Sappi North America, Inc., Presumpscot Hydro LLC, Dichotomy Power Maine LLC; Notice of Amended Application for Transfer of License and Lease of Project Lands Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 51662-51663 [2021-20001]
Download as PDF
51662
Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices
and Co-Tenancy Agreement Filing to be
effective 9/11/2021.
Filed Date: 9/10/21.
Accession Number: 20210910–5121.
Comment Date: 5 p.m. ET 10/1/21.
Docket Numbers: ER21–2877–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing and Request for
Waiver in ER21–2444, et al. to be
effective N/A.
Filed Date: 9/10/21.
Accession Number: 20210910–5161.
Comment Date: 5 p.m. ET 10/1/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–20027 Filed 9–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2897–052, 2931–044, 2932–
051, 2941–047, 2942–054, and 2984–123]
Sappi North America, Inc.,
Presumpscot Hydro LLC, Dichotomy
Power Maine LLC; Notice of Amended
Application for Transfer of License and
Lease of Project Lands Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Transfer of
License and Lease of Project Lands.
b. Project Nos.: 2897–052, 2931–044,
2932–051, 2941–047, 2942–054, and
2984–123.
VerDate Sep<11>2014
16:44 Sep 15, 2021
Jkt 253001
c. Date Filed: June 21, 2021.
d. Applicants: Sappi North America,
Inc. (transferor), Presumpscot Hydro
LLC (co-transferee), Dichotomy Power
Maine LLC (co-transferee).
e. Name of Projects: Saccarappa,
Gambo, Mallison Falls, Little Falls,
Dundee, and Eel Weir.
f. Location: The Saccarappa, Gambo,
Mallison Falls, Little Falls, Dundee and
Eel Weir projects are located on the
Presumpscot River, in the Towns of
Gorham and South Windham and the
Westbrook and Standish cities in
Cumberland County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contacts:
For Transferor: Ms. Briana O’Regan,
Assistant General Counsel, Sappi North
America, Inc., 179 John Roberts Road,
South Portland, ME 04106, phone: (207)
854–7070, Email: briana.oregan@
sappi.com.
For Transferor and Co-Transferee: Mr.
Matthew D. Manahan, Counsel for Sappi
and Presumpscot Hydro, Pierce Atwood
LLP, 254 Commercial St., Portland, ME
04101, phone: (207) 791–1189, Email:
mmanahan@pierceatwood.com.
For Co-Transferee: Mr. Ian Clark,
CEO, Dichotomy Power LLC, 1 Pepsi
Way, Suite 6n74, Katonah, NY 10536,
phone: (914) 297–7645, Email: ianc@
dichotomycapital.com.
i. FERC Contact: Mrs. Anumzziatta
Purchiaroni, (202) 502–6191 or
Anumzziatta.purchiaroni@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
page of any filing should include docket
number P–2897–052, P–2931–044, P–
2932–051, P–2941–047, P–2942–054,
and P–2984–123. Comments emailed to
Commission staff are not considered
part of the Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a resource agency, they must also
serve a copy of the document on that
resource agency.
k. Description of Transfer and Lease
of Project Lands Request: In the original
application filed on October 20, 2020,
the applicants requested that the
Commission approve the transfer of the
following projects from Sappi North
America, Inc. (Sappi) to Presumpscot
Hydro LLC (Presumpscot) as the sole
transferee: Saccarappa Project No. 2897,
Gambo Project No. 2931, Mallison Falls
Project No. 2932, Little Falls Project No.
2941, Dundee Project No. 2942, and Eel
Weir Project No. 2984–123. The
Commission issued notice of the
application on January 26, 2021. On
June 21, 2021, the applicants submitted
an amendment to the original
application, to add Dichotomy Power
Maine LLC (Dichotomy) as a cotransferee. Presumpscot remains a cotransferee. Because the amendment
modifies the proposal in the original
application, the Commission is issuing
notice of the amended application.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
E:\FR\FM\16SEN1.SGM
16SEN1
Federal Register / Vol. 86, No. 177 / Thursday, September 16, 2021 / Notices
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number(s) of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: September 10, 2021.
Kimberly D. Bose,
Secretary.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Agreement Filing (SoCal) to
be effective 11/1/2021.
Filed Date: 9/9/21.
Accession Number: 20210909–5144.
Comment Date: 5 p.m. ET 9/21/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–20025 Filed 9–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2021–20001 Filed 9–15–21; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 9028–011]
Banister Hydro, Inc.; Notice of Intent
To File License Application, Filing of
Pre-Application Document, Approving
Use of the Traditional Licensing
Process
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP21–1106–000.
Applicants: Natural Gas Pipeline
Company of America LLC.
Description: § 4(d) Rate Filing:
Amendment to a Negotiated Rate
Agreement—Woodriver Energy LLC to
be effective 9/9/2021.
Filed Date: 9/9/21.
Accession Number: 20210909–5071.
Comment Date: 5 p.m. ET 9/21/21.
Docket Numbers: RP21–1107–000.
VerDate Sep<11>2014
16:44 Sep 15, 2021
Jkt 253001
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 9028–011.
c. Date Filed: July 28, 2021.
d. Submitted By: Banister Hydro, Inc.
(Banister Hydro).
e. Name of Project: Halifax
Hydroelectric Project.
f. Location: On the Banister River in
Halifax County, Virginia. The project
does not occupy any federal land.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Lewis C. Loon, General Manager,
Operations and Maintenance—USA, KEI
(USA) Power Management Inc., 423
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
51663
Brunswick Ave., Gardiner, ME 04345; at
(207) 203–3027 or email at lewis.loon@
kruger.com.
i. FERC Contact: Laurie Bauer at (202)
502–6519; or email at laurie.bauer@
ferc.gov.
j. Banister Hydro filed its request to
use the Traditional Licensing Process on
July 28, 2021. Banister Hydro provided
public notice of its request on July 28,
2021. In a letter dated September 10,
2021, the Director of the Division of
Hydropower Licensing approved
Banister Hydro’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402. We are also initiating
consultation with the Virginia State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Banister Hydro as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Banister Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866) 208
3676 (toll free), or (202) 502–8659
(TTY).
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 9028.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 86, Number 177 (Thursday, September 16, 2021)]
[Notices]
[Pages 51662-51663]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-20001]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2897-052, 2931-044, 2932-051, 2941-047, 2942-054, and
2984-123]
Sappi North America, Inc., Presumpscot Hydro LLC, Dichotomy Power
Maine LLC; Notice of Amended Application for Transfer of License and
Lease of Project Lands Accepted for Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Transfer of License and Lease of Project
Lands.
b. Project Nos.: 2897-052, 2931-044, 2932-051, 2941-047, 2942-054,
and 2984-123.
c. Date Filed: June 21, 2021.
d. Applicants: Sappi North America, Inc. (transferor), Presumpscot
Hydro LLC (co-transferee), Dichotomy Power Maine LLC (co-transferee).
e. Name of Projects: Saccarappa, Gambo, Mallison Falls, Little
Falls, Dundee, and Eel Weir.
f. Location: The Saccarappa, Gambo, Mallison Falls, Little Falls,
Dundee and Eel Weir projects are located on the Presumpscot River, in
the Towns of Gorham and South Windham and the Westbrook and Standish
cities in Cumberland County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contacts:
For Transferor: Ms. Briana O'Regan, Assistant General Counsel,
Sappi North America, Inc., 179 John Roberts Road, South Portland, ME
04106, phone: (207) 854-7070, Email: [email protected].
For Transferor and Co-Transferee: Mr. Matthew D. Manahan, Counsel
for Sappi and Presumpscot Hydro, Pierce Atwood LLP, 254 Commercial St.,
Portland, ME 04101, phone: (207) 791-1189, Email:
[email protected].
For Co-Transferee: Mr. Ian Clark, CEO, Dichotomy Power LLC, 1 Pepsi
Way, Suite 6n74, Katonah, NY 10536, phone: (914) 297-7645, Email:
[email protected].
i. FERC Contact: Mrs. Anumzziatta Purchiaroni, (202) 502-6191 or
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket number P-2897-052, P-2931-044, P-2932-051, P-2941-047,
P-2942-054, and P-2984-123. Comments emailed to Commission staff are
not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a resource agency, they must also serve a copy of
the document on that resource agency.
k. Description of Transfer and Lease of Project Lands Request: In
the original application filed on October 20, 2020, the applicants
requested that the Commission approve the transfer of the following
projects from Sappi North America, Inc. (Sappi) to Presumpscot Hydro
LLC (Presumpscot) as the sole transferee: Saccarappa Project No. 2897,
Gambo Project No. 2931, Mallison Falls Project No. 2932, Little Falls
Project No. 2941, Dundee Project No. 2942, and Eel Weir Project No.
2984-123. The Commission issued notice of the application on January
26, 2021. On June 21, 2021, the applicants submitted an amendment to
the original application, to add Dichotomy Power Maine LLC (Dichotomy)
as a co-transferee. Presumpscot remains a co-transferee. Because the
amendment modifies the proposal in the original application, the
Commission is issuing notice of the amended application.
l. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll free, (866) 208-3676 or TTY,
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
[[Page 51663]]
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number(s) of the application to which the
filing responds; (3) furnish the name, address, and telephone number of
the person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis. A
copy of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 385.2010.
Dated: September 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-20001 Filed 9-15-21; 8:45 am]
BILLING CODE 6717-01-P