Adelphia Gateway, LLC; Notice of Revised Schedule for Environmental Review of the Marcus Hook Electric Compression Project, 51665 [2021-20002]
Download as PDF
Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices
abutment that is equipped with a
headgate and trashrack with 2-inch clear
bar spacing; (4) a 26-foot-long, 22-footwide wood and steel powerhouse
containing one 265-kilowatt vertical
Flygt submersible turbine-generator
unit; (5) a 400-foot-long, 20-foot-wide
tailrace that discharges into the Cocheco
River; (6) a generator lead, transformer,
and transmission line that connect the
project to the local utility distribution
system; and (7) appurtenant facilities.
Watson Associates voluntarily
operates the project in a run-of-river
mode using an automatic pond level
control system to regulate turbine
operation, such that outflow from the
project approximates inflow. The
project creates an approximately 250foot-long and a 400-foot-long bifurcated
bypassed reaches of the Cocheco River.
Downstream fish passage is provided
by a bypass pipe located on the left side
of the dam. There is no upstream fish
passage facility at the project.
The current license requires a
minimum flow release of 83 cubic feet
per second (cfs), or inflow to the
impoundment, whichever is less from
the dam to protect and enhance aquatic
resources in the Cocheco River. The
average annual generation of the project
is approximately 1,100 megawatt-hours.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–6240).
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)
October 2021
Request Additional Information
October 2021
Issue Scoping Document 1 for
comments January 2022
VerDate Sep<11>2014
16:44 Sep 15, 2021
Jkt 253001
Issue Acceptance Letter February 2022
Request Additional Information (if
necessary) February 2022
Issue Scoping Document 2 March 2022
Issue Notice of Ready for Environmental
Analysis March 2022
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: September 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–20003 Filed 9–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–14–000]
Adelphia Gateway, LLC; Notice of
Revised Schedule for Environmental
Review of the Marcus Hook Electric
Compression Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental impact statement
(EIS) for Adelphia Gateway, LLC’s
Marcus Hook Electric Compression
Project. The Notice of Intent to Prepare
an Environmental Impact Statement for
the Proposed Marcus Hook Electric
Compression Project and Schedule for
Environmental Review, issued on May
27, 2021, identified September 10, 2021
as the final EIS issuance date. However,
we are modifying this issuance date
based on comments received on the
draft EIS and based on Adelphia
Gateway, LLC’s supplemental
information filed on August 25, 2021 to
address comments.
Schedule for Environmental Review
Issuance of the final EIS—October 1,
2021
90-day Federal Authorization Decision
Deadline—December 30, 2021
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
51665
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ (i.e., CP21–14), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings. This notice is issued and
published in accordance with 18 CFR
2.1.
Dated: September 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–20002 Filed 9–15–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2020–0005; FRL–7611–02–
OW]
Final National Pollutant Discharge
Elimination System (NPDES) Pesticide
General Permit for Point Source
Discharges From the Application of
Pesticides; Reissuance
Environmental Protection
Agency (EPA).
ACTION: Notice of final permit issuance.
AGENCY:
This notice announces
issuance by all 10 Environmental
Protection Agency (EPA) Regions of the
final 2021 National Pollutant Discharge
Elimination System (NPDES) pesticide
general permit (PGP)—the 2021 PGP.
The 2021 PGP, which has an effective
date of October 31, 2021, replaces the
existing permit (2016 PGP) that expires
at midnight on October 31, 2021, and
authorizes certain point source
discharges from the application of
pesticides to waters of the United States
in accordance with the terms and
conditions described therein. EPA is
issuing this permit for five (5) years in
all areas of the country where EPA is the
NPDES permitting authority.
DATES: The permit becomes effective on
October 31, 2021, and will expire at
SUMMARY:
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 86, Number 177 (Thursday, September 16, 2021)]
[Notices]
[Page 51665]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20002]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-14-000]
Adelphia Gateway, LLC; Notice of Revised Schedule for
Environmental Review of the Marcus Hook Electric Compression Project
This notice identifies the Federal Energy Regulatory Commission
staff's revised schedule for the completion of the environmental impact
statement (EIS) for Adelphia Gateway, LLC's Marcus Hook Electric
Compression Project. The Notice of Intent to Prepare an Environmental
Impact Statement for the Proposed Marcus Hook Electric Compression
Project and Schedule for Environmental Review, issued on May 27, 2021,
identified September 10, 2021 as the final EIS issuance date. However,
we are modifying this issuance date based on comments received on the
draft EIS and based on Adelphia Gateway, LLC's supplemental information
filed on August 25, 2021 to address comments.
Schedule for Environmental Review
Issuance of the final EIS--October 1, 2021
90-day Federal Authorization Decision Deadline--December 30, 2021
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' (i.e., CP21-14), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings. This notice is
issued and published in accordance with 18 CFR 2.1.
Dated: September 10, 2021.
Kimberly D. Bose,
Secretary.