Bard College, New York; Notice of Intent To Prepare an Environmental Assessment, 53649-53650 [2021-21015]
Download as PDF
53649
Federal Register / Vol. 86, No. 185 / Tuesday, September 28, 2021 / Notices
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
eFiling.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2530–057.
For further information, contact
Dianne Rodman at (202) 502–6077, or
by email at dianne.rodman@ferc.gov.
Dated: September 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21014 Filed 9–27–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:35 Sep 27, 2021
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP21–1135–000.
Applicants: Texas Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Amendments to Neg Rate Agmts (BP
37587, 37586) to be effective 9/21/2021.
Filed Date: 9/21/21.
Accession Number: 20210921–5118.
Comment Date: 5 p.m. ET 10/4/21.
Docket Numbers: RP21–1136–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.22.21
Negotiated Rates—Freepoint
Commodities LLC R–7250–36 to be
effective 11/1/2021.
Filed Date: 9/22/21.
Accession Number: 20210922–5028.
Comment Date: 5 p.m. ET 10/4/21.
Docket Numbers: RP21–1137–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.22.21
Negotiated Rates—Freepoint
Commodities LLC R–7250–37 to be
effective 11/1/2021.
Filed Date: 9/22/21.
Accession Number: 20210922–5029.
Comment Date: 5 p.m. ET 10/4/21.
Docket Numbers: RP21–1138–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 9.22.21
Negotiated Rates—Freepoint
Commodities LLC R–7250–38 to be
effective 11/1/2021.
Filed Date: 9/22/21.
Accession Number: 20210922–5030.
Comment Date: 5 p.m. ET 10/4/21.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 22, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–21024 Filed 9–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15021–000]
Bard College, New York; Notice of
Intent To Prepare an Environmental
Assessment
On December 23, 2019, Bard College,
New York filed an application for an
exemption from licensing for the 10kilowatt Annandale Micro Hydropower
Project (Annandale Project) (FERC No.
15021). The Annandale Project is
located on the Saw Kill, a tributary of
the Hudson River, in the Town of Red
Hook, Dutchess County, New York. The
project does not occupy federal land.
In accordance with the Commission’s
regulations, on July 9, 2021,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to exempt the Annandale
Project from licensing.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s decision on whether to
issue an exemption from licensing for
the project.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues EA ........
E:\FR\FM\28SEN1.SGM
28SEN1
Target date
January
2022.1
53650
Federal Register / Vol. 86, No. 185 / Tuesday, September 28, 2021 / Notices
Milestone
Comments on EA .................
Target date
February
2022.
1 The Council on Environmental Quality’s
(CEQ)
regulations
under
40
CFR
1501.10(b)(1) require that EAs be completed
within 1 year of the federal action agency’s
decision to prepare an EA. This notice establishes the Commission’s intent to prepare an
EA for the Annandale Project. Therefore, in
accordance with CEQ’s regulations, the EA
must be issued within 1 year of the issuance
date of this notice.
Any questions regarding this notice
may be directed to Monir Chowdhury at
(202) 502–6736 or monir.chowdhury@
ferc.gov or Laurie Bauer at (202) 502–
6519 or Laurie Bauer@ferc.gov.
Dated: September 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–21015 Filed 9–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC21–153–000]
Pacific Gas and Electric Company;
Notice of Filing
Take notice that on August 25, 2021,
Pacific Gas and Electric Company
(PG&E) requested from the Chief
Accountant of the Federal Energy
Regulatory Commission (Commission or
FERC) an interpretation of the
Commission’s Uniform System of
Accounts (USoA) that would allow
PG&E to capitalize costs related to its
Tower Coating Program.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
VerDate Sep<11>2014
16:35 Sep 27, 2021
Jkt 253001
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on October 4, 2021.
Dated: September 22, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–21022 Filed 9–27–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–527–000]
Columbia Gulf Transmission, LLC;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed East Lateral Xpress
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the East Lateral XPress Project
(Project), proposed by Columbia Gulf
Transmission, LLC (Columbia Gulf) in
the above-referenced docket. Columbia
Gulf requests authorization to construct
and operate natural gas transmission
facilities in Louisiana. The Project is
designed to provide a total of 725
million standard cubic feet per day of
firm transportation capacity, through a
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
combination of incremental and existing
capacity on Columbia Gulf’s interstate
natural gas pipeline system, to an
interconnect with Venture Global Gator
Express, LLC, for ultimate delivery as
feed gas for Venture Global Plaquemines
LNG, LLC’s facility in Plaquemines
Parish.
The final EIS responds to comments
that were received on the Commission’s
March 16, 2021 Environmental
Assessment (EA) and June 25, 2021 draft
EIS 1 and discloses downstream
greenhouse gas emissions for the
Project. With the exception of climate
change impacts, the FERC staff
concludes that approval of the proposed
Project, with the mitigation measures
recommended in this EIS, would not
result in significant environmental
impacts. FERC staff continues to be
unable to determine significance with
regards to climate change impacts.
The final EIS incorporates the above
referenced EA, which addressed the
potential environmental effects of the
construction and operation of the
following Project facilities:
• 8.1 miles of 30-inch-diameter
pipeline lateral within Barataria Bay in
Jefferson and Plaquemines Parish,
Louisiana;
• Centerville Compressor Station—a
new 23,470-horsepower (hp)
compressor station at an abandoned
Columbia Gulf compressor station site
in St. Mary Parish, Louisiana;
• Golden Meadow Compressor
Station—a new 23,470-hp compressor
station adjacent to an existing tie-in
facility in Lafourche Parish, Louisiana;
• a point of delivery meter station in
Plaquemines Parish, Louisiana; and
• a tie-in facility with two mainline
valves and other appurtenances on a
new platform in Barataria Bay, Jefferson
Parish, Louisiana.
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Proposed East Lateral Xpress Project to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
1 The Project’s EA is available on eLibrary under
accession no. 20210316–3010 and the draft EIS is
available under accession no. 20210625–3010.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 86, Number 185 (Tuesday, September 28, 2021)]
[Notices]
[Pages 53649-53650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-21015]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15021-000]
Bard College, New York; Notice of Intent To Prepare an
Environmental Assessment
On December 23, 2019, Bard College, New York filed an application
for an exemption from licensing for the 10-kilowatt Annandale Micro
Hydropower Project (Annandale Project) (FERC No. 15021). The Annandale
Project is located on the Saw Kill, a tributary of the Hudson River, in
the Town of Red Hook, Dutchess County, New York. The project does not
occupy federal land.
In accordance with the Commission's regulations, on July 9, 2021,
Commission staff issued a notice that the project was ready for
environmental analysis (REA notice). Based on the information in the
record, including comments filed on the REA notice, staff does not
anticipate that licensing the project would constitute a major federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare an Environmental Assessment (EA) on
the application to exempt the Annandale Project from licensing.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's decision on whether to issue an
exemption from licensing for the project.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA.................... January 2022.\1\
[[Page 53650]]
Comments on EA.......................... February 2022.
------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations under 40
CFR 1501.10(b)(1) require that EAs be completed within 1 year of the
federal action agency's decision to prepare an EA. This notice
establishes the Commission's intent to prepare an EA for the Annandale
Project. Therefore, in accordance with CEQ's regulations, the EA must
be issued within 1 year of the issuance date of this notice.
Any questions regarding this notice may be directed to Monir
Chowdhury at (202) 502-6736 or [email protected] or Laurie Bauer
at (202) 502-6519 or Laurie [email protected].
Dated: September 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21015 Filed 9-27-21; 8:45 am]
BILLING CODE 6717-01-P