21-2925-000.
    Applicants: Grand Ridge Energy LLC.
    Description: Initial rate filing: Filing of Reactive Power Rate 
Schedule to be effective 11/1/2021.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5111.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER21-2926-000.
    Applicants: Caddo Wind, LLC.
    Description: Sec.  205(d) Rate Filing: Supplement to Application 
for Market-Based Rate Authorization to be effective 10/11/2021.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5113.
    Comment Date: 5 p.m. ET 10/14/21.

    Docket Numbers: ER21-2927-000.
    Applicants: Optimum Power Investments, LLC.
    Description: Tariff Amendment: Notice of Cancellation to be 
effective 9/30/2021.
    Filed Date: 9/23/21.
    Accession Number: 20210923-5118.
    Comment Date: 5 p.m. ET 10/14/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21149 Filed 9-28-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.