Preliminary Effluent Guidelines Program Plan 15, 51155-51156 [2021-19787]
Download as PDF
Federal Register / Vol. 86, No. 175 / Tuesday, September 14, 2021 / Notices
are due shall be billed by Southwestern
to the Customer to adjust the end-of-
month loss energy balance to zero (0)
megawatthours and the Customer shall
be obliged to purchase such energy at
the following rates:
Rate per
kilowatthour
Months associated with charge
March, April, May, October, November, December ............................................................................................................................
January, February, June, July, August, September ............................................................................................................................
4.1.4. Real Power Losses delivered to
Southwestern by the Customer in excess
of the losses due during the month shall
be purchased by Southwestern from the
Customer at a rate per megawatthour
equal to Southwestern’s rate per
megawatthour for Supplemental
Peaking Energy, as set forth in
Southwestern’s then-effective Rate
Schedule for Hydro Peaking Power to
adjust such hourly end-of-month loss
energy balance to zero (0)
megawatthours.
1. Wholesale Rates, Terms, and
Conditions for Excess Energy
UNITED STATES DEPARTMENT OF
ENERGY
1.3. Excess Energy Charge
RATE SCHEDULE
tkelley on DSK125TN23PROD with NOTICES
Transmission service for the delivery
of Excess Energy shall be the sole
responsibility of such customer
purchasing Excess Energy.
BILLING CODE 6450–01–P
Effective: During the period October 1,
2013, through September 30, 2021,** in
accordance with the Federal Energy
Regulatory Commission (FERC) order
issued in Docket No. EF14–1–000 (Jan.
9, 2014), extension approved by the
Deputy Secretary in Docket No. EF14–
1–002 (Sept. 13, 2017), extension
approved by Assistant Secretary for
Electricity in Rate Order No. 74 (Sept.
22, 2019), and extension approved by
the Administrator in Rate Order No. 77
(August 30, 2021).
Available: In the marketing area of
Southwestern Power Administration
(Southwestern), described generally as
the States of Arkansas, Kansas,
Louisiana, Missouri, Oklahoma, and
Texas.
Applicable: To electric utilities
which, by contract, may purchase
Excess Energy from Southwestern.
Character and Conditions of Service:
Three-phase, alternating current,
delivered at approximately 60 Hertz, at
the nominal voltage(s) and at the
point(s) of delivery specified by
contract.
1 Supersedes
Rate Schedule EE–11.
** Extended through September 30, 2023, by
approval of Rate Order No. SWPA–77 by the
Administrator, Southwestern Power
Administration.
21:55 Sep 13, 2021
1.2. Transmission and Related Ancillary
Services
[FR Doc. 2021–19718 Filed 9–13–21; 8:45 am]
EE–13 1 **
WHOLESALE RATES FOR EXCESS
ENERGY
VerDate Sep<11>2014
Excess Energy will be furnished at
such times and in such amounts as
Southwestern determines to be
available.
$0.0094 per kilowatthour of Excess
Energy delivered.
SOUTHWESTERN POWER
ADMINISTRATION
Jkt 253001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2021–0547; FRL–5601.5–01–
OW]
RIN 2040–ZA38
Preliminary Effluent Guidelines
Program Plan 15
Environmental Protection
Agency (EPA).
ACTION: Notice of availability.
AGENCY:
This notice announces the
availability of the U.S. Environmental
Protection Agency’s (EPA) Preliminary
Effluent Guidelines Program Plan 15
(Preliminary Plan 15) and solicits public
comment. The Clean Water Act (CWA)
requires the EPA to biennially publish
a plan for new and revised effluent
limitations guidelines, after public
review and comment. Preliminary Plan
15 discusses EPA’s 2020 annual review
of effluent limitations guidelines and
pretreatment standards, presents the
agency’s preliminary review of specific
categories identified through the review,
provides an update on the analyses and
tools that EPA is continuing to develop,
and discusses several new and ongoing
rulemaking actions.
DATES: Comments must be received on
or before October 14, 2021.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
SUMMARY:
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
51155
$0.15
0.30
OW–2021–0547, to the Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Once submitted, comments cannot be
edited or withdrawn. EPA may publish
any comment received to its public
docket. Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Multimedia
submissions (audio, video, etc.) must be
accompanied by a written comment.
The written comment is considered the
official comment and should include
discussion of all points you wish to
make. EPA will generally not consider
comments or comment contents located
outside of the primary submission (i.e.
on the web, cloud, or other file sharing
system). For additional submission
methods, the full EPA public comment
policy, information about CBI and
multimedia submissions, and general
guidance on making effective
comments, please visit https://
www.epa.gov/dockets/commenting-epadockets.
FOR FURTHER INFORMATION CONTACT: Dr.
Phillip Flanders, Engineering and
Analysis Division, Office of Water,
4303T, U.S. Environmental Protection
Agency, 1200 Pennsylvania Avenue
NW, Washington, DC 20460; telephone
number: (202) 566–8323; fax number:
(202) 566–1053; email address:
flanders.phillip@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Supporting Documents
A key document providing additional
information is the Preliminary Effluent
Guidelines Program Plan 15 document.
Supporting documents providing
further details are also available for
review.
B. How can I get copies of these
documents and other related
information?
1. Docket. The EPA has established an
official public docket for these actions
under Docket ID No. EPA–HQ–OW–
2021–0547. The official public docket is
the collection of materials that are
available for public viewing at the Water
E:\FR\FM\14SEN1.SGM
14SEN1
51156
Federal Register / Vol. 86, No. 175 / Tuesday, September 14, 2021 / Notices
Docket in the EPA Docket Center, (EPA/
DC) EPA West, Room 3334, 1301
Constitution Ave. NW, Washington, DC
20460.
2. Electronic Access. You can access
this Federal Register document
electronically through the United States
Government online source for Federal
regulations at https://
www.regulations.gov.
3. Internet access. Copies of the
supporting documents are available at
https://www.epa.gov/eg/effluentguidelines-plan.
II. How is this document organized?
The outline of this document follows.
A. Legal Authority.
B. Summary of Preliminary Effluent
Guidelines Program Plan 15.
C. Request for Public Comments and
Information.
tkelley on DSK125TN23PROD with NOTICES
A. Legal Authority
This notice is published under the
authority of the CWA, 33 U.S.C. 1251,
et seq., and in particular sections 301(d),
304(b), 304(g), 304(m), 306, 307(b) and
308 of the Act, 33 U.S.C. 1311(d),
1314(b), 1314(g), 1314(m), 1316,
1317(b), and 1318.
B. Summary of Preliminary Effluent
Guidelines Program Plan 15
EPA prepares Preliminary Effluent
Guidelines Program Plans pursuant to
CWA section 304(m). Preliminary plans
provide a summary of the EPA’s annual
review of effluent limitations guidelines
and pretreatment standards, consistent
with CWA sections 301(d), 304(b),
304(g), 304(m), and 307(b). From these
reviews, preliminary plans identify any
new or existing industrial categories
selected for effluent limitations
guidelines or pretreatment standards
rulemakings and provide a schedule for
such rulemakings. In addition,
preliminary plans present any new or
existing categories of industry selected
for further review and analysis.
Preliminary Plan 15 discusses EPA’s
2020 annual review of effluent
limitations guidelines and pretreatment
standards, presents its preliminary
review of specific categories identified
through the review, provides an update
on the analyses and tools that EPA is
continuing to develop, and discusses
several new and ongoing rulemaking
actions.
EPA is initiating three new
rulemakings after concluding several
studies that were discussed in Plan 14.
After several years of collecting and
analyzing data, EPA has concluded that
revision of the following effluent
limitations guidelines or pretreatment
standards are warranted:
VerDate Sep<11>2014
21:55 Sep 13, 2021
Jkt 253001
1. Meat and Poultry Products pointsource category to address nutrient
discharges (see Section 6.2 of the
preliminary plan for additional
details)
2. Organic Chemicals, Plastics &
Synthetic Fibers point-source category
to address Per- and Polyfluoroalkyl
Substances (PFAS) discharges (see
Section 6.4 of the preliminary plan for
additional details)
3. Metal Finishing point-source category
to address PFAS discharges (see
Section 6.4 of the preliminary plan for
additional details)
Preliminary Plan 15 also discusses the
Steam Electric Generating category
rulemaking that the agency announced
on July 26, 2020. At that time, EPA
announced that the agency was
initiating a rulemaking process to
strengthen certain wastewater pollution
discharge limits for coal power plants
that use steam to generate electricity.
See Section 7.1 of the preliminary plan
for additional details.
Finally, Preliminary Plan 15 provides
updates on ongoing point source
category studies of the electrical and
electronic components category and the
Multi-Industry PFAS study and explains
the agency’s intention to take no further
action on oil and gas extraction
wastewater management. It also
discusses the initial results from EPA’s
review for the metal products and
machinery, explosives manufacturing,
canned and preserved seafood, sugar
processing, soap and detergent
manufacturing, and landfill point source
categories.
Preliminary Plan 15 can be found at
https://www.epa.gov/eg/effluentguidelines-plan.
C. Request for Public Comments and
Information
EPA requests comments and
information on the overall content of
Preliminary Plan 15. In particular, EPA
requests comments on the
announcements regarding ongoing
studies and rulemaking activities (see
Sections 6 and 7 of the plan for
additional details), and the topics
below. See Preliminary Plan 15 for more
information on these issues.
1. Reviews of Industrial Wastewater
Discharges and Treatment Technologies.
EPA solicits feedback on the crosscategory rankings analysis. To the extent
that any comment advocates for a
revision to existing effluent limitations
guidelines (ELGs), the commenter
should explain why EPA should
prioritize these point source categories
ahead of the ones that EPA is studying
and revising.
PO 00000
Frm 00059
Fmt 4703
Sfmt 9990
2. Membrane Wastewater Treatment
Technology.
EPA solicits comment on the
capabilities, performance, and costs of
membrane treatment technologies for
industrial wastewater to support the
membrane technology review.
3. Environmental Justice.
EPA solicits comment on how best to
incorporate environmental justice into
the ELG planning process.
4. PFAS Multi-Industry Study.
EPA solicits feedback on the findings
of the Multi-Industry PFAS study,
specifically findings from the pulp and
paper manufacturers and commercial
airports.
Radhika Fox,
Assistant Administrator.
[FR Doc. 2021–19787 Filed 9–13–21; 8:45 am]
BILLING CODE 6560–50–P
EXPORT-IMPORT BANK
Sunshine Act Meetings; Notice of
Open Meeting of the Advisory
Committee of the Export-Import Bank
of the United States (EXIM)
Thursday, September
30th, 2021 from 2:00–4:30 p.m. EDT.
TIME AND DATE:
The meeting will be held
virtually.
PLACE:
Public Participation: The
meeting will be open to public
participation and time will be allotted
for questions or comments submitted
online. Members of the public may also
file written statements before or after the
meeting to external@exim.gov.
Interested parties may register here for
the meeting.
STATUS:
Discussion
of EXIM policies and programs to
provide competitive financing to
expand United States exports and
comments for inclusion in EXIM’s
Report to the U.S. Congress on Global
Export Credit Competition.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
For further information, contact India
Walker, External Enagagement
Specialist, at 202–480–0062.
Joyce B. Stone,
Assistant Corporate Secretary.
[FR Doc. 2021–19931 Filed 9–10–21; 4:15 pm]
BILLING CODE 6690–01–P
E:\FR\FM\14SEN1.SGM
14SEN1
Agencies
[Federal Register Volume 86, Number 175 (Tuesday, September 14, 2021)]
[Notices]
[Pages 51155-51156]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19787]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OW-2021-0547; FRL-5601.5-01-OW]
RIN 2040-ZA38
Preliminary Effluent Guidelines Program Plan 15
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: This notice announces the availability of the U.S.
Environmental Protection Agency's (EPA) Preliminary Effluent Guidelines
Program Plan 15 (Preliminary Plan 15) and solicits public comment. The
Clean Water Act (CWA) requires the EPA to biennially publish a plan for
new and revised effluent limitations guidelines, after public review
and comment. Preliminary Plan 15 discusses EPA's 2020 annual review of
effluent limitations guidelines and pretreatment standards, presents
the agency's preliminary review of specific categories identified
through the review, provides an update on the analyses and tools that
EPA is continuing to develop, and discusses several new and ongoing
rulemaking actions.
DATES: Comments must be received on or before October 14, 2021.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-HQ-OW-
2021-0547, to the Federal eRulemaking Portal: https://www.regulations.gov. Follow the online instructions for submitting
comments. Once submitted, comments cannot be edited or withdrawn. EPA
may publish any comment received to its public docket. Do not submit
electronically any information you consider to be Confidential Business
Information (CBI) or other information whose disclosure is restricted
by statute. Multimedia submissions (audio, video, etc.) must be
accompanied by a written comment. The written comment is considered the
official comment and should include discussion of all points you wish
to make. EPA will generally not consider comments or comment contents
located outside of the primary submission (i.e. on the web, cloud, or
other file sharing system). For additional submission methods, the full
EPA public comment policy, information about CBI and multimedia
submissions, and general guidance on making effective comments, please
visit https://www.epa.gov/dockets/commenting-epa-dockets.
FOR FURTHER INFORMATION CONTACT: Dr. Phillip Flanders, Engineering and
Analysis Division, Office of Water, 4303T, U.S. Environmental
Protection Agency, 1200 Pennsylvania Avenue NW, Washington, DC 20460;
telephone number: (202) 566-8323; fax number: (202) 566-1053; email
address: [email protected].
SUPPLEMENTARY INFORMATION:
I. General Information
A. Supporting Documents
A key document providing additional information is the Preliminary
Effluent Guidelines Program Plan 15 document. Supporting documents
providing further details are also available for review.
B. How can I get copies of these documents and other related
information?
1. Docket. The EPA has established an official public docket for
these actions under Docket ID No. EPA-HQ-OW-2021-0547. The official
public docket is the collection of materials that are available for
public viewing at the Water
[[Page 51156]]
Docket in the EPA Docket Center, (EPA/DC) EPA West, Room 3334, 1301
Constitution Ave. NW, Washington, DC 20460.
2. Electronic Access. You can access this Federal Register document
electronically through the United States Government online source for
Federal regulations at https://www.regulations.gov.
3. Internet access. Copies of the supporting documents are
available at https://www.epa.gov/eg/effluent-guidelines-plan.
II. How is this document organized?
The outline of this document follows.
A. Legal Authority.
B. Summary of Preliminary Effluent Guidelines Program Plan 15.
C. Request for Public Comments and Information.
A. Legal Authority
This notice is published under the authority of the CWA, 33 U.S.C.
1251, et seq., and in particular sections 301(d), 304(b), 304(g),
304(m), 306, 307(b) and 308 of the Act, 33 U.S.C. 1311(d), 1314(b),
1314(g), 1314(m), 1316, 1317(b), and 1318.
B. Summary of Preliminary Effluent Guidelines Program Plan 15
EPA prepares Preliminary Effluent Guidelines Program Plans pursuant
to CWA section 304(m). Preliminary plans provide a summary of the EPA's
annual review of effluent limitations guidelines and pretreatment
standards, consistent with CWA sections 301(d), 304(b), 304(g), 304(m),
and 307(b). From these reviews, preliminary plans identify any new or
existing industrial categories selected for effluent limitations
guidelines or pretreatment standards rulemakings and provide a schedule
for such rulemakings. In addition, preliminary plans present any new or
existing categories of industry selected for further review and
analysis.
Preliminary Plan 15 discusses EPA's 2020 annual review of effluent
limitations guidelines and pretreatment standards, presents its
preliminary review of specific categories identified through the
review, provides an update on the analyses and tools that EPA is
continuing to develop, and discusses several new and ongoing rulemaking
actions.
EPA is initiating three new rulemakings after concluding several
studies that were discussed in Plan 14. After several years of
collecting and analyzing data, EPA has concluded that revision of the
following effluent limitations guidelines or pretreatment standards are
warranted:
1. Meat and Poultry Products point-source category to address nutrient
discharges (see Section 6.2 of the preliminary plan for additional
details)
2. Organic Chemicals, Plastics & Synthetic Fibers point-source category
to address Per- and Polyfluoroalkyl Substances (PFAS) discharges (see
Section 6.4 of the preliminary plan for additional details)
3. Metal Finishing point-source category to address PFAS discharges
(see Section 6.4 of the preliminary plan for additional details)
Preliminary Plan 15 also discusses the Steam Electric Generating
category rulemaking that the agency announced on July 26, 2020. At that
time, EPA announced that the agency was initiating a rulemaking process
to strengthen certain wastewater pollution discharge limits for coal
power plants that use steam to generate electricity. See Section 7.1 of
the preliminary plan for additional details.
Finally, Preliminary Plan 15 provides updates on ongoing point
source category studies of the electrical and electronic components
category and the Multi-Industry PFAS study and explains the agency's
intention to take no further action on oil and gas extraction
wastewater management. It also discusses the initial results from EPA's
review for the metal products and machinery, explosives manufacturing,
canned and preserved seafood, sugar processing, soap and detergent
manufacturing, and landfill point source categories.
Preliminary Plan 15 can be found at https://www.epa.gov/eg/effluent-guidelines-plan.
C. Request for Public Comments and Information
EPA requests comments and information on the overall content of
Preliminary Plan 15. In particular, EPA requests comments on the
announcements regarding ongoing studies and rulemaking activities (see
Sections 6 and 7 of the plan for additional details), and the topics
below. See Preliminary Plan 15 for more information on these issues.
1. Reviews of Industrial Wastewater Discharges and Treatment
Technologies.
EPA solicits feedback on the cross-category rankings analysis. To
the extent that any comment advocates for a revision to existing
effluent limitations guidelines (ELGs), the commenter should explain
why EPA should prioritize these point source categories ahead of the
ones that EPA is studying and revising.
2. Membrane Wastewater Treatment Technology.
EPA solicits comment on the capabilities, performance, and costs of
membrane treatment technologies for industrial wastewater to support
the membrane technology review.
3. Environmental Justice.
EPA solicits comment on how best to incorporate environmental
justice into the ELG planning process.
4. PFAS Multi-Industry Study.
EPA solicits feedback on the findings of the Multi-Industry PFAS
study, specifically findings from the pulp and paper manufacturers and
commercial airports.
Radhika Fox,
Assistant Administrator.
[FR Doc. 2021-19787 Filed 9-13-21; 8:45 am]
BILLING CODE 6560-50-P