Download as PDF Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–132–000. Applicants: Minco Wind Energy III, LLC, Minco Wind III, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Minco Wind III, et al. Filed Date: 9/10/21. Accession Number: 20210910–5114. Comment Date: 5 p.m. ET 10/1/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1119–006; ER10–1123–008. Applicants: Union Electric Company, Central Illinois Public Service Company. Description: Notice of Non-Material Change in Status of Ameren Illinois Company, et al. Filed Date: 9/10/21. Accession Number: 20210910–5115. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2359–001. Applicants: ITC Midwest LLC. Description: Compliance filing: Compliance Filing of Executed RS 79 to be effective 9/5/2021. Filed Date: 9/10/21. Accession Number: 20210910–5047. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2860–000. Applicants: The Connecticut Light and Power Company. Description: § 205(d) Rate Filing: Termination of Sterling Property, LLC— CL&P IA to be effective 11/8/2021. Filed Date: 9/9/21. Accession Number: 20210909–5142. Comment Date: 5 p.m. ET 9/30/21. Docket Numbers: ER21–2861–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA 6183; Queue No. AF1– 005 to be effective 8/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5015. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2862–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6169; Queue No. AC2–195 to be effective 8/11/2021. Filed Date: 9/10/21. VerDate Sep<11>2014 16:44 Sep 15, 2021 Jkt 253001 Accession Number: 20210910–5030. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2863–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA No. 6163; Queue No. AD1– 155 to be effective 8/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5033. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2864–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, Service Agreement No. 5756; Queue No. AC1–110 to be effective 8/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5040. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2865–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement No. 6186; Queue No. AF1–003 to be effective 8/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5051. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2866–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Visalia CSG LLC GIA and DSA—SA Nos. 1155–1156 to be effective 9/11/ 2021. Filed Date: 9/10/21. Accession Number: 20210910–5073. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2867–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Service Agreement No. 887 to be effective 8/27/2021. Filed Date: 9/10/21. Accession Number: 20210910–5081. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2868–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended LGIA Mojave 3/4/5 LLC, Mojave 16/17/18, LLC—Mojave 89 SA No. 239 to be effective 11/10/2021. Filed Date: 9/10/21. Accession Number: 20210910–5085. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2869–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended LGIA Mojave 3/4/5 LLC— Mojave 90 to be effective 11/10/2021. Filed Date: 9/10/21. PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 51661 Accession Number: 20210910–5088. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2870–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: PG&E Quail Energy SGIA (SA 496) to be effective 11/9/2021. Filed Date: 9/10/21. Accession Number: 20210910–5092. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2871–000. Applicants: Midcontinent Independent System Operator, Inc., Pioneer Transmission LLC. Description: Compliance filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35: 2021–09–10_Pioneer 864 Compliance Filing to be effective 1/27/ 2020. Filed Date: 9/10/21. Accession Number: 20210910–5097. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2872–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Macon Parkway Solar Project Amended and Restated LGIA Filing to be effective 8/31/2021. Filed Date: 9/10/21. Accession Number: 20210910–5102. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2873–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: TriState Solar Project Amended and Restated LGIA Filing to be effective 8/ 31/2021. Filed Date: 9/10/21. Accession Number: 20210910–5105. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2874–000. Applicants: RE Tranquillity LLC. Description: Initial rate filing: Tranquillity Storage Shared Facilities and Co-Tenancy Agreement Filing to be effective 9/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5112. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2875–000. Applicants: PacifiCorp. Description: Tariff Amendment: Termination of BPA Construction Agmt—Conversion Ross-Lex-Swift to be effective 11/29/2021. Filed Date: 9/10/21. Accession Number: 20210910–5113. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2876–000. Applicants: SP Tranquillity Solar Storage, LLC. Description: Initial rate filing: Tranquillity Storage Shared Facilities E:\FR\FM\16SEN1.SGM 16SEN1 51662 Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices and Co-Tenancy Agreement Filing to be effective 9/11/2021. Filed Date: 9/10/21. Accession Number: 20210910–5121. Comment Date: 5 p.m. ET 10/1/21. Docket Numbers: ER21–2877–000. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing and Request for Waiver in ER21–2444, et al. to be effective N/A. Filed Date: 9/10/21. Accession Number: 20210910–5161. Comment Date: 5 p.m. ET 10/1/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 10, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–20027 Filed 9–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2897–052, 2931–044, 2932– 051, 2941–047, 2942–054, and 2984–123] Sappi North America, Inc., Presumpscot Hydro LLC, Dichotomy Power Maine LLC; Notice of Amended Application for Transfer of License and Lease of Project Lands Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Transfer of License and Lease of Project Lands. b. Project Nos.: 2897–052, 2931–044, 2932–051, 2941–047, 2942–054, and 2984–123. VerDate Sep<11>2014 16:44 Sep 15, 2021 Jkt 253001 c. Date Filed: June 21, 2021. d. Applicants: Sappi North America, Inc. (transferor), Presumpscot Hydro LLC (co-transferee), Dichotomy Power Maine LLC (co-transferee). e. Name of Projects: Saccarappa, Gambo, Mallison Falls, Little Falls, Dundee, and Eel Weir. f. Location: The Saccarappa, Gambo, Mallison Falls, Little Falls, Dundee and Eel Weir projects are located on the Presumpscot River, in the Towns of Gorham and South Windham and the Westbrook and Standish cities in Cumberland County, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contacts: For Transferor: Ms. Briana O’Regan, Assistant General Counsel, Sappi North America, Inc., 179 John Roberts Road, South Portland, ME 04106, phone: (207) 854–7070, Email: briana.oregan@ sappi.com. For Transferor and Co-Transferee: Mr. Matthew D. Manahan, Counsel for Sappi and Presumpscot Hydro, Pierce Atwood LLP, 254 Commercial St., Portland, ME 04101, phone: (207) 791–1189, Email: mmanahan@pierceatwood.com. For Co-Transferee: Mr. Ian Clark, CEO, Dichotomy Power LLC, 1 Pepsi Way, Suite 6n74, Katonah, NY 10536, phone: (914) 297–7645, Email: ianc@ dichotomycapital.com. i. FERC Contact: Mrs. Anumzziatta Purchiaroni, (202) 502–6191 or Anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 page of any filing should include docket number P–2897–052, P–2931–044, P– 2932–051, P–2941–047, P–2942–054, and P–2984–123. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a resource agency, they must also serve a copy of the document on that resource agency. k. Description of Transfer and Lease of Project Lands Request: In the original application filed on October 20, 2020, the applicants requested that the Commission approve the transfer of the following projects from Sappi North America, Inc. (Sappi) to Presumpscot Hydro LLC (Presumpscot) as the sole transferee: Saccarappa Project No. 2897, Gambo Project No. 2931, Mallison Falls Project No. 2932, Little Falls Project No. 2941, Dundee Project No. 2942, and Eel Weir Project No. 2984–123. The Commission issued notice of the application on January 26, 2021. On June 21, 2021, the applicants submitted an amendment to the original application, to add Dichotomy Power Maine LLC (Dichotomy) as a cotransferee. Presumpscot remains a cotransferee. Because the amendment modifies the proposal in the original application, the Commission is issuing notice of the amended application. l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (866) 208–3676 or TTY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. E:\FR\FM\16SEN1.SGM 16SEN1

Agencies

[Federal Register Volume 86, Number 177 (Thursday, September 16, 2021)]
[Notices]
[Pages 51661-51662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20027]



[[Page 51661]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC21-132-000.
    Applicants: Minco Wind Energy III, LLC, Minco Wind III, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Minco Wind III, et al.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5114.
    Comment Date: 5 p.m. ET 10/1/21.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1119-006; ER10-1123-008.
    Applicants: Union Electric Company, Central Illinois Public Service 
Company.
    Description: Notice of Non-Material Change in Status of Ameren 
Illinois Company, et al.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5115.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2359-001.
    Applicants: ITC Midwest LLC.
    Description: Compliance filing: Compliance Filing of Executed RS 79 
to be effective 9/5/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5047.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2860-000.
    Applicants: The Connecticut Light and Power Company.
    Description: Sec.  205(d) Rate Filing: Termination of Sterling 
Property, LLC--CL&P IA to be effective 11/8/2021.
    Filed Date: 9/9/21.
    Accession Number: 20210909-5142.
    Comment Date: 5 p.m. ET 9/30/21.

    Docket Numbers: ER21-2861-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA 6183; Queue 
No. AF1-005 to be effective 8/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5015.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2862-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6169; Queue No. AC2-195 to be effective 8/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5030.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2863-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA No. 6163; Queue 
No. AD1-155 to be effective 8/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5033.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2864-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: First Revised ISA, Service 
Agreement No. 5756; Queue No. AC1-110 to be effective 8/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5040.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2865-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA, Service 
Agreement No. 6186; Queue No. AF1-003 to be effective 8/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5051.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2866-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Visalia CSG LLC GIA and 
DSA--SA Nos. 1155-1156 to be effective 9/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5073.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2867-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment to Service 
Agreement No. 887 to be effective 8/27/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5081.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2868-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Amended LGIA Mojave 3/4/5 
LLC, Mojave 16/17/18, LLC--Mojave 89 SA No. 239 to be effective 11/10/
2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5085.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2869-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Amended LGIA Mojave 3/4/5 
LLC--Mojave 90 to be effective 11/10/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5088.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2870-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: PG&E Quail Energy SGIA (SA 
496) to be effective 11/9/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5092.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2871-000.
    Applicants: Midcontinent Independent System Operator, Inc., Pioneer 
Transmission LLC.
    Description: Compliance filing: Midcontinent Independent System 
Operator, Inc. submits tariff filing per 35: 2021-09-10_Pioneer 864 
Compliance Filing to be effective 1/27/2020.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5097.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2872-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Macon Parkway Solar Project 
Amended and Restated LGIA Filing to be effective 8/31/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5102.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2873-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Tri-State Solar Project 
Amended and Restated LGIA Filing to be effective 8/31/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5105.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2874-000.
    Applicants: RE Tranquillity LLC.
    Description: Initial rate filing: Tranquillity Storage Shared 
Facilities and Co-Tenancy Agreement Filing to be effective 9/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5112.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2875-000.
    Applicants: PacifiCorp.
    Description: Tariff Amendment: Termination of BPA Construction 
Agmt--Conversion Ross-Lex-Swift to be effective 11/29/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5113.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2876-000.
    Applicants: SP Tranquillity Solar Storage, LLC.
    Description: Initial rate filing: Tranquillity Storage Shared 
Facilities

[[Page 51662]]

and Co-Tenancy Agreement Filing to be effective 9/11/2021.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5121.
    Comment Date: 5 p.m. ET 10/1/21.

    Docket Numbers: ER21-2877-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance Filing and Request for 
Waiver in ER21-2444, et al. to be effective N/A.
    Filed Date: 9/10/21.
    Accession Number: 20210910-5161.
    Comment Date: 5 p.m. ET 10/1/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-20027 Filed 9-15-21; 8:45 am]