Rover Pipeline, LLC; Notice of Applications and Establishing Intervention Deadline, 53050-53052 [2021-20772]
Download as PDF
53050
Federal Register / Vol. 86, No. 183 / Friday, September 24, 2021 / Notices
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is November
19, 2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is November 19,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
VerDate Sep<11>2014
16:50 Sep 23, 2021
Jkt 253001
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before November
19, 2021. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How to File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–493–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below.7 Your submission must reference
the Project docket number CP21–493–
000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of submissions (option
6 Additionally,
you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
7 Hand-delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: 700 Louisisana Street, Suite
300, Houston, Texas, 77002–2700 at
(832) 320–5477 or email (with a link to
the document) at: David_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: September 20, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–20773 Filed 9–23–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP21–492–000]
Rover Pipeline, LLC; Notice of
Applications and Establishing
Intervention Deadline
Take notice that on September 9,
2021, Rover Pipeline LLC (Rover), 1300
Main Street, Houston, Texas 77002,
filed an application pursuant to section
7(c) of the Natural Gas Act (NGA), in
Docket No. CP21–492–000, for
authorization to construct and operate
construct facilities associated with, and
to own, and operate a receipt
interconnection and a delivery
E:\FR\FM\24SEN1.SGM
24SEN1
Federal Register / Vol. 86, No. 183 / Friday, September 24, 2021 / Notices
interconnection on Rover’s Mainline in
Lenawee County, Michigan (‘‘Rover—
Brightmark Receipt and Delivery Meter
Station Project’’, or ‘‘Interconnection
Project’’ or ‘‘Project’’). The new
construction of the interconnection will
receive up to 1,600 dekatherms per day
from Brightmark to Rover while the
delivery interconnection will deliver up
to 100 dekatherms per day from Rover
to Brightmark. Rover estimates the cost
of the project to be $1,662,811 all as
more fully set forth in the request which
is on file with the Commission and open
to public inspection with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding Rover’s
application may be directed to Blair
Lichtenwalter, Senior Director,
Regulatory Affairs, Rover Pipeline LLC,
1300 Main Street, Houston, Texas
77002, by telephone at (713) 989–2605
or by email at Blair.Lichtenwalter@
energytransfer.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 12, 2021. How
to file comments and motions to
intervene is explained below.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before October 12,
2021. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,2 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 3 and the regulations under
the NGA 4 by the intervention deadline
2 18
CFR 385.102(d).
CFR 385.214.
4 18 CFR 157.10.
3 18
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
16:50 Sep 23, 2021
Jkt 253001
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
53051
for the project, which is October 12,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
How To File Comments and
Interventions
There are two ways to submit your
comments and motions to intervene to
the Commission. In all instances, please
reference the Project docket numbers
CP21–492–000 in your submission. The
Commission encourages electronic filing
of submissions.
(1) You may file your comments or
motions to intervene electronically by
using the eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Comment on a Filing’’ or
‘‘Intervention’’; or
(2) You can file a paper copy of your
comments by mailing them to the
following address below. Your written
comments must reference the Project
docket numbers (CP21–492–000).
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\24SEN1.SGM
24SEN1
53052
Federal Register / Vol. 86, No. 183 / Friday, September 24, 2021 / Notices
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
Motions to intervene must be served
on the applicants either by mail or email
(with a link to the document) at: Rover
Pipeline LLC, 1300 Main Street,
Houston, Texas 77002 or at
Blair.Lichtenwalter@energytransfer.com.
Any subsequent submissions by an
intervenor must be served on the
applicants and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 5 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).6 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.7
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the
projects will be available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link as described above. The
eLibrary link also provides access to the
texts of all formal documents issued by
the Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on October 12, 2021.
5 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
6 18 CFR 385.214(c)(1).
7 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
16:50 Sep 23, 2021
Jkt 253001
Dated: September 20, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
Dated: September 20, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–20772 Filed 9–23–21; 8:45 am]
[FR Doc. 2021–20770 Filed 9–23–21; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
Combined Notice of Filings #1
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–110–002.
Applicants: Fortis Inc., Finn
Investment Pte. Ltd., FortisUS Inc., ITC
Investment Holdings Inc., Element
Acquisition Sub Inc., Enterprise
Holdings Pte. Ltd., ITC Holdings Corp.
Description: Informational Report of
ITC Holdings Corp.
Filed Date: 9/15/21.
Accession Number: 20210915–5202.
Comment Date: 5 pm ET 10/6/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–256–000.
Applicants: AP Solar 2, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of AP Solar 2, LLC.
Filed Date: 9/20/21.
Accession Number: 20210920–5015.
Comment Date: 5 pm ET 10/12/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2497–010.
Applicants: Lawrenceburg Power,
LLC.
Description: Compliance filing:
Lawrenceburg Reactive Supply
Settlement Compliance to be effective
12/1/2018.
Filed Date: 9/20/21.
Accession Number: 20210920–5116.
Comment Date: 5 pm ET 10/12/21.
Docket Numbers: ER21–2282–001.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: Tariff Amendment: PPL
Electric Utilities Corporation submits
tariff filing per 35.17(b): PJM
Transmission Owners’ Response to
FERC Staff’s Deficiency Letter to be
effective 8/30/2021.
Filed Date: 9/20/21.
Accession Number: 20210920–5076.
Comment Date: 5 pm ET 10/12/21.
Docket Numbers: ER21–2903–000.
Applicants: PJM Interconnection,
L.L.C.
Filings Instituting Proceedings
Docket Numbers: RP21–1124–000.
Applicants: Texas Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Enhanced Parking Service Clarification
to be effective 10/18/2021.
Filed Date: 9/17/21.
Accession Number: 20210917–5019.
Comment Date: 5 pm ET 9/29/21.
Docket Numbers: RP21–1125–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt
(Colorado Bend 46260 eff 9–17–21) to be
effective 9/17/2021.
Filed Date: 9/17/21.
Accession Number: 20210917–5020.
Comment Date: 5 pm ET 9/29/21.
Docket Numbers: RP21–1126–000.
Applicants: Portland Natural Gas
Transmission System.
Description: Compliance filing: WXP
Phases II & III Compliance Filing to be
effective 11/1/2021.
Filed Date: 9/17/21.
Accession Number: 20210917–5073.
Comment Date: 5 pm ET 9/29/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 86, Number 183 (Friday, September 24, 2021)]
[Notices]
[Pages 53050-53052]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20772]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP21-492-000]
Rover Pipeline, LLC; Notice of Applications and Establishing
Intervention Deadline
Take notice that on September 9, 2021, Rover Pipeline LLC (Rover),
1300 Main Street, Houston, Texas 77002, filed an application pursuant
to section 7(c) of the Natural Gas Act (NGA), in Docket No. CP21-492-
000, for authorization to construct and operate construct facilities
associated with, and to own, and operate a receipt interconnection and
a delivery
[[Page 53051]]
interconnection on Rover's Mainline in Lenawee County, Michigan
(``Rover--Brightmark Receipt and Delivery Meter Station Project'', or
``Interconnection Project'' or ``Project''). The new construction of
the interconnection will receive up to 1,600 dekatherms per day from
Brightmark to Rover while the delivery interconnection will deliver up
to 100 dekatherms per day from Rover to Brightmark. Rover estimates the
cost of the project to be $1,662,811 all as more fully set forth in the
request which is on file with the Commission and open to public
inspection with the Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding Rover's application may be directed to
Blair Lichtenwalter, Senior Director, Regulatory Affairs, Rover
Pipeline LLC, 1300 Main Street, Houston, Texas 77002, by telephone at
(713) 989-2605 or by email at [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on October 12, 2021.
How to file comments and motions to intervene is explained below.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before October 12, 2021. However, the filing of a comment alone
will not serve to make the filer a party to the proceeding. To become a
party, you must intervene in the proceeding.
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\2\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \3\ and the regulations under the NGA \4\ by the
intervention deadline for the project, which is October 12, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. [For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene.] For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\3\ 18 CFR 385.214.
\4\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
How To File Comments and Interventions
There are two ways to submit your comments and motions to intervene
to the Commission. In all instances, please reference the Project
docket numbers CP21-492-000 in your submission. The Commission
encourages electronic filing of submissions.
(1) You may file your comments or motions to intervene
electronically by using the eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Comment on a
Filing'' or ``Intervention''; or
(2) You can file a paper copy of your comments by mailing them to
the following address below. Your written comments must reference the
Project docket numbers (CP21-492-000).
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory
[[Page 53052]]
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852
Motions to intervene must be served on the applicants either by
mail or email (with a link to the document) at: Rover Pipeline LLC,
1300 Main Street, Houston, Texas 77002 or at
[email protected]. Any subsequent submissions by
an intervenor must be served on the applicants and all other parties to
the proceeding. Contact information for parties can be downloaded from
the service list at the eService link on FERC Online. Service can be
via email with a link to the document.
All timely, unopposed \5\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\6\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\7\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\5\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\6\ 18 CFR 385.214(c)(1).
\7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the
projects will be available from the Commission's Office of External
Affairs, at (866) 208-FERC, or on the FERC website at www.ferc.gov
using the ``eLibrary'' link as described above. The eLibrary link also
provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on October 12, 2021.
Dated: September 20, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-20772 Filed 9-23-21; 8:45 am]
BILLING CODE 6717-01-P