Hardy Storage Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 50712-50713 [2021-19528]
Download as PDF
50712
Federal Register / Vol. 86, No. 173 / Friday, September 10, 2021 / Notices
Smith at alexander.smith@ferc.gov or
(202) 502–6601. For legal information,
please contact Adam Eldean at
adam.eldean@ferc.gov or (202) 502–
8047. For information related to
logistics, please contact Sarah McKinley
at sarah.mckinley@ferc.gov or (202)
502–8368.
Dated: September 3, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19531 Filed 9–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–487–000]
jbell on DSKJLSW7X2PROD with NOTICES
Hardy Storage Company, LLC; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 26, 2021,
Hardy Storage Company, LLC (HSC),
700 Louisiana Street, Houston, Texas
77002–2700, filed in the above
referenced docket a prior notice
pursuant to sections 157.205 and
157.214 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act, seeking
authorization to increase the maximum
storage capacity at the Hardy Storage
Field, located in Hardy and Hampshire
Counties, West Virginia, from 29.6
billion cubic feet (Bcf) to 31.07 Bcf. HSC
states this increase reflects the quantity
of additional base gas needed to
improve late season deliverability in the
Hardy Storage Field. HSC proposes this
maximum storage capacity increase
under authorities granted by its blanket
certificate issued in Docket No. CP05–
152–000,1 all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
1 113
FERC ¶ 61,118 (2005).
VerDate Sep<11>2014
18:09 Sep 09, 2021
Jkt 253001
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Hardy Storage
Company, LLC, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700,
phone: 832–320–5477, email: david_
alonzo@tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on November 2, 2021.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is November
2, 2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
2 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
3 Persons
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is November 2,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before November
2, 2021. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
5 18
6 18
E:\FR\FM\10SEN1.SGM
CFR 385.214.
CFR 157.10.
10SEN1
Federal Register / Vol. 86, No. 173 / Friday, September 10, 2021 / Notices
reference the Project docket number
CP21–487–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below.8 Your submission must reference
the Project docket number CP21–487–
000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700 or david_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
jbell on DSKJLSW7X2PROD with NOTICES
7 Additionally,
you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
8 Hand-delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
VerDate Sep<11>2014
18:09 Sep 09, 2021
Jkt 253001
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: September 3, 2021.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL21–92–000]
Carolinas Clean Energy Business
Association v. PJM Interconnection,
L.L.C. and Duke Energy Progress, LLC;
Notice of Withdrawal
September 3, 2021.
[FR Doc. 2021–19528 Filed 9–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP21–1096–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Agreement Update (SoCal
Sept–Oct 2021) to be effective 9/3/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5127.
Comment Date: 5 p.m. ET 9/14/21.
Docket Numbers: RP20–921–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: Refund Report: RP20–
921 Refund Report to be effective N/A.
Filed Date: 9/2/21.
Accession Number: 20210902–5092.
Comment Date: 5 p.m. ET 9/14/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 3, 2021.
Kimberly D. Bose,
Secretary.
On August 25, 2021, pursuant to Rule
216 of the Commission’s Rules of
Practice and Procedure,1 the Carolinas
Clean Energy Business Association
(CCEBA) filed a motion to withdraw its
complaint against PJM Interconnection,
L.L.C. (PJM) and Duke Energy Progress,
LLC (DEP), requesting expedited
treatment of the motion to withdraw. On
August 31, 2021, the Commission issued
a notice shortening the comment period
on the motion to withdraw to September
2, 2021.
CCEBA states that PJM and DEP have
committed to work with CCEBA to
consider the issues raised in the
complaint through settlement and to file
any resulting amendments to PJM and
DEP’s joint operating agreement with
the Commission under section 205 of
the Federal Power Act no later than
mid-December 2021.2 CCEBA further
states that such settlement will most
expeditiously resolve the issues
identified in the complaint, making
withdrawal preferable. CCEBA asserts
that its withdrawal is without prejudice
to CCEBA’s right to re-file the
complaint. CCEBA also states that PJM
and DEP have authorized CCEBA to
state that they do not oppose
withdrawal of the complaint.
Upon consideration, notice is hereby
given that CCEBA’s requested motion to
withdraw is granted, effective as of the
date of this notice.
Dated: September 3, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19529 Filed 9–9–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9058–3]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
[FR Doc. 2021–19530 Filed 9–9–21; 8:45 am]
1 18
BILLING CODE 6717–01–P
2 CCEBA
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
50713
E:\FR\FM\10SEN1.SGM
CFR 385.216(b) (2020).
Motion to Withdraw at 2.
10SEN1
Agencies
[Federal Register Volume 86, Number 173 (Friday, September 10, 2021)]
[Notices]
[Pages 50712-50713]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19528]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-487-000]
Hardy Storage Company, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on August 26, 2021, Hardy Storage Company, LLC
(HSC), 700 Louisiana Street, Houston, Texas 77002-2700, filed in the
above referenced docket a prior notice pursuant to sections 157.205 and
157.214 of the Federal Energy Regulatory Commission's regulations under
the Natural Gas Act, seeking authorization to increase the maximum
storage capacity at the Hardy Storage Field, located in Hardy and
Hampshire Counties, West Virginia, from 29.6 billion cubic feet (Bcf)
to 31.07 Bcf. HSC states this increase reflects the quantity of
additional base gas needed to improve late season deliverability in the
Hardy Storage Field. HSC proposes this maximum storage capacity
increase under authorities granted by its blanket certificate issued in
Docket No. CP05-152-000,\1\ all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
---------------------------------------------------------------------------
\1\ 113 FERC ] 61,118 (2005).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, Hardy Storage
Company, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, phone: 832-320-5477, email: [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on November 2, 2021.
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is November 2, 2021. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is November 2, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before November 2, 2021. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please
[[Page 50713]]
reference the Project docket number CP21-487-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below.\8\ Your submission must reference the Project docket
number CP21-487-000.
---------------------------------------------------------------------------
\8\ Hand-delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, 700 Louisiana Street, Suite
1300, Houston, Texas 77002-2700 or [email protected]. Any
subsequent submissions by an intervenor must be served on the applicant
and all other parties to the proceeding. Contact information for
parties can be downloaded from the service list at the eService link on
FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: September 3, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19528 Filed 9-9-21; 8:45 am]
BILLING CODE 6717-01-P