Federal Register / Vol. 86, No. 179 / Monday, September 20, 2021 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 6115–016]
[Docket No. AD21–8–000]
Technical Conference on
Reassessment of the Electric Quarterly
Report Requirements; Supplemental
Notice of Technical Conference
On August 12, 2021, the Federal
Energy Regulatory Commission
(Commission) issued a notice that its
staff will hold a technical conference
related to the reassessment of the
Electric Quarterly Report (EQR)
requirements on October 14, 2021. The
technical conference will take place
from 10:00 a.m. to 12:30 p.m. Eastern
Time. All interested persons are invited
to participate. Access to the meeting
will be available via WebEx.
Commission staff is hereby
supplementing the August 12, 2021
notice with the agenda, including
sample discussion topics. During the
conference, Commission staff, EQR
filers, and EQR users will discuss
potential changes to the current EQR
data fields. This technical conference is
the third in a series of conferences
related to the reassessment of the EQR
requirements.
Information for the technical
conference, including a link to the
webcast, will be posted prior to the
event on the meeting event page on the
Commission’s website, available at:
https://www.ferc.gov/news-events/
events/technical-conferencereassessment-electric-quarterly-reportrequirements-0. The presentation slides
will be posted to the website prior to the
conference. Any interested person that
wishes to participate in the conference
is required to register through the
WebEx link.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–1659 (TTY).
For more information about the
technical conference, please contact Jeff
Sanders of the Commission’s Office of
Enforcement at (202) 502–6455, or send
an email to EQR@ferc.gov.
Dated: September 14, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–20270 Filed 9–17–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:49 Sep 17, 2021
Jkt 253001
Pyrites Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 6115–016.
c. Date Filed: August 31, 2021.
d. Applicant: Pyrites Hydro, LLC.
e. Name of Project: Pyrites
Hydroelectric Project (Pyrites Project).
f. Location: The existing project is
located on the Grass River near the
Town of Canton, St. Lawrence County,
New York. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825 (r).
h. Applicant Contact: Mr. Kevin M.
Webb, Hydro Licensing Manager,
Pyrites Hydro, LLC, 670 N. Commercial
Street, Suite 204, Manchester, NH
03101, (978) 935–6039; email—kwebb@
centralriverspower.com.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
52141
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 30, 2021.1
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Pyrites Hydroelectric Project (P–6115–
016).
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The existing
Pyrites Project consists of: (1) A 170foot-long and 12-foot-high concrete
Ambursen overflow spillway with 1.5foot-high flashboards, a 115-foot-long
concrete auxiliary spillway, and a 208foot-long non-overflow dam, which
includes a 50-foot-wide intake structure;
(2) a 6-foot-diameter, 700-foot-long steel
penstock running from the intake
structure to an upper powerhouse and a
10-foot-diameter, 2,160-foot-long
penstock running from the intake
structure to a lower powerhouse; (3) a
21-foot by 31-foot upper powerhouse
located 700 feet downstream of the
intake structure containing one 1.2megawatt (MW) turbine/generator unit
operating under a rated head of 76 feet
and a 50-foot by 53-foot lower
powerhouse located 1,200 feet
downstream of the tailrace containing
two 3.5-MW turbine/generator units
operating under a rated head of 111 feet;
(4) a 50-foot by 97-foot 115/4.16/2.3kilovolt (kV) switchyard and substation
for use by both powerhouses; (5) a 470foot-long 2.3-kV transmission line
connecting the upper powerhouse to the
1 The Commission’s Rules of Practice and
Procedure provide that if a filing deadline falls on
a Saturday, Sunday, holiday, or other day when the
Commission is closed for business, the filing
deadline does not end until the close of business
on the next business day. 18 CFR 385.2007(a)(2)
(2020). Because the 60-day filing deadline falls on
a Saturday (i.e., October 30, 2021), the filing
deadline is extended until the close of business on
Monday, November 1, 2021.
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 86, Number 179 (Monday, September 20, 2021)]
[Notices]
[Page 52141]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20270]
[[Page 52141]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD21-8-000]
Technical Conference on Reassessment of the Electric Quarterly
Report Requirements; Supplemental Notice of Technical Conference
On August 12, 2021, the Federal Energy Regulatory Commission
(Commission) issued a notice that its staff will hold a technical
conference related to the reassessment of the Electric Quarterly Report
(EQR) requirements on October 14, 2021. The technical conference will
take place from 10:00 a.m. to 12:30 p.m. Eastern Time. All interested
persons are invited to participate. Access to the meeting will be
available via WebEx.
Commission staff is hereby supplementing the August 12, 2021 notice
with the agenda, including sample discussion topics. During the
conference, Commission staff, EQR filers, and EQR users will discuss
potential changes to the current EQR data fields. This technical
conference is the third in a series of conferences related to the
reassessment of the EQR requirements.
Information for the technical conference, including a link to the
webcast, will be posted prior to the event on the meeting event page on
the Commission's website, available at: https://www.ferc.gov/news-events/events/technical-conference-reassessment-electric-quarterly-report-requirements-0. The presentation slides will be posted to the
website prior to the conference. Any interested person that wishes to
participate in the conference is required to register through the WebEx
link.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected] or call toll free 1-866-208-
3372 (voice) or 202-208-1659 (TTY).
For more information about the technical conference, please contact
Jeff Sanders of the Commission's Office of Enforcement at (202) 502-
6455, or send an email to [email protected].
Dated: September 14, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-20270 Filed 9-17-21; 8:45 am]