Combined Notice of Filings #1, 51661-51662 [2021-20027]
Download as PDF
Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–132–000.
Applicants: Minco Wind Energy III,
LLC, Minco Wind III, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Minco Wind III, et
al.
Filed Date: 9/10/21.
Accession Number: 20210910–5114.
Comment Date: 5 p.m. ET 10/1/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1119–006;
ER10–1123–008.
Applicants: Union Electric Company,
Central Illinois Public Service
Company.
Description: Notice of Non-Material
Change in Status of Ameren Illinois
Company, et al.
Filed Date: 9/10/21.
Accession Number: 20210910–5115.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2359–001.
Applicants: ITC Midwest LLC.
Description: Compliance filing:
Compliance Filing of Executed RS 79 to
be effective 9/5/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5047.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2860–000.
Applicants: The Connecticut Light
and Power Company.
Description: § 205(d) Rate Filing:
Termination of Sterling Property, LLC—
CL&P IA to be effective 11/8/2021.
Filed Date: 9/9/21.
Accession Number: 20210909–5142.
Comment Date: 5 p.m. ET 9/30/21.
Docket Numbers: ER21–2861–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA 6183; Queue No. AF1–
005 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5015.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2862–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6169; Queue No. AC2–195 to be
effective 8/11/2021.
Filed Date: 9/10/21.
VerDate Sep<11>2014
16:44 Sep 15, 2021
Jkt 253001
Accession Number: 20210910–5030.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2863–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA No. 6163; Queue No. AD1–
155 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5033.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2864–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
5756; Queue No. AC1–110 to be
effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5040.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2865–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6186; Queue No. AF1–003 to be
effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5051.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2866–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Visalia CSG LLC GIA and DSA—SA
Nos. 1155–1156 to be effective 9/11/
2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5073.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2867–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
887 to be effective 8/27/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5081.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2868–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Mojave 3/4/5 LLC,
Mojave 16/17/18, LLC—Mojave 89 SA
No. 239 to be effective 11/10/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5085.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2869–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Mojave 3/4/5 LLC—
Mojave 90 to be effective 11/10/2021.
Filed Date: 9/10/21.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
51661
Accession Number: 20210910–5088.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2870–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
PG&E Quail Energy SGIA (SA 496) to be
effective 11/9/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5092.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2871–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Pioneer Transmission LLC.
Description: Compliance filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35: 2021–09–10_Pioneer 864
Compliance Filing to be effective 1/27/
2020.
Filed Date: 9/10/21.
Accession Number: 20210910–5097.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2872–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Macon Parkway Solar Project Amended
and Restated LGIA Filing to be effective
8/31/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5102.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2873–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: TriState Solar Project Amended and
Restated LGIA Filing to be effective 8/
31/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5105.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2874–000.
Applicants: RE Tranquillity LLC.
Description: Initial rate filing:
Tranquillity Storage Shared Facilities
and Co-Tenancy Agreement Filing to be
effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5112.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2875–000.
Applicants: PacifiCorp.
Description: Tariff Amendment:
Termination of BPA Construction
Agmt—Conversion Ross-Lex-Swift to be
effective 11/29/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5113.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2876–000.
Applicants: SP Tranquillity Solar
Storage, LLC.
Description: Initial rate filing:
Tranquillity Storage Shared Facilities
E:\FR\FM\16SEN1.SGM
16SEN1
51662
Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices
and Co-Tenancy Agreement Filing to be
effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5121.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2877–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing and Request for
Waiver in ER21–2444, et al. to be
effective N/A.
Filed Date: 9/10/21.
Accession Number: 20210910–5161.
Comment Date: 5 p.m. ET 10/1/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–20027 Filed 9–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2897–052, 2931–044, 2932–
051, 2941–047, 2942–054, and 2984–123]
Sappi North America, Inc.,
Presumpscot Hydro LLC, Dichotomy
Power Maine LLC; Notice of Amended
Application for Transfer of License and
Lease of Project Lands Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Transfer of
License and Lease of Project Lands.
b. Project Nos.: 2897–052, 2931–044,
2932–051, 2941–047, 2942–054, and
2984–123.
VerDate Sep<11>2014
16:44 Sep 15, 2021
Jkt 253001
c. Date Filed: June 21, 2021.
d. Applicants: Sappi North America,
Inc. (transferor), Presumpscot Hydro
LLC (co-transferee), Dichotomy Power
Maine LLC (co-transferee).
e. Name of Projects: Saccarappa,
Gambo, Mallison Falls, Little Falls,
Dundee, and Eel Weir.
f. Location: The Saccarappa, Gambo,
Mallison Falls, Little Falls, Dundee and
Eel Weir projects are located on the
Presumpscot River, in the Towns of
Gorham and South Windham and the
Westbrook and Standish cities in
Cumberland County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contacts:
For Transferor: Ms. Briana O’Regan,
Assistant General Counsel, Sappi North
America, Inc., 179 John Roberts Road,
South Portland, ME 04106, phone: (207)
854–7070, Email: briana.oregan@
sappi.com.
For Transferor and Co-Transferee: Mr.
Matthew D. Manahan, Counsel for Sappi
and Presumpscot Hydro, Pierce Atwood
LLP, 254 Commercial St., Portland, ME
04101, phone: (207) 791–1189, Email:
mmanahan@pierceatwood.com.
For Co-Transferee: Mr. Ian Clark,
CEO, Dichotomy Power LLC, 1 Pepsi
Way, Suite 6n74, Katonah, NY 10536,
phone: (914) 297–7645, Email: ianc@
dichotomycapital.com.
i. FERC Contact: Mrs. Anumzziatta
Purchiaroni, (202) 502–6191 or
Anumzziatta.purchiaroni@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
page of any filing should include docket
number P–2897–052, P–2931–044, P–
2932–051, P–2941–047, P–2942–054,
and P–2984–123. Comments emailed to
Commission staff are not considered
part of the Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a resource agency, they must also
serve a copy of the document on that
resource agency.
k. Description of Transfer and Lease
of Project Lands Request: In the original
application filed on October 20, 2020,
the applicants requested that the
Commission approve the transfer of the
following projects from Sappi North
America, Inc. (Sappi) to Presumpscot
Hydro LLC (Presumpscot) as the sole
transferee: Saccarappa Project No. 2897,
Gambo Project No. 2931, Mallison Falls
Project No. 2932, Little Falls Project No.
2941, Dundee Project No. 2942, and Eel
Weir Project No. 2984–123. The
Commission issued notice of the
application on January 26, 2021. On
June 21, 2021, the applicants submitted
an amendment to the original
application, to add Dichotomy Power
Maine LLC (Dichotomy) as a cotransferee. Presumpscot remains a cotransferee. Because the amendment
modifies the proposal in the original
application, the Commission is issuing
notice of the amended application.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 86, Number 177 (Thursday, September 16, 2021)]
[Notices]
[Pages 51661-51662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20027]
[[Page 51661]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-132-000.
Applicants: Minco Wind Energy III, LLC, Minco Wind III, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Minco Wind III, et al.
Filed Date: 9/10/21.
Accession Number: 20210910-5114.
Comment Date: 5 p.m. ET 10/1/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1119-006; ER10-1123-008.
Applicants: Union Electric Company, Central Illinois Public Service
Company.
Description: Notice of Non-Material Change in Status of Ameren
Illinois Company, et al.
Filed Date: 9/10/21.
Accession Number: 20210910-5115.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2359-001.
Applicants: ITC Midwest LLC.
Description: Compliance filing: Compliance Filing of Executed RS 79
to be effective 9/5/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5047.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2860-000.
Applicants: The Connecticut Light and Power Company.
Description: Sec. 205(d) Rate Filing: Termination of Sterling
Property, LLC--CL&P IA to be effective 11/8/2021.
Filed Date: 9/9/21.
Accession Number: 20210909-5142.
Comment Date: 5 p.m. ET 9/30/21.
Docket Numbers: ER21-2861-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA 6183; Queue
No. AF1-005 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5015.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2862-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 6169; Queue No. AC2-195 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5030.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2863-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA No. 6163; Queue
No. AD1-155 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5033.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2864-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, Service
Agreement No. 5756; Queue No. AC1-110 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5040.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2865-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, Service
Agreement No. 6186; Queue No. AF1-003 to be effective 8/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5051.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2866-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Visalia CSG LLC GIA and
DSA--SA Nos. 1155-1156 to be effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5073.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2867-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Service
Agreement No. 887 to be effective 8/27/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5081.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2868-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended LGIA Mojave 3/4/5
LLC, Mojave 16/17/18, LLC--Mojave 89 SA No. 239 to be effective 11/10/
2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5085.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2869-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended LGIA Mojave 3/4/5
LLC--Mojave 90 to be effective 11/10/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5088.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2870-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: PG&E Quail Energy SGIA (SA
496) to be effective 11/9/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5092.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2871-000.
Applicants: Midcontinent Independent System Operator, Inc., Pioneer
Transmission LLC.
Description: Compliance filing: Midcontinent Independent System
Operator, Inc. submits tariff filing per 35: 2021-09-10_Pioneer 864
Compliance Filing to be effective 1/27/2020.
Filed Date: 9/10/21.
Accession Number: 20210910-5097.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2872-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Macon Parkway Solar Project
Amended and Restated LGIA Filing to be effective 8/31/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5102.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2873-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Tri-State Solar Project
Amended and Restated LGIA Filing to be effective 8/31/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5105.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2874-000.
Applicants: RE Tranquillity LLC.
Description: Initial rate filing: Tranquillity Storage Shared
Facilities and Co-Tenancy Agreement Filing to be effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5112.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2875-000.
Applicants: PacifiCorp.
Description: Tariff Amendment: Termination of BPA Construction
Agmt--Conversion Ross-Lex-Swift to be effective 11/29/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5113.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2876-000.
Applicants: SP Tranquillity Solar Storage, LLC.
Description: Initial rate filing: Tranquillity Storage Shared
Facilities
[[Page 51662]]
and Co-Tenancy Agreement Filing to be effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910-5121.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21-2877-000.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing and Request for
Waiver in ER21-2444, et al. to be effective N/A.
Filed Date: 9/10/21.
Accession Number: 20210910-5161.
Comment Date: 5 p.m. ET 10/1/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-20027 Filed 9-15-21; 8:45 am]
BILLING CODE 6717-01-P